Get ProEvery project in every city · from $79/mo
Get Procommercial project · Chicago, IL
Commercial General Building, Electrical work permitted November 1, 2024, with 54 permits through October 28, 2026, declaring $22,500 of work. Contractor on record: Horizon Contractors, Inc..
LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 1. SPECIFIC LOCATION: EXTERIOR WALKWAY OF SIDEWALK.
Chicago permit records name Horizon Contractors, Inc., Current Communications Corp. and Gim Electric Co., Inc. as the contractors on this project, among 9 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 2 permits issued in the last 30 days is included with Pro.
See the contractor54 permits issued Nov 1 – Oct 28, newest first.
In Chicago, biggest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 28 | #B200517686 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 11/1/2026. END DATE: 12/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Contractor with Pro | — |
| applied Oct 1 | #B200514039 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 10/1/2026. END DATE: 10/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Contractor with Pro | — |
| applied Sep 28 | #B200513496 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 10/1/2026. END DATE: 10/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Current Communications Corp. | — |
| applied Sep 1 | #B200509863 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 9/1/2026. END DATE: 10/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Horizon Contractors, Inc. | — |
| applied Aug 26 | #B200508997 PERMIT – EXPRESS PERMIT PROGRAM · Small Temporary Structure TEMPORARY STRUCTURE: NEW INSTALLATION. STAGE/PLATFORM - ASSEMBLY - 480 SQ. FT. ELECTRICAL WORK = NO. NON-SEWER TOILETS: 15. INSTALL DATE: 8/29/2026; REMOVAL DATE: 8/30/2026. Status: Active | Technotrix Inc | — |
| applied Aug 19 | #B200508018 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 9/1/2026. END DATE: 10/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Current Communications Corp. | — |
| applied Aug 18 | #101087382 PERMIT - NEW CONSTRUCTION PERMIT EXPIRES ON 10/19/2026 ERECTION STARTS: 8/25/2026, ERECTION ENDS: 9/8/2026. SELF CERT. CBC 2019. REINSTATEMENT OF 2025 PERMIT 101073124 FOR THE SAME 20FT X 40FT TENT FOR THE 2026 CHICAGO HOUSE AND JAZZ FEST AT MILLENNIUM PARK SOUTH PROMENADE ON AUG 27-30, 2026. SET-UP IS AUG 25 AND TAKEDOWN… Status: Active | Valda Walton Big Tent Events, Inc. | $2K |
| applied Jul 28 | #B200480276 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 8/1/2026. END DATE: 8/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Horizon Contractors, Inc. | — |
| applied Jul 22 | #B200479574 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 8/1/2026. END DATE: 8/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Current Communications Corp. | — |
| applied Jun 29 | #B200476713 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 7/1/2026. END DATE: 7/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Horizon Contractors, Inc. | — |
| applied Jun 23 | #B200475820 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 7/1/2026. END DATE: 7/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Current Communications Corp. | — |
| applied May 29 | #B200472436 PERMIT – EXPRESS PERMIT PROGRAM · Small Temporary Structure TEMPORARY STRUCTURE: NEW INSTALLATION. STAGE/PLATFORM - ASSEMBLY - 480 SQ. FT. ELECTRICAL WORK = NO. NON-SEWER TOILETS: 4. INSTALL DATE: 6/4/2026; REMOVAL DATE: 6/7/2026. Status: Active | Technotrix Inc | — |
| applied Jun 1 | #B200472609 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 6/1/2026. END DATE: 7/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Horizon Contractors, Inc. | — |
| applied May 12 | #B200470165 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 1. SPECIFIC LOCATION: EXTERIOR WALKWAY OF SIDEWALK. Status: Active | SRC Electric LLC | $10K |
| applied May 22 | #B200471793 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 6/1/2026. END DATE: 7/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Current Communications Corp. | — |
