Commercial General Building work permitted November 13, 2024, with 12 permits through October 6, 2026, declaring $9,882,084 of work.
Get new commercial permits near 90744 or Los Angeles, free weekly email
Eplan. Structural alteration to existing refinery for removal of existing tanks and pumps on second floor to replace with new tanks and pumps on new concrete forms
Los Angeles’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
12 permits issued Nov 13 – Oct 6, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Mar 31 | #26016-10000-03936 Bldg-Alter/Repair · Building STRENGTHENING OF (E) COLUMN AND RECONSTRUCTION OF THE FOUR SLAB PANELS SURROUNDING THE COLUMN AT LEVEL 3. Status: Issued | Not published | $2M |
| applied Jun 1 |
Commercial and multifamily, biggest first.
#26016-10000-14380
Bldg-Alter/Repair · Building
Repair and strengthening of 3rd floor concrete slab where deteriorating.
Status: Issued
| Not published |
| $1.7M |
| applied Apr 15 | #26020-10000-00845 Nonbldg-New · Building Temporary shoring for a new underground lift constructions. Status: Permit Finaled | Not published | $10K |
| applied Apr 15 | #26030-10000-02959 Grading · Building Grading and excavation for a new underground lift constructions. Status: Issued | Not published | $1.6K |
| applied Apr 15 | #26020-10000-00737 Nonbldg-New · Building new underground lift constructions. Status: Issued | Not published | $1.9M |
| applied Feb 24 | #25030-10001-08809 Grading · Building eplan Supplemental permit 25030-10000-08809 to incorporate tank foundation ground stabilization detail, no change to plot plan Status: Issued | Not published | $51 |
| applied Jan 28 | #26020-10000-00174 Nonbldg-New · Building Shoring permit for excavation work under grading permit #25030-10000-08809 Status: Issued | Not published | $1M |
| applied Dec 29 | #25030-10000-08809 Grading · Building *EPLAN* Excavation for new stormwater holding tank foundation Status: Issued | Not published | $403 |
| applied Apr 21 | #25016-10000-13611 Bldg-Alter/Repair · Building ePlan: new strucutral support for new pipe attached to the (E) building. Status: Issued | Not published | $50K |
| applied Apr 21 | #25020-10000-00709 Nonbldg-New · Building ePlan: Strcutral support for non-building elemetns withing the site, lift station, tank foundation & pipe supports.1 of 2 Status: Issued | Not published | $100K |
| applied Nov 5 | #24016-10000-35416 Bldg-Alter/Repair · Building INTERIOR COLUMN #160 STRUCTURAL REPAIR AND REPLACEMENT FOR EXISTING REFINERY. Status: Issued | Not published | $120K |
| applied Mar 28 | #24016-10000-10316 Bldg-Alter/Repair · Building Eplan. Structural alteration to existing refinery for removal of existing tanks and pumps on second floor to replace with new tanks and pumps on new concrete forms Status: Issued | Not published | $3M |