Multifamily General Building, Fire Protection, Hvac/Mechanical, Plumbing, Roofing work permitted July 22, 2025, with 23 permits through October 29, 2026, declaring $172,425,846 of work. Contractor on record: COASTAL CONSTRUCTION OF Miami Dade Inc dba COASTAL CONDOMINIUMS II.
Get new commercial permits in Miami, free weekly email
RETAIL OF GOODS:SUPERMARKET/CLOTHING/FURNITURE/BOOK STORE/ART PRODUCTS|MULTI-FAMILY (RENTAL)|OUTDOOR SPORTS COURT
Miami permit records name COASTAL CONSTRUCTION OF Miami Dade Inc dba COASTAL CONDOMINIUMS II, JC & A Electrical Contractors Inc and GM&P Consulting And Glazing Contractors Inc as the contractors on this project, among 11 contractors in all.
The contractor on 3 permits issued in the last 30 days is included with Pro.
In Miami, biggest first.
23 permits issued Jul 22 – Oct 29, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jul 30 | #BD24009935038F001 NEW CONSTRUCTION · NEW FIRE ALARM SYSTEM NEW FIRE ALARM SYSTEM Status: Active | Contractor with Pro | $230K |
| applied Jul 30 | #BD24009935038E001 NEW CONSTRUCTION · ACCESS CONTROL ACCESS CONTROL Status: Active | Contractor with Pro | $230K |
| applied Jul 31 | #BD24009935039B001 NEW CONSTRUCTION · POST TENSION POST TENSION Status: Active | Contractor with Pro | $88K |
| applied Sep 3 | #BD24009935041E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Active | JC & A Electrical Contractors Inc | $2K |
| applied Jun 8 | #BD24009935028B001 NEW CONSTRUCTION · POST TENSION POST TENSION Status: Active | COASTAL CONSTRUCTION OF Miami Dade Inc dba COASTAL CONDOMINIUMS II | $1K |
| applied Dec 9 | #BD24009935013F001 NEW CONSTRUCTION · BACKFLOW PREVENTER|FIRE PUMP|HOSE VALVE/OUTLET|JOCKEY PUMP|NEW FIRE SPRINKLER SYSTEM|FIRE DEPARTMENT CONNECTION|STANDPIPE BACKFLOW PREVENTER|FIRE PUMP|HOSE VALVE/OUTLET|JOCKEY PUMP|NEW FIRE SPRINKLER SYSTEM|FIRE DEPARTMENT CONNECTION|STANDPIPE Status: Active | Polaris Fire Protection Inc. | $1.9M |
| applied Apr 30 | #BD24009935022B001 NEW CONSTRUCTION · WINDOWS|REGULAR EXTERIOR:DOORS WINDOWS|REGULAR EXTERIOR:DOORS Status: Active | GM&P Consulting And Glazing Contractors Inc | $1.9M |
| applied Jun 5 | #BD24009935026B001 NEW CONSTRUCTION · RAILINGS-GLASS RAILINGS-GLASS Status: Active | GM&P Consulting And Glazing Contractors Inc | $694K |
| applied Apr 24 | #BD24009935021E001 NEW CONSTRUCTION · LOW VOLTAGE DATA-COMM LOW VOLTAGE DATA-COMM Status: Active | JC & A Electrical Contractors Inc | $20K |
| applied May 8 | #BD24009935023E001 NEW CONSTRUCTION · ELECTRICAL FOR FIRE ALARM ELECTRICAL FOR FIRE ALARM Status: Active | Tropical Fire & Security Systems Inc | $839K |
