Multifamily General Building work permitted June 26, 2026, declaring $50,000 of work.
Supplemental to 24016-10000-09708: 1. INCLINE LIFT SUBSTITUTION: DUE TO SPACE LIMITATIONS, AN INCLINE LIFT HAS BEEN SUBSTITUTED FOR A PLATFORM LIFT. THE SITE SIMPLY DOESN'T HAVE ENOUGH WIDTH AT THE FRONT STAIRCASE TO FACILITATE A PLATFORM LIFT. 2. FRONT STEP RECONSTRUCTION: THE EXISTING EXTERIOR ELEVATION OF THE STAIRWAY LANDING WAS TOO LOW IN COMPARISON TO THE INTERIOR FLOOR ELEVATION. THIS REQUIRED THE FRONT ENTRY STEPS TO BE COMPLETELY RECONSTRUCTED. HPOZ APPROVED OF THIS ALREADY.
Los Angeles’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
1 permit issued Jun 26 – Jun 26, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Apr 17 | #24016-10001-09708 Bldg-Alter/Repair · Building Supplemental to 24016-10000-09708: 1. INCLINE LIFT SUBSTITUTION: DUE TO SPACE LIMITATIONS, AN INCLINE LIFT HAS BEEN SUBSTITUTED FOR A PLATFORM LIFT. THE SITE SIMPLY DOESN'T HAVE ENOUGH WIDTH AT THE FRONT STAIRCASE TO FACILITATE A PLATFORM LIFT. 2. FRONT STEP RECONSTRUCTION: THE EXISTING EXTERIOR… |
Commercial and multifamily, biggest first.
Status: Permit Finaled
| Not published |
| $50K |