Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Miami, FL
Multifamily General Building, Electrical, Fire Protection, Hvac/Mechanical, Mep, Plumbing, Roofing work permitted June 4, 2025, with 78 permits through October 6, 2026, declaring $93,443,062 of work. Contractor on record: Integrated Electrical Services of Dade Inc.
Get new commercial permits in Miami, free weekly email
MULTI-FAMILY (RENTAL)|PARKING GARAGE-MULTIPLE FLOORS
Miami permit records name Integrated Electrical Services of Dade Inc, Shawmut Design And Construction and A & P Air Conditioning Corporation as the contractors on this project, among 18 contractors in all.
In Miami, biggest first.
78 permits issued Jun 4 – Oct 6, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jul 7 | #BD23003086075F001 NEW CONSTRUCTION · FIRE BDA / COMMUNICATIONS (FIRE MASTER PERMIT) FIRE BDA / COMMUNICATIONS (FIRE MASTER PERMIT) Status: Active | Contractor with Pro | $52.3K |
| applied Jul 7 | #BD23003086075E001 NEW CONSTRUCTION · ELECTRICAL BDA / COMMUNICATIONS (ONLY SUB OF FIRE MASTER) ELECTRICAL BDA / COMMUNICATIONS (ONLY SUB OF FIRE MASTER) Status: Active | Contractor with Pro | $52.3K |
| applied Sep 9 | #BD23003086081P001 NEW CONSTRUCTION · DISCHARGE WELL DISCHARGE WELL Status: Final | A.C. SCHULTES OF FLORIDA INC.dba Jaffer Well Drilling | $10K |
| applied Sep 2 | #BD23003086080B001 NEW CONSTRUCTION · RAILINGS - METAL RAILINGS - METAL Status: Final | Shawmut Design And Construction | $70K |
| applied Aug 11 | #BD23003086079B001 NEW CONSTRUCTION · ALUMINIUM CLAD CANOPY ALUMINIUM CLAD CANOPY Status: Final | Shawmut Design And Construction | $100K |
| applied Feb 26 | #BD23003086062F001 NEW CONSTRUCTION · EXISTING FIRE ALARM SYSTEM EXISTING FIRE ALARM SYSTEM Status: Final | SR Tech & Services Corp | $30K |
| applied Jul 14 | #BD23003086076F001 NEW CONSTRUCTION · GAS / DIESEL TANK REMOVAL OR INSTALLATION GAS / DIESEL TANK REMOVAL OR INSTALLATION Status: Final | Integrated Electrical Services of Dade Inc | $10K |
| applied Jul 14 | #BD23003086076E001 NEW CONSTRUCTION · COMMERCIAL OUTLET (EXCEPT PAINTING) COMMERCIAL OUTLET (EXCEPT PAINTING) Status: Final | Integrated Electrical Services of Dade Inc | $2K |
| applied Jul 14 | #BD23003086076MA001 NEW CONSTRUCTION · GAS / DIESEL TANK INSTALLATION GAS / DIESEL TANK INSTALLATION Status: Final | A & P Air Conditioning Corporation | $10K |
| applied Jul 21 | #BD23003086077B001 NEW CONSTRUCTION · GARAGE OR ROLL-UP DOOR GARAGE OR ROLL-UP DOOR Status: Final | Shawmut Design And Construction | $60K |
| applied Jul 23 | #BD23003086015MA001 NEW CONSTRUCTION · GAS / DIESEL DISPENSER INSTALL GAS / DIESEL DISPENSER INSTALL Status: Final | Cypress Construction Group LLC | $20K |
| applied Jul 23 | #BD23003086015E001 NEW CONSTRUCTION · COMMERCIAL OUTLET (EXCEPT PAINTING) COMMERCIAL OUTLET (EXCEPT PAINTING) Status: Final | Integrated Electrical Services of Dade Inc | $4K |
