Commercial General Building work permitted May 2, 2025, declaring $34,560 of work. Contractor on record: Opal Energy Group LLC.
SPR 2019 CBRC: NEW ROOFTOP SOLAR INSTALLATION OF 48 PANELS AT 23.04 KW DC AND RECONNECTION OF ANY EXISTING ELECTRICAL EQUIPMENT DISTURBED DURING INSTALLATION. SOLAR MODULES WILL BE MOUNTED ON A RACKING SYSTEM THAT WILL BE INSTALLED ON THE ROOF. THE PROPOSED PV SYSTEM INCLUDES THE INSTALLATION OF THE FOLLOWING EQUIPMENT.- (48) Q.PEAK DUO XL-G10.3 / BFG 480 (QCELLS)- (2) SOLAREDGE SE7600H-US [240V] (15.2 KW AC)- ALL PV RACKING AS WELL AS ALL REQUIRED B,O,S, MATERIALS
Chicago permit records name Opal Energy Group LLC as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
1 permit issued May 2 – May 2, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Apr 14 | #101067925 PERMIT - RENOVATION/ALTERATION SPR 2019 CBRC: NEW ROOFTOP SOLAR INSTALLATION OF 48 PANELS AT 23.04 KW DC AND RECONNECTION OF ANY EXISTING ELECTRICAL EQUIPMENT DISTURBED DURING INSTALLATION. SOLAR MODULES WILL BE MOUNTED ON A RACKING SYSTEM THAT WILL BE INSTALLED ON THE ROOF. THE PROPOSED PV SYSTEM INCLUDES THE INSTALLATION OF… |
In Chicago, biggest first.
Status: Complete
| Opal Energy Group LLC |
| $34.6K |