Get ProEvery project in every city · from $79/mo
Get Procommercial project · Miami, FL
Commercial General Building, Electrical, Hvac/Mechanical, Plumbing work permitted April 28, 2025, with 11 permits through January 6, 2026, declaring $892,500 of work. Contractor on record: Greystone Structural Inc.
Miami permit records name Greystone Structural Inc, Atexi Services Corp and Windglass Solution Inc as the contractors on this project, among 6 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
11 permits issued Apr 28 – Jan 6, newest first.
| Issued | Permit | Contractor | Value |
|---|
In Miami, biggest first.
| applied Dec 24 | #BD24029103007E001 REMODELING/REPAIRS · LOW VOLTAGE DATA-COMM LOW VOLTAGE DATA-COMM Status: Final | Atexi Services Corp | $1.8K |
| applied Nov 8 | #BD24029103005B001 REMODELING/REPAIRS · RAILINGS - METAL|STAIRS - METAL RAILINGS - METAL|STAIRS - METAL Status: Final | Greystone Structural Inc | $18K |
| applied Nov 8 | #BD24029103006B001 REMODELING/REPAIRS · STOREFRONT STOREFRONT Status: Final | Windglass Solution Inc | $14.4K |
| applied Nov 8 | #BD24029103004B001 REMODELING/REPAIRS · STRUCTURAL SUPPORT FOR EQUIPMENT STRUCTURAL SUPPORT FOR EQUIPMENT Status: Final | Greystone Structural Inc | $2.4K |
| applied Nov 3 | #BD24029103003E001 REMODELING/REPAIRS · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Atexi Services Corp | $500 |
| applied Dec 11 | #BD24029103001E001 REMODELING/REPAIRS · A/C CENTRAL|LIGHT SOCKET|NEW METER|ROUGH WIRING OUTLETS|NEW SERVICE|SUB-FEEDS|SWITCHBOARD/CONTROL PANEL|SERVICE <600 AMPS & 240V|WATER HEATER / BOILER A/C CENTRAL|LIGHT SOCKET|NEW METER|ROUGH WIRING OUTLETS|NEW SERVICE|SUB-FEEDS|SWITCHBOARD/CONTROL PANEL|SERVICE <600 AMPS & 240V|WATER HEATER / BOILER Status: Final | Atexi Services Corp | $175K |
| applied Dec 11 | #BD24029103001MA001 REMODELING/REPAIRS · A/C DRAIN|AC CENTRAL / HEATING SYSTEM|SHEET METAL WORK|EXHAUST VENTILATION A/C DRAIN|AC CENTRAL / HEATING SYSTEM|SHEET METAL WORK|EXHAUST VENTILATION Status: Final | Ruiz Construction Incorporated Dba Rci Group Inc | $120K |
| applied Dec 11 | #BD24029103001P001 REMODELING/REPAIRS · ALL TYPES OF AIR CONDITIONER DRAINS|ROUGHING FIXTURE: MISCELLANEOUS SINK|SETTING FIXTURE: MISCELLANEOUS SINK|ROUGHING FIXTURE: BATHTUB|SETTING FIXTURE: BATHTUB|ROUGHING FIXTURE: DISHWASHER|SETTING FIXTURE: DISHWASHER|ROUGHING FIXTURE: DRINKING FOUNTAIN|SETTING FIXTURE: DRINKING FOUNTAIN|ROUGHING FIXTURE: ELECTRIC WATER HEATER|SETTING FIXTURE: ELECTRIC WATER HEATER|CAPPED OFF: FIXTURE|ROUGHING FIXTURE: FLOOR DRAIN|SETTING FIXTURE: FLOOR DRAIN|HOSE BIB |ROUGHING FIXTURE: ICE MAKER|SETTING FIXTURE: ICE MAKER|ROUGHING FIXTURE: INDIRECT WASTE|SETTING FIXTURE: INDIRECT WASTE|ROUGHING FIXTURE: LAVATORY|SETTING FIXTURE: LAVATORY|MISCELLANEOUS SIPHON-BREAKERS |ROUGHING FIXTURE: SHOWER|SETTING FIXTURE: SHOWER|ROUGHING FIXTURE: TOILET / WATER CLOSET|SETTING FIXTURE: TOILET / WATER CLOSET|WATER SERVICE: WATER CONNECTION FROM METER|CAP OFF: INTERIOR / PARTIAL DEMO|COMMERCIAL BUILDING CONNECTION OUTSIDE ALL TYPES OF AIR CONDITIONER DRAINS|ROUGHING FIXTURE: MISCELLANEOUS SINK|SETTING FIXTURE: MISCELLANEOUS SINK|ROUGHING FIXTURE: BATHTUB|SETTING FIXTURE: BATHTUB|ROUGHING FIXTURE: DISHWASHER|SETTING FIXTURE: DISHWASHER|ROUGHING FIXTURE: DRINKING FOUNTAIN|SETTING FIXTURE: DRINKING FOUNTAIN|ROUGHING… Status: Final | Peninsula Plumbing Inc | $60K |
| applied Dec 11 | #BD24029103001PW001 REMODELING/REPAIRS · PAVING OR RESURFACING|DRIVEWAY APPROACH PAVING OR RESURFACING|DRIVEWAY APPROACH Status: Final | Greystone Structural Inc | — |
| applied Apr 29 | #BD24029103002P001 REMODELING/REPAIRS · TEMPORARY TOILETS: SITE INSTALLATION TEMPORARY TOILETS: SITE INSTALLATION Status: Final | PRECISION PORTABLES LLC/dba COASTAL WASTE & RECYCLING INC | $500 |
| applied Dec 11 | #BD24029103001B001 REMODELING/REPAIRS · RECREATIONAL ESTABLISHMENT RECREATIONAL ESTABLISHMENT Status: Final | Greystone Structural Inc | $500K |