| applied Jul 7 | #BD23003086013B001 NEW CONSTRUCTION · STOREFRONT STOREFRONT Status: Active | All American Windows And Doors Incorporated | $2.1M |
| applied May 4 | #BD23003086073B001 NEW CONSTRUCTION · LOUVRES LOUVRES Status: Final | A & P Air Conditioning Corporation | $5K |
| applied May 8 | #BD23003086074B001 NEW CONSTRUCTION · LIGHT GAUGE STEEL FRAMING|EIFS/CLADDING LIGHT GAUGE STEEL FRAMING|EIFS/CLADDING Status: Final | Shawmut Design And Construction | $285K |
| applied Apr 7 | #BD23003086072B001 NEW CONSTRUCTION · REGULAR EXTERIOR:DOORS REGULAR EXTERIOR:DOORS Status: Final | Shawmut Design And Construction | $1M |
| applied Feb 9 | #BD23003086001PW001 NEW CONSTRUCTION · BUILDING LINE AND GRADE SURVEY|PAVING OR RESURFACING BUILDING LINE AND GRADE SURVEY|PAVING OR RESURFACING Status: Active | Rock Power Paving Inc | — |
| applied Feb 26 | #BD23003086062E001 NEW CONSTRUCTION · LOW VOLTAGE DATA-COMM LOW VOLTAGE DATA-COMM Status: Final | SR Tech & Services Corp | $32K |
| applied Mar 24 | #BD23003086063E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $80 |
| applied Mar 25 | #BD23003086064E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.5K |
| applied Mar 25 | #BD23003086070E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.5K |
| applied Aug 27 | #BD23003086025P001 NEW CONSTRUCTION · PAVING AND DRAINAGE PAVING AND DRAINAGE Status: Final | Rock Power Paving Inc | $213K |
| applied Mar 25 | #BD23003086067E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.5K |
| applied Mar 25 | #BD23003086066E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.5K |
| applied Mar 25 | #BD23003086065E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.5K |
| applied Mar 25 | #BD23003086069E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.5K |
| applied Mar 25 | #BD23003086068E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.5K |
| applied Nov 21 | #BD23003086055BR001 NEW CONSTRUCTION · FLAT ROOF FLAT ROOF Status: Final | Vico Painting Contractors LLC | $228K |
| applied Feb 20 | #BD23003086060B001 NEW CONSTRUCTION · GATE MANUAL GATE MANUAL Status: Final | Shawmut Design And Construction | $5K |
| applied Oct 17 | #BD23003086031B001 NEW CONSTRUCTION · LIGHTWEIGHT CONCRETE INSULATED - SHOP DRAWING LIGHTWEIGHT CONCRETE INSULATED - SHOP DRAWING Status: Final | Cellucrete Corp. | $97.4K |
| applied Aug 14 | #BD23003086021B001 NEW CONSTRUCTION · STRUCTURAL SUPPORT FOR EQUIPMENT STRUCTURAL SUPPORT FOR EQUIPMENT Status: Final | A & P Air Conditioning Corporation | $100 |
| applied Jan 27 | #BD23003086057F001 NEW CONSTRUCTION · BACKFLOW PREVENTER|FIRE DEPARTMENT CONNECTION|WATER SUPPLY / FIRELINE BACKFLOW PREVENTER|FIRE DEPARTMENT CONNECTION|WATER SUPPLY / FIRELINE Status: Final | Hernandez Fire Protection Inc. | $40K |
| applied Jul 24 | #BD23003086017B001 NEW CONSTRUCTION · DECK WATERPROOFING DECK WATERPROOFING Status: Final | JJ Caulking & Waterproofing Corp | $843K |
