Commercial General Building, Electrical, Fire Protection, Plumbing work permitted January 17, 2025, with 8 permits through April 7, 2025, declaring $1,551,869 of work. Contractor on record: Miller Electric Company.
PROFESSIONAL OFFICE / BANK / FINANCIAL INSTITUTION|RECREATIONAL ESTABLISHMENT
Miami permit records name Miller Electric Company, Convergint Technologies LLC and Summers Fire Sprinklers Inc. as the contractors on this project, among 6 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
8 permits issued Jan 17 – Apr 7, newest first.
| Issued | Permit | Contractor | Value |
|---|
In Miami, biggest first.
| applied Apr 2 | #BD24029883005E001 REMODELING/REPAIRS · LOW VOLTAGE COMPUTER / TV CABLE / PHONE TERMINAL LOW VOLTAGE COMPUTER / TV CABLE / PHONE TERMINAL Status: Final | Miller Electric Company | $1K |
| applied Feb 7 | #BD24029883004E001 REMODELING/REPAIRS · ELECTRICAL FOR FIRE ALARM ELECTRICAL FOR FIRE ALARM Status: Final | Convergint Technologies LLC | $121K |
| applied Jan 24 | #BD24029883002F001 REMODELING/REPAIRS · EXISTING FIRE SPRINKLER SYSTEM EXISTING FIRE SPRINKLER SYSTEM Status: Final | Summers Fire Sprinklers Inc. | $36.9K |
| applied Feb 7 | #BD24029883004F001 REMODELING/REPAIRS · EXISTING FIRE ALARM SYSTEM EXISTING FIRE ALARM SYSTEM Status: Final | Convergint Technologies LLC | $121K |
| applied Dec 19 | #BD24029883001P001 REMODELING/REPAIRS · ALL TYPES OF AIR CONDITIONER DRAINS|ROUGHING FIXTURE: MISCELLANEOUS SINK|SETTING FIXTURE: MISCELLANEOUS SINK|WATER SERVICE: EXTENSION TO CONNECTION|ROUGHING FIXTURE: FLOOR DRAIN|SETTING FIXTURE: FLOOR DRAIN|SANITARY SEWER: INSIDE CONNECTION|ROUGHING FIXTURE: LAVATORY|SETTING FIXTURE: LAVATORY|ROUGHING FIXTURE: SHOWER|SETTING FIXTURE: SHOWER|ROUGHING FIXTURE: TOILET / WATER CLOSET|SETTING FIXTURE: TOILET / WATER CLOSET ALL TYPES OF AIR CONDITIONER DRAINS|ROUGHING FIXTURE: MISCELLANEOUS SINK|SETTING FIXTURE: MISCELLANEOUS SINK|WATER SERVICE: EXTENSION TO CONNECTION|ROUGHING FIXTURE: FLOOR DRAIN|SETTING FIXTURE: FLOOR DRAIN|SANITARY SEWER: INSIDE CONNECTION|ROUGHING FIXTURE: LAVATORY|SETTING FIXTURE:… Status: Final | A Better Inc | $100K |
| applied Dec 19 | #BD24029883001MA001 REMODELING/REPAIRS · SHEET METAL WORK|FIBERGLASS DUCTWORK SHEET METAL WORK|FIBERGLASS DUCTWORK Status: Final | Quamec Corp | $60K |
| applied Dec 19 | #BD24029883001E001 REMODELING/REPAIRS · A/C CENTRAL|LIGHT SOCKET|ROUGH WIRING OUTLETS|PARTIAL DEMOLITION ELECTRICAL |PHOTOELECTRIC SWITCH|SERVICE REPAIR|SUB-FEEDS|SWITCHBOARD/CONTROL PANEL|TRANSFORMER A/C CENTRAL|LIGHT SOCKET|ROUGH WIRING OUTLETS|PARTIAL DEMOLITION ELECTRICAL |PHOTOELECTRIC SWITCH|SERVICE REPAIR|SUB-FEEDS|SWITCHBOARD/CONTROL PANEL|TRANSFORMER Status: Final | Miller Electric Company | $200K |
| applied Dec 19 | #BD24029883001B001 REMODELING/REPAIRS · PROFESSIONAL OFFICE / BANK / FINANCIAL INSTITUTION|RECREATIONAL ESTABLISHMENT PROFESSIONAL OFFICE / BANK / FINANCIAL INSTITUTION|RECREATIONAL ESTABLISHMENT Status: Final | Moss & Associates LLC | $1M |