Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Miami, FL
Multifamily General Building, Fire Protection, Hvac/Mechanical, Plumbing work permitted August 26, 2026, with 5 permits through October 22, 2026, declaring $385,280 of work. Contractor on record: Plumbing By JD LLC.
Get new commercial permits in Miami, free weekly email
Miami permit records name Plumbing By JD LLC and Phase3 Construction LLC as the contractors on this project.
The contractor on 3 permits issued in the last 30 days is included with Pro.
See the contractor5 permits issued Aug 26 – Oct 22, newest first.
In Miami, biggest first.
| Issued | Permit | Contractor | Value |
|---|
| applied May 29 | #BD26012761001MA001 REMODELING/REPAIRS · A/C DRAIN|AC CENTRAL / HEATING SYSTEM|SHEET METAL WORK|EXHAUST VENTILATION|FIBERGLASS DUCTWORK A/C DRAIN|AC CENTRAL / HEATING SYSTEM|SHEET METAL WORK|EXHAUST VENTILATION|FIBERGLASS DUCTWORK Status: Active | Contractor with Pro | $35K |
| applied Oct 13 | #BD26012761003F001 REMODELING/REPAIRS · EXISTING FIRE SPRINKLER SYSTEM EXISTING FIRE SPRINKLER SYSTEM Status: Active | Contractor with Pro | $20.3K |
| applied May 29 | #BD26012761001E001 REMODELING/REPAIRS · A/C CENTRAL|EXHAUST / BATHROOM FAN|LIGHT SOCKET|ROUGH WIRING OUTLETS|SUB-FEEDS|SWITCHBOARD/CONTROL PANEL A/C CENTRAL|EXHAUST / BATHROOM FAN|LIGHT SOCKET|ROUGH WIRING OUTLETS|SUB-FEEDS|SWITCHBOARD/CONTROL PANEL Status: Active | Contractor with Pro | $50K |
| applied May 29 | #BD26012761001P001 REMODELING/REPAIRS · ALL TYPES OF AIR CONDITIONER DRAINS|ROUGHING FIXTURE: BATHTUB|SETTING FIXTURE: BATHTUB|ROUGHING FIXTURE: DISHWASHER|SETTING FIXTURE: DISHWASHER|ROUGHING FIXTURE: DISPOSAL|SETTING FIXTURE: DISPOSAL|WATER SERVICE: EXTENSION TO CONNECTION|CAPPED OFF: FIXTURE|ROUGHING FIXTURE: ICE MAKER|SETTING FIXTURE: ICE MAKER|SANITARY SEWER: INSIDE CONNECTION|ROUGHING FIXTURE: KITCHEN SINK|SETTING FIXTURE: KITCHEN SINK|ROUGHING FIXTURE: LAVATORY|SETTING FIXTURE: LAVATORY|ROUGHING FIXTURE: SHOWER|SETTING FIXTURE: SHOWER|ROUGHING FIXTURE: TOILET / WATER CLOSET|SETTING FIXTURE: TOILET / WATER CLOSET ALL TYPES OF AIR CONDITIONER DRAINS|ROUGHING FIXTURE: BATHTUB|SETTING FIXTURE: BATHTUB|ROUGHING FIXTURE: DISHWASHER|SETTING FIXTURE: DISHWASHER|ROUGHING FIXTURE: DISPOSAL|SETTING FIXTURE: DISPOSAL|WATER SERVICE: EXTENSION TO CONNECTION|CAPPED OFF: FIXTURE|ROUGHING FIXTURE: ICE MAKER|SETTING… Status: Active | Plumbing By JD LLC | $30K |
| applied May 29 | #BD26012761001B001 REMODELING/REPAIRS · MULTI-FAMILY (CONDO) MULTI-FAMILY (CONDO) Status: Active | Phase3 Construction LLC | $250K |