| applied Feb 26 | #BD23003086061B001 NEW CONSTRUCTION · BARRIER CABLE SYSTEMS BARRIER CABLE SYSTEMS Status: Final | Shawmut Design And Construction | $210K |
| applied Feb 19 | #BD23003086059E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $2.5K |
| applied Feb 4 | #BD23003086058B001 NEW CONSTRUCTION · SCREEN WALL SCREEN WALL Status: Final | Shawmut Design And Construction | $903K |
| applied Aug 14 | #BD23003086020B001 NEW CONSTRUCTION · STRUCTURAL SUPPORT FOR EQUIPMENT STRUCTURAL SUPPORT FOR EQUIPMENT Status: Final | A & P Air Conditioning Corporation | $100 |
| applied Sep 10 | #BD23003086028B001 NEW CONSTRUCTION · POST TENSION POST TENSION Status: Final | Shawmut Design And Construction | $1.2M |
| applied Nov 11 | #BD23003086034B001 NEW CONSTRUCTION · RAILINGS - METAL RAILINGS - METAL Status: Final | Shawmut Design And Construction | $88.8K |
| applied Nov 20 | #BD23003086053E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.8K |
| applied Nov 19 | #BD23003086035E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.8K |
| applied Nov 19 | #BD23003086036E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.8K |
| applied Nov 19 | #BD23003086037E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.8K |
| applied Nov 19 | #BD23003086038E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.8K |
| applied Nov 20 | #BD23003086039E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $80 |
| applied Nov 20 | #BD23003086040E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.8K |
| applied Nov 20 | #BD23003086049E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.8K |
| applied Nov 20 | #BD23003086050E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $80 |
| applied Nov 20 | #BD23003086051E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.8K |
| applied Nov 20 | #BD23003086052E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.8K |
| applied Nov 20 | #BD23003086045E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.8K |
| applied Nov 20 | #BD23003086046E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.8K |
| applied Nov 20 | #BD23003086047E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.8K |
| applied Nov 20 | #BD23003086048E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $1.8K |
| applied Nov 20 | #BD23003086041E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $5K |
| applied Nov 20 | #BD23003086042E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $80 |
| applied Nov 20 | #BD23003086043E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $80 |
| applied Nov 20 | #BD23003086044E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Final | Integrated Electrical Services of Dade Inc | $80 |
| applied Oct 29 | #BD23003086033P001 NEW CONSTRUCTION · LAWN SPRINKLER SYSTEM LAWN SPRINKLER SYSTEM Status: Active | Pink And Green LLC | $31K |