| applied May 12 | #101083415 PERMIT - NEW CONSTRUCTION PERMIT EXPIRES ON 07/13/2026 ERECTION STARTS: 6/4/2026, ERECTION ENDS: 6/8/2026. SELF CERT - CBC 2019. REINSTATEMENT OF 2024 PERMIT 101051670 FOR THE SAME 32X24 MOBILE STAGE FOR THE 2026 CHICAGO BLUESFEST AT THE MILLENNIUM PARK SOUTH PROMENADE ON JUNE 5-6 2026. SET-UP IS JUNE 4 AND TAKEDOWN IS… Status: Active | Technotrix Inc | $3K |
| applied Apr 30 | #B200468614 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 5/1/2026. END DATE: 5/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Horizon Contractors, Inc. | — |
| applied Mar 29 | #B200464085 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 4/1/2026. END DATE: 5/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Horizon Contractors, Inc. | — |
| applied Mar 24 | #B200463396 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 4/1/2026. END DATE: 5/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Current Communications Corp. | — |
| applied Feb 27 | #B200460601 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 3/1/2026. END DATE: 3/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Current Communications Corp. | — |
| applied Feb 25 | #B200460272 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 3/1/2026. END DATE: 3/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Horizon Contractors, Inc. | — |
| applied Jan 27 | #B200457300 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 2/1/2026. END DATE: 3/3/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Horizon Contractors, Inc. | — |
| applied Jan 22 | #B200456992 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 2/1/2026. END DATE: 3/3/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Current Communications Corp. | — |
| applied Jan 5 | #B200455265 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 1/5/2026. END DATE: 2/4/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Current Communications Corp. | — |
| applied Dec 29 | #B200454972 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. ALTER EXISTING OTHER. SPECIFIC LOCATION: GARAGES. Status: Active | Maron Electric Company | $5K |
| applied Dec 24 | #B200454829 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 1/1/2026. END DATE: 1/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Horizon Contractors, Inc. | — |
| applied Nov 25 | #B200452324 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 12/1/2025. END DATE: 12/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Horizon Contractors, Inc. | — |
| applied Nov 24 | #B200452088 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 12/1/2025. END DATE: 12/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Current Communications Corp. | — |
| applied Oct 31 | #B200449294 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 11/1/2025. END DATE: 12/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Current Communications Corp. | — |
| applied Oct 23 | #B200448058 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 11/1/2025. END DATE: 12/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Horizon Contractors, Inc. | — |
| applied Sep 30 | #B200444878 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 10/1/2025. END DATE: 10/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Current Communications Corp. | — |
| applied Sep 29 | #B200444585 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 10/1/2025. END DATE: 10/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Horizon Contractors, Inc. | — |
| applied Sep 2 | #B200440683 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 9/2/2025. END DATE: 10/2/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Current Communications Corp. | — |
| applied Aug 27 | #B200440008 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 9/1/2025. END DATE: 10/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Horizon Contractors, Inc. | — |
| applied Aug 19 | #B200438817 PERMIT – EXPRESS PERMIT PROGRAM · Small Temporary Structure TEMPORARY STRUCTURE: NEW INSTALLATION. STAGE/PLATFORM - ASSEMBLY - 480 SQ. FT. ELECTRICAL WORK = NO. NON-SEWER TOILETS: 4. INSTALL DATE: 8/23/2025; REMOVAL DATE: 8/24/2025. Status: Suspended | Technotrix Inc | — |
| applied Aug 18 | #101073124 PERMIT - NEW CONSTRUCTION PERMIT EXPIRES ON 10/19/2025 ERECTION STARTS: 8/26/2025, ERECTION ENDS: 8/31/2025. SELF CERT. CBC 2019. ONE 20FT X 40FT TENT FOR THE 2025 JAZZ FEST AT MILLENNIUM PARK SOUTH PROMENADE ON AUG 28, 2025. SET-UP IS AUG 26 AND TAKEDOWN IS AUG 31, 2025. DCASE WITH BIG TENT EVENTS, INC. Status: Suspended | Big Tent Events | $2K |