| applied May 8 | #BD24009935023F001 NEW CONSTRUCTION · NEW FIRE ALARM SYSTEM NEW FIRE ALARM SYSTEM Status: Active | Tropical Fire & Security Systems Inc | $839K |
| applied Apr 26 | #BD24009935001PG001 NEW CONSTRUCTION · ADDITIONAL METERS|APPLIANCE SET: BOILER|ROUGH OUTLET: BOILER|SAFETY VALVE|APPLIANCE SET: POOL HEATER|ROUGH OUTLET: WATER HEATER / POOL HEATER ADDITIONAL METERS|APPLIANCE SET: BOILER|ROUGH OUTLET: BOILER|SAFETY VALVE|APPLIANCE SET: POOL HEATER|ROUGH OUTLET: WATER HEATER / POOL HEATER Status: Active | Elite Gas Contractor Inc. | $100K |
| applied Feb 24 | #BD24009935015B001 NEW CONSTRUCTION · POST TENSION POST TENSION Status: Active | COASTAL CONSTRUCTION OF Miami Dade Inc dba COASTAL CONDOMINIUMS II | $1K |
| applied Apr 9 | #BD24009935020P001 NEW CONSTRUCTION · LAWN SPRINKLER SYSTEM LAWN SPRINKLER SYSTEM Status: Active | Arazoza Brothers Corporation | $99K |
| applied Mar 2 | #BD24009935016E001 NEW CONSTRUCTION · CCTV|LOW VOLTAGE DATA-COMM|LOW VOLTAGE SOUND / SPEAKER SYSTEM CCTV|LOW VOLTAGE DATA-COMM|LOW VOLTAGE SOUND / SPEAKER SYSTEM Status: Active | Homesmart Technologies Inc. Dba Skylight Technologies Inc | $247K |
| applied Apr 26 | #BD24009935001PW001 NEW CONSTRUCTION · BUILDING LINE AND GRADE SURVEY|PAVING OR RESURFACING BUILDING LINE AND GRADE SURVEY|PAVING OR RESURFACING Status: Active | COASTAL CONSTRUCTION OF Miami Dade Inc dba COASTAL CONDOMINIUMS II | — |
| applied Oct 6 | #BD24009935012P001 NEW CONSTRUCTION · PAVING AND DRAINAGE PAVING AND DRAINAGE Status: Active | Solution Construction Inc | $10K |
| applied Apr 26 | #BD24009935001P001 NEW CONSTRUCTION · ALL TYPES OF AIR CONDITIONER DRAINS|AREA DRAIN INLET |ROUGHING FIXTURE: MISCELLANEOUS SINK|SETTING FIXTURE: MISCELLANEOUS SINK|ROUGHING FIXTURE: MOP SINK|SETTING FIXTURE: MOP SINK|ROUGHING FIXTURE: BATHTUB|SETTING FIXTURE: BATHTUB|ROUGHING: RWL / STORM DRAIN|ROUGHING FIXTURE: DISHWASHER|SETTING FIXTURE: DISHWASHER|ROUGHING FIXTURE: DISPOSAL|SETTING FIXTURE: DISPOSAL|ROUGHING FIXTURE: ELECTRIC WATER HEATER|SETTING FIXTURE: ELECTRIC WATER HEATER|ROUGHING FIXTURE: FLOOR DRAIN|SETTING FIXTURE: FLOOR DRAIN|HOSE BIB |INTERCEPTORS & SEPARATORS |ROUGHING FIXTURE: KITCHEN SINK|SETTING FIXTURE: KITCHEN SINK|ROUGHING FIXTURE: LAUNDRY TRAY / WASHER|SETTING FIXTURE: LAUNDRY TRAY / WASHER|ROUGHING FIXTURE: LAVATORY|MISCELLANEOUS SIPHON-BREAKERS |ROOF DRAIN / ROUGH & INLET |ROUGHING IN FOR ROOF DRAIN |ROUGHING FIXTURE: SHOWER|SETTING FIXTURE: SHOWER|STORM SEWER |SUMP PUMP|ROUGHING FIXTURE: TOILET / WATER CLOSET|SETTING