| applied Sep 25 | #BD23003086029F001 NEW CONSTRUCTION · NEW FIRE ALARM SYSTEM NEW FIRE ALARM SYSTEM Status: Final | Homesmart Technologies Inc. Dba Skylight Technologies Inc | $30K |
| applied Sep 25 | #BD23003086029E001 NEW CONSTRUCTION · ACCESS CONTROL ACCESS CONTROL Status: Final | Homesmart Technologies Inc. Dba Skylight Technologies Inc | $30K |
| applied Aug 25 | #BD23003086022P001 NEW CONSTRUCTION · TEMPORARY TOILETS: SITE INSTALLATION TEMPORARY TOILETS: SITE INSTALLATION Status: Active | Will Engineering Corp | $150 |
| applied Jul 23 | #BD23003086014F001 NEW CONSTRUCTION · NEW FIRE ALARM SYSTEM NEW FIRE ALARM SYSTEM Status: Active | SR Tech & Services Corp | $399K |
| applied Jul 23 | #BD23003086014E001 NEW CONSTRUCTION · ELECTRICAL FOR FIRE ALARM ELECTRICAL FOR FIRE ALARM Status: Active | SR Tech & Services Corp | $399K |
| applied Jun 18 | #BD23003086008P001 NEW CONSTRUCTION · GAS OR ELECTRIC HEATERS |NEW POOL / SPA OR FOUNTAIN GAS OR ELECTRIC HEATERS |NEW POOL / SPA OR FOUNTAIN Status: Final | Dillon Pools Inc | $25K |
| applied Jun 18 | #BD23003086008E001 NEW CONSTRUCTION · POOL OR SPA (SINGLE UNIT) POOL OR SPA (SINGLE UNIT) Status: Final | Integrated Electrical Services of Dade Inc | $41.2K |
| applied Jun 18 | #BD23003086008B001 NEW CONSTRUCTION · POOL FINISHES / MEP POOL FINISHES / MEP Status: Final | Dillon Pools Inc | $206K |
| applied Jul 7 | #BD23003086012E001 NEW CONSTRUCTION · EMPTY CONDUIT INSTALLATION EMPTY CONDUIT INSTALLATION Status: Final | Integrated Electrical Services of Dade Inc | $1K |
| applied Jun 11 | #BD23003086004MA001 NEW CONSTRUCTION · TRASH CHUTE TRASH CHUTE Status: Final | WHR Holdings LLC Dba Wilkinson Hirise | $27.5K |
| applied Jun 20 | #BD23003086011E001 NEW CONSTRUCTION · TEMPORARY FOR CONSTRUCTION >600 AMPS & 240V TEMPORARY FOR CONSTRUCTION >600 AMPS & 240V Status: Final | Integrated Electrical Services of Dade Inc | $40K |
| applied Jun 19 | #BD23003086009E001 NEW CONSTRUCTION · LOW VOLTAGE SOUND / SPEAKER SYSTEM|LOW VOLTAGE SECURITY CAMERAS LOW VOLTAGE SOUND / SPEAKER SYSTEM|LOW VOLTAGE SECURITY CAMERAS Status: Final | Homesmart Technologies Inc. Dba Skylight Technologies Inc | $20K |
| applied Jun 17 | #BD23003086005E001 NEW CONSTRUCTION · LOW VOLTAGE COMPUTER / TV CABLE / PHONE TERMINAL|LOW VOLTAGE DATA-COMM LOW VOLTAGE COMPUTER / TV CABLE / PHONE TERMINAL|LOW VOLTAGE DATA-COMM Status: Final | Homesmart Technologies Inc. Dba Skylight Technologies Inc | $17.2K |
| applied Jun 5 | #BD23003086002B001 NEW CONSTRUCTION · SHORING / RE-SHORING SHORING / RE-SHORING Status: Final | Shawmut Design And Construction | $1.5M |
| applied Feb 9 | #BD23003086001E001 NEW CONSTRUCTION · A/C CENTRAL|CLOTHES WASHERS|DISH WASHER|DRYERS|EXHAUST / BATHROOM FAN|FIXTURE HEADS|GARBAGE DISPOSAL|LIGHT SOCKET|MOTOR|NEW METER|ROUGH WIRING OUTLETS|RANGE|REFRIGERATORS DOMESTIC|NEW SERVICE|SUB-FEEDS|SWITCHBOARD/CONTROL PANEL|WATER HEATER / BOILER|GENERATOR (COMMERCIAL / MULTIFAMILY)|LIGHT POLES A/C CENTRAL|CLOTHES WASHERS|DISH WASHER|DRYERS|EXHAUST / BATHROOM FAN|FIXTURE HEADS|GARBAGE DISPOSAL|LIGHT SOCKET|MOTOR|NEW METER|ROUGH WIRING OUTLETS|RANGE|REFRIGERATORS DOMESTIC|NEW SERVICE|SUB-FEEDS|SWITCHBOARD/CONTROL PANEL|WATER HEATER / BOILER|GENERATOR (COMMERCIAL / MULTIFAMILY)|LIGHT POLES Status: Active | Integrated Electrical Services of Dade Inc | $4.5M |
