Get ProEvery project in every city · from $79/mo
Get Procommercial project · Miami, FLNew: first permit Oct 14
Commercial General Building, Electrical, Hvac/Mechanical work permitted October 14, 2026, with 4 permits through October 16, 2026, declaring $328,000 of work.
JUICE BAR / COFFEE SHOP/BAKERY/DELI/ICE CREAM SHOP/CIGAR BAR|MINOR REPAIRS-COMMERCIAL
This is a new project: its first permit was issued October 14, 2026. The contractor on it is included with Pro, with the phone number, and is named here 30 days after the first permit.
See the contractor4 permits issued Oct 14 – Oct 16, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jul 15 | #BD26016791001E001 |
REMODELING/REPAIRS · DISH WASHER|LIGHT SOCKET|MOTOR|ROUGH WIRING OUTLETS|RANGE|REFRIGERATORS COMMERCIAL|SUB-FEEDS|SWITCHBOARD/CONTROL PANEL
DISH WASHER|LIGHT SOCKET|MOTOR|ROUGH WIRING OUTLETS|RANGE|REFRIGERATORS COMMERCIAL|SUB-FEEDS|SWITCHBOARD/CONTROL PANEL
Status: Active
| Contractor with Pro |
| $45K |
| applied Jul 15 | #BD26016791001MA001 REMODELING/REPAIRS · SHEET METAL WORK|EXHAUST VENTILATION|FIBERGLASS DUCTWORK SHEET METAL WORK|EXHAUST VENTILATION|FIBERGLASS DUCTWORK Status: Active | Contractor with Pro | $18K |
| applied Jul 15 | #BD26016791001P001 REMODELING/REPAIRS · ALL TYPES OF AIR CONDITIONER DRAINS|ROUGHING FIXTURE: MISCELLANEOUS SINK|SETTING FIXTURE: MISCELLANEOUS SINK|ROUGHING FIXTURE: MOP SINK|SETTING FIXTURE: MOP SINK|ROUGHING FIXTURE: ELECTRIC WATER HEATER|SETTING FIXTURE: ELECTRIC WATER HEATER|ROUGHING FIXTURE: FLOOR DRAIN|SETTING FIXTURE: FLOOR DRAIN|HOSE BIB |ROUGHING FIXTURE: ICE MAKER|SETTING FIXTURE: ICE MAKER|ROUGHING FIXTURE: INDIRECT WASTE|SETTING FIXTURE: INDIRECT WASTE|INTERCEPTORS & SEPARATORS |ROUGHING FIXTURE: KITCHEN SINK|SETTING FIXTURE: KITCHEN SINK|ROUGHING FIXTURE: LAVATORY|SETTING FIXTURE: LAVATORY|MISCELLANEOUS SIPHON-BREAKERS |RE-PIPING OR REPAIRS |ROUGHING FIXTURE: TOILET / WATER CLOSET|SETTING FIXTURE: TOILET / WATER CLOSET|GREASE TRAP|SUB-METER|COMMERCIAL BUILDING CONNECTION OUTSIDE ALL TYPES OF AIR CONDITIONER DRAINS|ROUGHING FIXTURE: MISCELLANEOUS SINK|SETTING FIXTURE: MISCELLANEOUS SINK|ROUGHING FIXTURE: MOP SINK|SETTING FIXTURE: MOP SINK|ROUGHING FIXTURE: ELECTRIC WATER HEATER|SETTING FIXTURE: ELECTRIC WATER HEATER|ROUGHING FIXTURE: FLOOR DRAIN|SETTING FIXTURE: FLOOR… Status: Active | Contractor with Pro | $40K |
| applied Jul 15 | #BD26016791001B001 REMODELING/REPAIRS · JUICE BAR / COFFEE SHOP/BAKERY/DELI/ICE CREAM SHOP/CIGAR BAR|MINOR REPAIRS-COMMERCIAL JUICE BAR / COFFEE SHOP/BAKERY/DELI/ICE CREAM SHOP/CIGAR BAR|MINOR REPAIRS-COMMERCIAL Status: Active | Contractor with Pro | $225K |