Get Procommercial project · Chicago, IL
Commercial General Building, Electrical, Elevator, Fire Protection work permitted October 29, 2024, with 32 permits through October 12, 2026, declaring $1,930,000 of work. Contractor on record: Robert Lesnicki.
MODERNIZATION OF THREE(3) 3000LB CAPACITY, 16-FLOOR, 500FPM, PASSENGER ELEVATORS(#1-#3); AND ONE(1) 4000LB CAPACITY, 16-FLOOR, SERVICE ELEVATOR(#4), PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV006774)
Chicago permit records name Robert Lesnicki, Forza Construction LLC and Siemens Industry Inc as the contractors on this project, among 6 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 2 permits issued in the last 30 days is included with Pro.
See the contractorIn Chicago, biggest first.
32 permits issued Oct 29 – Oct 12, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 17 | #B200473479 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 6/7/2026. END DATE: 7/7/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Contractor with Pro | — |
| applied Oct 2 | #B200514319 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 10/7/2026. END DATE: 11/6/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Contractor with Pro | — |
| applied Sep 7 | #B200510079 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 9/7/2026. END DATE: 10/7/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Robert Lesnicki | — |
| applied Aug 3 | #B200481195 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 8/6/2026. END DATE: 9/5/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Robert Lesnicki | — |
| applied Jul 2 | #B200477034 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 7/7/2026. END DATE: 8/6/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Robert Lesnicki | — |
| applied Jun 5 | #B200473522 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 6/5/2026. END DATE: 7/5/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Robert Lesnicki | — |
| applied May 5 | #B200469064 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 5/7/2026. END DATE: 6/6/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Robert Lesnicki | — |
| applied Apr 9 | #B200465704 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 4/9/2026. END DATE: 5/9/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Robert Lesnicki | — |
| applied Mar 3 | #B200460805 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 3/7/2026. END DATE: 4/6/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Robert Lesnicki | — |
| applied Feb 4 | #B200458084 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 2/7/2026. END DATE: 3/9/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Robert Lesnicki | — |
| applied Jan 5 | #B200455252 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 1/7/2026. END DATE: 2/6/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Robert Lesnicki | — |
| applied Dec 2 | #B200452745 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 12/7/2025. END DATE: 1/6/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Robert Lesnicki | — |
| applied Nov 3 | #B200449453 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 11/7/2025. END DATE: 12/7/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Robert Lesnicki | — |
| applied Sep 29 | #B200444568 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 10/7/2025. END DATE: 11/6/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Robert Lesnicki | — |
| applied Aug 27 | #B200439963 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 9/7/2025. END DATE: 10/7/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Robert Lesnicki | — |
| applied Aug 15 | #B200437203 PERMIT – EXPRESS PERMIT PROGRAM · Fire Alarm System FIRE ALARM: NEW SYSTEM. ASSOCIATED BUILDING PERMIT:101069610. AFFECTS: 0 DWELLING UNITS; 0 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: YES. VOICE COMMUNICATION: YES. SPECIAL LOCKING: NO. MONITORING TYPE: SUPERVISING STATION . SPECIFIC LOCATION: FLOORS BASEMENT, 1ST, 1ST MEZZ, 2-20. Status: Suspended | Siemens Industry Inc | — |
| applied Aug 1 | #B200436372 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 8/7/2025. END DATE: 9/6/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Robert Lesnicki | — |
| applied Jul 30 | #101072208 PERMIT - RENOVATION/ALTERATION INSTALL SECURITY ACCESS TURNSTILES AND CONSTRUCT 2HR RATED CLOSET FOR FIRE ALARM PANELS AT GROUND FLOOR OF FULLY SPRINKLERED HI-RISE BUILDING, TYPE 1A CONSTRUCTION, BUSINESS OCCUPANCY, 100 SF. NO CHANGE IN USE, NO STRUCTURAL WORK OR TECHNOLOGY CENTERS. SELF-CERTIFICATION PERMIT PROCESS. Status: Active | Forza Construction LLC | $100K |
| applied May 23 | #101069610 PERMIT - RENOVATION/ALTERATION SPR 2019 CBRC: CHANGE IN USE FROM MIXED USE (B & A-3) TO B ONLY AND CLASSIFICATION OF FOUR INTERCONNECTED PAVILIONS AS A SINGLE BUILDING WITH NO BUILDING SEPARATIONS. BUILDING COMPLEX IS TYPE 1A CONSTRUCTION AND FULLY SPRINKLERED, AND INCLUDES INSTALLATION OF NEW HIGH RISE FIRE ALARM SYSTEM… Status: Active | Forza Construction LLC | $200K |
| applied Jul 1 | #B200432235 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 7/7/2025. END DATE: 8/6/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Robert Lesnicki | — |
| applied Jun 11 | #101070430 PERMIT - ELEVATOR EQUIPMENT MODERNIZATION OF THREE(3) 3000LB CAPACITY, 16-FLOOR, 500FPM, PASSENGER ELEVATORS(#1-#3); AND ONE(1) 4000LB CAPACITY, 16-FLOOR, SERVICE ELEVATOR(#4), PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV006774) | Smart Elevator Company | $1.2M |
| applied Jun 9 | #B200429249 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 6 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: MECHANICAL ROOM. Status: Suspended | Terrance Electric & Technology | $430K |
| applied May 27 | #B200427261 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 6/7/2025. END DATE: 7/7/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Robert Lesnicki | — |
| applied Apr 30 | #B200423745 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 5/7/2025. END DATE: 6/6/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Robert Lesnicki | — |
| applied Mar 27 | #B200418749 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 4/7/2025. END DATE: 5/7/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Robert Lesnicki | — |
| applied Feb 19 | #B200414416 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 3/7/2025. END DATE: 4/6/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Robert Lesnicki | — |
| applied Jan 24 | #B200411983 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 2/7/2025. END DATE: 3/9/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Robert Lesnicki | — |
| applied Dec 17 | #B200409025 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 1/7/2025. END DATE: 2/6/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Robert Lesnicki | — |
| applied Nov 18 | #B200405748 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 12/7/2024. END DATE: 1/6/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Complete | Robert Lesnicki | — |
| applied Nov 11 | #B200405322 PERMIT – EXPRESS PERMIT PROGRAM · Administrative Change FOR PERMIT 101059333: REPLACEMENT OTHER CONTRACTOR. NEW CONTRACTOR(S) LISTED UNDER "OTHER APPLICANTS AND CONTRACTORS" ON PERMIT CERTIFICATE. Status: Complete | Any Temperature Heating & A.C. | — |
| applied Oct 30 | #B200403991 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 11/7/2024. END DATE: 12/7/2024. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Complete | Robert Lesnicki | — |
| applied Oct 7 | #B200400609 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 10/7/2024. END DATE: 11/6/2024. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Complete | Robert Lesnicki | — |