Commercial General Building work permitted April 18, 2025, with 4 permits through July 9, 2026, declaring $8,067,051 of work.
Get new commercial permits near 90049 or Los Angeles, free weekly email
REMODEL TO (E) 2 STORY OFFICE BUILDING WITH 2 LEVELS OF UNDERGROUND PARKING INCLUDES REFINISHING AND INSULATING OR CEMENT PLASTER CLADDING, REPLACEMENT OF PUNCHED AND STOREFRONT GLAZING, REPLACEMENT OF SELECTED EXTERIOR DOORS, ROOFING REPLACEMENT, REPLACEMENT OF RAISED TERRACE DECK PAVING AND WATERPROOF SYSTEMS, REPLACEMENT OF EXTERIOR LIGHT FIXTURES, REPLACEMENT OF EXISTING SYLIGHTS AT UPPER ROOF LEVEL AND LEVEL 2. (INTERIOR TENANT IMPROVEMENT UNDER SEPARATE PERMIT)
Los Angeles’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
4 permits issued Apr 18 – Jul 9, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 12 | #26030-30000-04207 Grading · Building Grading for new pad/vault and trenching for new electrical conduits. ***ELECTRICAL/MECHANICAL EQUIPMENT UNDER SEPARATE PERMIT*** Status: Issued | Not published |
Commercial and multifamily, biggest first.
| $51 |
| applied Feb 24 | #26016-20000-05013 Bldg-Alter/Repair · Building TENANT IMPROVEMENT TO (E) OFFICE SPACE ON 2ND FLOOR. Status: Issued | Not published | $3M |
| applied May 29 | #25016-20000-17459 Bldg-Alter/Repair · Building REMODEL TO (E) 2 STORY OFFICE BUILDING WITH 2 LEVELS OF UNDERGROUND PARKING INCLUDES REFINISHING AND INSULATING OR CEMENT PLASTER CLADDING, REPLACEMENT OF PUNCHED AND STOREFRONT GLAZING, REPLACEMENT OF SELECTED EXTERIOR DOORS, ROOFING REPLACEMENT, REPLACEMENT OF RAISED TERRACE DECK PAVING AND… Status: Issued | Not published | $5M |
| applied Dec 6 | #24016-30000-38662 Bldg-Alter/Repair · Building (N) EQUIPMENT ANCHORAGE TO (E) SLAB ON LEVEL P2, TWO NEW MECHANICAL PLATFORMS SUSPENDED FROM CONC. FLOOR, NEW EQUIPMENT ON MECHANICAL MEZZANINE COMPOSITE FLOOR, FOUR (N) CONC. EQUIPMENT FDN SLAB ON COMPOSITE FLOOR, CUT COMPOSITE FLOOR AND ADD NEW STEEL BEAMS FOR EQUIP. SUPPORT SIX PLACES Status: Issued | Not published | $67K |