Get ProEvery project in every city · from $79/mo
Get Procommercial project · Miami, FL
Commercial General Building, Fire Protection, Hvac/Mechanical, Roofing work permitted March 19, 2026, with 20 permits through April 23, 2026, declaring $104,685,158 of work. Contractor on record: Finfrock Construction LLC.
Get new commercial permits in Miami, free weekly email
CHAIN LINK FENCE |POLE / BOLLARDS|BUILDING OFFICIAL (TO BE REMOVED BEFORE TCO/CO)|PARKING GARAGE-MULTIPLE FLOORS
Miami permit records name Finfrock Construction LLC, Convergint Technologies LLC and Downrite Engineering Corp as the contractors on this project, among 11 contractors in all.
20 permits issued Mar 19 – Apr 23, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
In Miami, biggest first.
| applied Mar 31 |
#BD24019509015E001 NEW CONSTRUCTION · LOW VOLTAGE SECURITY CAMERAS LOW VOLTAGE SECURITY CAMERAS Status: Active |
| Mastec Network Solutions LLC |
| $100K |
| applied Mar 27 | #BD24019509012B001 NEW CONSTRUCTION · LOUVRES LOUVRES Status: Final | Finfrock Construction LLC | $10K |
| applied Mar 23 | #BD24019509006E001 NEW CONSTRUCTION · ELECTRICAL FOR FIRE ALARM ELECTRICAL FOR FIRE ALARM Status: Active | Convergint Technologies LLC | $25K |
| applied Mar 20 | #BD24019509005F001 NEW CONSTRUCTION · BACKFLOW PREVENTER|FIRE PUMP|HOSE VALVE/OUTLET|JOCKEY PUMP|NEW FIRE SPRINKLER SYSTEM|FIRE DEPARTMENT CONNECTION BACKFLOW PREVENTER|FIRE PUMP|HOSE VALVE/OUTLET|JOCKEY PUMP|NEW FIRE SPRINKLER SYSTEM|FIRE DEPARTMENT CONNECTION Status: Final | Wayne Automatic Fire Sprinklers Inc. | $50K |
| applied Mar 27 | #BD24019509011B001 NEW CONSTRUCTION · DECK WATERPROOFING DECK WATERPROOFING Status: Active | Finfrock Construction LLC | $10K |
| applied Mar 23 | #BD24019509007B001 NEW CONSTRUCTION · RAILINGS - METAL RAILINGS - METAL Status: Final | Finfrock Construction LLC | $20K |
| applied Mar 23 | #BD24019509006F001 NEW CONSTRUCTION · NEW FIRE ALARM SYSTEM NEW FIRE ALARM SYSTEM Status: Active | Convergint Technologies LLC | $50K |
| applied Mar 30 | #BD24019509014P001 NEW CONSTRUCTION · PAVING AND DRAINAGE PAVING AND DRAINAGE Status: Final | Downrite Engineering Corp | $20K |
| applied Mar 27 | #BD24019509010B001 NEW CONSTRUCTION · REGULAR EXTERIOR:DOORS REGULAR EXTERIOR:DOORS Status: Final | Finfrock Construction LLC | $10K |
| applied Mar 23 | #BD24019509008B001 NEW CONSTRUCTION · STOREFRONT STOREFRONT Status: Final | Ready Window Sales & Service Corp | $30K |
| applied Mar 27 | #BD24019509009B001 NEW CONSTRUCTION · GARAGE OR ROLL-UP DOOR GARAGE OR ROLL-UP DOOR Status: Active | Finfrock Construction LLC | $10K |