FIXTURE: TOILET / WATER CLOSET|ROUGHING FIXTURE: URINAL|SETTING FIXTURE: URINAL|WATER SERVICE: WATER CONNECTION FROM METER|BACKFLOW UP TO 2""|GREASE TRAP|SUB-METER|COMMERCIAL BUILDING CONNECTION OUTSIDE |DOMESTIC PUMP ALL TYPES OF AIR CONDITIONER DRAINS|AREA DRAIN INLET |ROUGHING FIXTURE: MISCELLANEOUS SINK|SETTING FIXTURE: MISCELLANEOUS SINK|ROUGHING FIXTURE: MOP SINK|SETTING FIXTURE: MOP SINK|ROUGHING FIXTURE: BATHTUB|SETTING FIXTURE: BATHTUB|ROUGHING: RWL / STORM DRAIN|ROUGHING FIXTURE: DISHWASHER|SETTING… Status: Active | Aurora Plumbing Corporation | $9M |
| applied Apr 26 | #BD24009935001MA001 NEW CONSTRUCTION · COOLING TOWER|AC CENTRAL / HEATING SYSTEM|PRESSURE / PROCESS PIPING |SHEET METAL WORK|STATIONARY GENERATOR (MECH)|EXHAUST VENTILATION|INSULATION OF HVAC PIPING AND METAL DUCT|DUCTLESS MINI-SPLIT SYSTEM COOLING TOWER|AC CENTRAL / HEATING SYSTEM|PRESSURE / PROCESS PIPING |SHEET METAL WORK|STATIONARY GENERATOR (MECH)|EXHAUST VENTILATION|INSULATION OF HVAC PIPING AND METAL DUCT|DUCTLESS MINI-SPLIT SYSTEM Status: Active | A & P Air Conditioning Corporation | $9.7M |
| applied Sep 29 | #BD24009935011B001 NEW CONSTRUCTION · POST TENSION POST TENSION Status: Active | COASTAL CONSTRUCTION OF Miami Dade Inc dba COASTAL CONDOMINIUMS II | $260K |
| applied Sep 15 | #BD24009935005B001 NEW CONSTRUCTION · SHORING / RE-SHORING SHORING / RE-SHORING Status: Final | COASTAL CONSTRUCTION OF Miami Dade Inc dba COASTAL CONDOMINIUMS II | $415K |
| applied Apr 26 | #BD24009935001E001 NEW CONSTRUCTION · A/C CENTRAL|CLOTHES WASHERS|DEEP FREEZER|DISH WASHER|DRYERS|EXHAUST / BATHROOM FAN|LOW VOLTAGE COMPUTER / TV CABLE / PHONE TERMINAL|ROUGH WIRING OUTLETS|RANGE|RANGE TOP|REFRIGERATORS COMMERCIAL|REFRIGERATORS DOMESTIC|SUB-FEEDS|SWITCHBOARD/CONTROL PANEL|SERVICE >600 AMPS AND 240V|WATER HEATER / BOILER|TRANSFORMER A/C CENTRAL|CLOTHES WASHERS|DEEP FREEZER|DISH WASHER|DRYERS|EXHAUST / BATHROOM FAN|LOW VOLTAGE COMPUTER / TV CABLE / PHONE TERMINAL|ROUGH WIRING OUTLETS|RANGE|RANGE TOP|REFRIGERATORS COMMERCIAL|REFRIGERATORS DOMESTIC|SUB-FEEDS|SWITCHBOARD/CONTROL PANEL|SERVICE >600 AMPS AND 240V|WATER HEATER /… Status: Active | JC & A Electrical Contractors Inc | $11.9M |
| applied Apr 26 | #BD24009935001B001 NEW CONSTRUCTION · RETAIL OF GOODS:SUPERMARKET/CLOTHING/FURNITURE/BOOK STORE/ART PRODUCTS|MULTI-FAMILY (RENTAL)|OUTDOOR SPORTS COURT RETAIL OF GOODS:SUPERMARKET/CLOTHING/FURNITURE/BOOK STORE/ART PRODUCTS|MULTI-FAMILY (RENTAL)|OUTDOOR SPORTS COURT Status: Active | COASTAL CONSTRUCTION OF Miami Dade Inc dba COASTAL CONDOMINIUMS II | $135M |