| applied Feb 9 | #BD23003086001PG001 NEW CONSTRUCTION · APPLIANCE SET: BAR-B-Q & GRIDDLE |ROUGH OUTLET: BAR-B-Q|APPLIANCE SET: POOL HEATER|ROUGH OUTLET: WATER HEATER / POOL HEATER APPLIANCE SET: BAR-B-Q & GRIDDLE |ROUGH OUTLET: BAR-B-Q|APPLIANCE SET: POOL HEATER|ROUGH OUTLET: WATER HEATER / POOL HEATER Status: Final | Douglas Orr Plumbing Inc | $10K |
| applied Feb 9 | #BD23003086001P001 NEW CONSTRUCTION · ALL TYPES OF AIR CONDITIONER DRAINS|SETTING FIXTURE: MISCELLANEOUS SINK|ROUGHING FIXTURE: MOP SINK|SETTING FIXTURE: MOP SINK|ROUGHING FIXTURE: BATHTUB|SETTING FIXTURE: BATHTUB|ROUGHING FIXTURE: DISHWASHER|SETTING FIXTURE: DISHWASHER|ROUGHING FIXTURE: DISPOSAL|SETTING FIXTURE: DISPOSAL|ROUGHING FIXTURE: DRINKING FOUNTAIN|SETTING FIXTURE: DRINKING FOUNTAIN|ROUGHING FIXTURE: ELECTRIC WATER HEATER|SETTING FIXTURE: ELECTRIC WATER HEATER|ROUGHING FIXTURE: FLOOR DRAIN|SETTING FIXTURE: FLOOR DRAIN|HOSE BIB |SETTING FIXTURE: ICE MAKER|ROUGHING FIXTURE: INDIRECT WASTE|SETTING FIXTURE: INDIRECT WASTE|ROUGHING FIXTURE: KITCHEN SINK|SETTING FIXTURE: KITCHEN SINK|ROUGHING FIXTURE: LAUNDRY TRAY / WASHER|SETTING FIXTURE: LAUNDRY TRAY / WASHER|ROUGHING FIXTURE: LAVATORY|SETTING FIXTURE: LAVATORY|MISCELLANEOUS SIPHON-BREAKERS |ROOF DRAIN / ROUGH & INLET |ROUGHING FIXTURE: SHOWER|SETTING FIXTURE: SHOWER|STORM SEWER |SUMP PUMP|ROUGHING FIXTURE: TOILET / WATER CLOSET|SETTING FIXTURE: TOILET / WATER CLOSET|ROUGHING FIXTURE: URINAL|SETTING FIXTURE: URINAL|WATER SERVICE: WATER CONNECTION FROM METER|SUB-METER|COMMERCIAL BUILDING CONNECTION OUTSIDE |DOMESTIC PUMP|GREASE TRAP|BACKFLOW > 2"" ALL TYPES OF AIR CONDITIONER DRAINS|SETTING FIXTURE: MISCELLANEOUS SINK|ROUGHING FIXTURE: MOP SINK|SETTING FIXTURE: MOP SINK|ROUGHING FIXTURE: BATHTUB|SETTING FIXTURE: BATHTUB|ROUGHING FIXTURE: DISHWASHER|SETTING FIXTURE: DISHWASHER|ROUGHING FIXTURE: DISPOSAL|SETTING FIXTURE: DISPOSAL|ROUGHING… Status: Active | Douglas Orr Plumbing Inc | $6.1M |
| applied Feb 9 | #BD23003086001MA001 NEW CONSTRUCTION · AC CENTRAL / HEATING SYSTEM|SHEET METAL WORK|EXHAUST VENTILATION|FIBERGLASS DUCTWORK|DUCTLESS MINI-SPLIT SYSTEM|STATIONARY GENERATOR (MECH) AC CENTRAL / HEATING SYSTEM|SHEET METAL WORK|EXHAUST VENTILATION|FIBERGLASS DUCTWORK|DUCTLESS MINI-SPLIT SYSTEM|STATIONARY GENERATOR (MECH) Status: Active | A & P Air Conditioning Corporation | $4.5M |
| applied Feb 9 | #BD23003086001B001 NEW CONSTRUCTION · MULTI-FAMILY (RENTAL)|PARKING GARAGE-MULTIPLE FLOORS MULTI-FAMILY (RENTAL)|PARKING GARAGE-MULTIPLE FLOORS Status: Active | Shawmut Design And Construction | $68.5M |