Commercial General Building work permitted December 9, 2024, with 21 permits through October 23, 2026, declaring $60,213,002 of work.
Get new commercial permits near 90034 or Los Angeles, free weekly email
****ePlan****New 5-story office building (type IB) w./ cafeteria (serving occupants only) at 1st floor over 3-level basement parking (type IB) w./ NFPA13 sprinkler system throughout per case no. [CPC-2021-9506-CPIO-SP-SPR-WDI]
Los Angeles’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
21 permits issued Dec 9 – Oct 23, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 28 | #22010-10024-05268 Bldg-Alter/Repair · Building ePlan. Supplemental permit to 22010-10000-05268 for changes to the supplemental permit # 22010-10013-05268 plans for Duct/Pipe Roof Supports Status: Issued | Not published | $2.5K |
Commercial and multifamily, biggest first.
#22010-10006-05268 Bldg-Alter/Repair · Building ePlan Supplemental permit to # 22010-10000-05268 for interior layout changes Status: Issued |
| Not published |
| $180K |
| applied Sep 3 | #22010-10021-05268 Bldg-Alter/Repair · Building ePlan: Defferred submittal- Supplemental to 22010-10000-05268 for all mechanical phase 2 indoor equipment anchorage details and calculations. Status: Issued | Not published | $2.5K |
| applied Aug 25 | #22010-10019-05268 Bldg-Alter/Repair · Building ePlan. Deferred submittal - Supplemental permit to # 22010-10000-05268 for changes to the approved Level 1 through 3 Duct Seismic bracing (under permit # 22010-10012-05268). Changes to the level 1 duct: - Transverse bracing added to LADWP ductwork in L1 zone D3. - Updated seismic locations on… Status: Issued | Not published | $2.5K |
| applied Aug 25 | #22010-10020-05268 Bldg-Alter/Repair · Building ePlan. Supplemental permit to # 22010-10000-05268 for Phase 2 Level 3 thru 5 Mechanical HVAC Pipe Seismic deferred submittal Status: Issued | Not published | $2.5K |
| applied Aug 24 | #22010-10018-05268 Bldg-Alter/Repair · Building Mechanical roof equipment anchorage deferred submittal supplemental to permit #22010-10002-05268.This deferred submittal compiles all mechanical phase 2 roof equipment anchorage details and calculations. Status: Issued | Not published | $501 |
| applied Jul 22 | #22010-10014-05268 Bldg-Alter/Repair · Building ePlan. Deferred submittal supplemental to permit # 22010-10002-05268 for changes to seismic bracing of duct risers. Status: Issued | Not published | $2.5K |
| applied Aug 4 | #22010-10016-05268 Bldg-Alter/Repair · Building ePlan. Supplemental permit to # 22010-10000-05268 for Phase 2 Generator Exhaust Pipe Seismic Deferred Submittal for changes to design under supplemental permit # 22010-10002-05268 Status: Issued | Not published | $2.5K |
| applied Aug 4 | #22010-10015-05268 Bldg-Alter/Repair · Building Supplemental permit to permit no. 22010-10013-05268 to capture changes: A portion of the roof duct will be raised in elevation to allow another trade to perform waterproofing scope on the roof deck. See detail #2/SBM 3.1 for updated duct elevations. The updated detail and corresponding shop… Status: Issued | Not published | $501 |
| applied Apr 27 | #22010-10013-05268 Bldg-Alter/Repair · Building Deferred approval for Roof Duct and Pipe Seismic Supports supplemental to permit # 22010-10000-05268 Status: Issued | Not published | $501 |
| applied Nov 5 | #22010-10005-05268 Bldg-Alter/Repair · Building ePlan. Supplemental permit to #22010-10000-05268 for new window wall, doors, glass handrail and storefront systems (deferred submittal) Status: Issued | Not published | $10K |
| applied Mar 9 | #22010-10011-05268 Bldg-Alter/Repair · Building ePlan. Supplemental permit to # 22010-10002-05268 for seismic bracing of ducts and pipe risers deferred submittal Status: Issued | Not published | $501 |
| applied Mar 9 | #22010-10012-05268 Bldg-Alter/Repair · Building ePlan. Supplemental permit to # 22010-10002-05268 for phase 2 Levels 1 through 3 ducts seismic bracing deferred submittal Status: Issued | Not published | $2.5K |
| applied Dec 29 | #22010-10007-05268 Bldg-Alter/Repair · Building eplan Deffered submittal- Supplemental to 22010-10000-05268 for Stair 1, 2, 3 Status: Issued | Not published | — |
| applied Feb 18 | #22010-10010-05268 Bldg-Alter/Repair · Building ePlan: Supplemental permit to # 22010-10000-05268 for Stairs 4, 5, 6 (deferred submittal) Status: Issued | Not published | $501 |
| applied Feb 11 | #22010-10009-05268 Bldg-Alter/Repair · Building Deferred Submittal 22010-10000-05268 for Non-Structural Metal Stud Framing Shop Drawings and Calculations Status: Issued | Not published | $501 |
| applied Feb 18 | #22010-10008-05268 Bldg-Alter/Repair · Building Supplemental permit to # 22010-10000-05268 for Exterior Framing & Drywall deferred submittal Status: Issued | Not published | $501 |
| applied Aug 4 | #22010-10004-05268 Bldg-Alter/Repair · Building (ePlan) SUPPLEMENTAL TO PERMIT #22010-10000-05268, Deferred submittal for exterior facade metal panel cladding. Status: Issued | Not published | $501 |
| applied May 29 | #22010-10003-05268 Bldg-Alter/Repair · Building ePlan: Supplemental permit to # 22010-10000-05268 for fire sprinkler system seismic bracket attachment (deferred submittal) Status: Issued | Not published | $10K |
| applied Apr 28 | #22010-10002-05268 Bldg-Alter/Repair · Building ePlan. Supplemental permit to # 22010-10000-05268 to include minor revisions to add vestibule to the battery storage room Status: Issued | Not published | $20K |
| applied Dec 20 | #22010-10000-05268 Bldg-New · Building ****ePlan****New 5-story office building (type IB) w./ cafeteria (serving occupants only) at 1st floor over 3-level basement parking (type IB) w./ NFPA13 sprinkler system throughout per case no. [CPC-2021-9506-CPIO-SP-SPR-WDI] Status: Issued | Not published | $60M |