| applied Jul 29 | #B200435956 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 8/1/2025. END DATE: 8/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Current Communications Corp. | — |
| applied Jul 29 | #B200435983 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 8/1/2025. END DATE: 8/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Horizon Contractors, Inc. | — |
| applied Jul 22 | #101072084 PERMIT - NEW CONSTRUCTION PERMIT EXPIRES ON 09/25/2025 ERECTION STARTS: 7/24/2025, ERECTION ENDS: 7/27/2025. SELF CERT. CBC 2019. JORDAN MILLENIUM PARK DISPLAY CONTAINERS ON JULY 24-27 2025. SET-UP JULY 24 AND TAKEDOWN ON JULY 27 2025. 4-20X8 STEEL CONTAINERS. NIKE-JORDAN AND CHICAGO SPECIAL EVENTS MANAGEMENT. Status: Suspended | Chicago Special Events Management | $5K |
| applied Jun 23 | #B200431175 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 7/1/2025. END DATE: 7/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Horizon Contractors, Inc. | — |
| applied Jun 16 | #B200430052 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 7/1/2025. END DATE: 7/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Current Communications Corp. | — |
| applied Jun 9 | #B200429237 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL OTHER. SPECIFIC LOCATION: GARAGE. Status: Complete | Horizon Contractors, Inc. | $1K |
| applied May 30 | #B200428042 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 6/1/2025. END DATE: 7/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Current Communications Corp. | — |
| applied May 23 | #B200427152 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT.OCCUPANCY: RESIDENTIAL.START DATE: 6/1/2025.END DATE: 7/1/2025.ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Horizon Contractors, Inc. | — |
| applied May 17 | #101069361 PERMIT - NEW CONSTRUCTION PERMIT EXPIRES ON 07/19/2025 ERECTION STARTS: 6/5/2025, ERECTION ENDS: 6/8/2025. SELF CERT - CBC 2019. REINSTATEMENT OF 2024 PERMIT 101051670 FOR THE SAME 32X24 MOBILE STAGE FOR THE 2025 CHICAGO BLUESFEST AT THE MILLENNIUM PARK SOUTH PROMENADE ON JUNE 6-8 2025 DCASE WITH TECHNOTRIX INC. Status: Suspended | Technotrix Inc | $3K |
| applied Apr 29 | #B200423586 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 5/1/2025. END DATE: 5/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Horizon Contractors, Inc. | — |
| applied Apr 23 | #B200422559 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. ADD 0 CIRCUITS TO EXISTING 200 AMP SERVICE DISCONNECTING MEANS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 22. SPECIFIC LOCATION: 1ST FLOOR. Status: Complete | SRC Electric LLC | $5K |
| applied Mar 26 | #B200418554 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 4/1/2025. END DATE: 5/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Gim Electric Co., Inc. | — |
| applied Feb 26 | #B200415058 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 3/1/2025. END DATE: 3/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Gim Electric Co., Inc. | — |
| applied Jan 29 | #B200412422 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 2/1/2025. END DATE: 3/3/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Gim Electric Co., Inc. | — |
| applied Dec 31 | #B200410001 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 1/1/2025. END DATE: 1/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Gim Electric Co., Inc. | — |
| applied Dec 2 | #B200407413 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 12/2/2024. END DATE: 1/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Gim Electric Co., Inc. | — |
| applied Nov 12 | #B200405343 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. INSTALL TEMPORARY 240 KW DIESEL GENERATOR. RECEPTACLE OUTLETS: 0 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: NORTH PROMENADE. Status: Suspended | Current Communications Corp. | $1.5K |
| applied Oct 31 | #B200404074 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: UTILTY. START DATE: 11/1/2024. END DATE: 12/1/2024. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Gim Electric Co., Inc. | — |