| applied Mar 20 | #BD24019509002F001 NEW CONSTRUCTION · WATER SUPPLY / FIRELINE WATER SUPPLY / FIRELINE Status: Final | Downrite Engineering Corp | $10K |
| applied Mar 27 | #BD24019509013B001 NEW CONSTRUCTION · GRILLE GRILLE Status: Final | Componenti USA LLC | $10K |
| applied Aug 16 | #BD24019509001MA001 NEW CONSTRUCTION · A/C DRAIN|STATIONARY GENERATOR (MECH)|EXHAUST VENTILATION|FIBERGLASS DUCTWORK|DUCTLESS MINI-SPLIT SYSTEM A/C DRAIN|STATIONARY GENERATOR (MECH)|EXHAUST VENTILATION|FIBERGLASS DUCTWORK|DUCTLESS MINI-SPLIT SYSTEM Status: Active | Armstrong Air & Electric Inc. | $77K |
| applied Mar 20 | #BD24019509004B001 NEW CONSTRUCTION · BARRIER CABLE SYSTEMS BARRIER CABLE SYSTEMS Status: Final | General Building Services | $20K |
| applied Aug 16 | #BD24019509001E001 NEW CONSTRUCTION · A/C CENTRAL|EMPTY CONDUIT INSTALLATION|FIXTURE HEADS|LIGHT SOCKET|MOTOR|NEW METER|ROUGH WIRING OUTLETS|LIGHT POLES|NEW SERVICE|SUB-FEEDS|SWITCHBOARD/CONTROL PANEL|SERVICE >600 AMPS AND 240V|TIME CLOCK|GENERATOR (COMMERCIAL / MULTIFAMILY)|TRANSFORMER|LIGHTNING PROTECTION SYSTEM (GROUND) A/C CENTRAL|EMPTY CONDUIT INSTALLATION|FIXTURE HEADS|LIGHT SOCKET|MOTOR|NEW METER|ROUGH WIRING OUTLETS|LIGHT POLES|NEW SERVICE|SUB-FEEDS|SWITCHBOARD/CONTROL PANEL|SERVICE >600 AMPS AND 240V|TIME CLOCK|GENERATOR (COMMERCIAL / MULTIFAMILY)|TRANSFORMER|LIGHTNING PROTECTION SYSTEM (GROUND) Status: Active | Copperline Electric Inc | $25M |
| applied Aug 16 | #BD24019509001P001 NEW CONSTRUCTION · FRENCH DRAIN |HOSE BIB |INTERCEPTORS & SEPARATORS |MANHOLE |MISCELLANEOUS SIPHON-BREAKERS |ROOF DRAIN / ROUGH & INLET |SUMP PUMP|WATER SERVICE: WATER CONNECTION FROM METER|COMMERCIAL BUILDING CONNECTION OUTSIDE FRENCH DRAIN |HOSE BIB |INTERCEPTORS & SEPARATORS |MANHOLE |MISCELLANEOUS SIPHON-BREAKERS |ROOF DRAIN / ROUGH & INLET |SUMP PUMP|WATER SERVICE: WATER CONNECTION FROM METER|COMMERCIAL BUILDING CONNECTION OUTSIDE Status: Active | Patriotic Plumbing Inc. | $1.4M |
| applied Mar 20 | #BD24019509003E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Copperline Electric Inc | $1K |
| applied Aug 16 | #BD24019509001PG001 NEW CONSTRUCTION · APPLIANCE SET: GAS GENERATOR |ROUGH OUTLET: GAS GENERATOR / FUTURE GAS LINE CONNECTION APPLIANCE SET: GAS GENERATOR |ROUGH OUTLET: GAS GENERATOR / FUTURE GAS LINE CONNECTION Status: Final | Patriotic Plumbing Inc. | $5K |
| applied Aug 16 | #BD24019509001B001 NEW CONSTRUCTION · CHAIN LINK FENCE |POLE / BOLLARDS|BUILDING OFFICIAL (TO BE REMOVED BEFORE TCO/CO)|PARKING GARAGE-MULTIPLE FLOORS CHAIN LINK FENCE |POLE / BOLLARDS|BUILDING OFFICIAL (TO BE REMOVED BEFORE TCO/CO)|PARKING GARAGE-MULTIPLE FLOORS Status: Active | Finfrock Construction LLC | $78M |