Get ProEvery project in every city · from $79/mo
Get Procommercial project · Chicago, IL
Commercial General Building, Electrical work permitted April 22, 2025, with 7 permits through September 9, 2026, declaring $81,500 of work. Contractor on record: Partytime-Hdo Operations LLC.
Get new commercial permits in Chicago, free weekly email
PERMIT EXPIRES ON 08/04/2026 ERECTION STARTS: 6/15/2026, ERECTION ENDS: 6/19/2026. C3 PRESENTS - OBAMA CENTER OPENING VIEWING PARTYSTRUCTURES- PEER REVIEW- ONE DAY EVENT 6/18/2026ERECT EIGHT (8) STRUCTURES, ONE (1) 88X44X60 VIDEO WALL BOX TRUSS STRUCTURE, ONE (1) 20X8X18 VIDEO PLATFORM RING LOCK STRUCTURE, FOUR (4) 13.5X14.5X27 ARRAY BOX TRUSS TOWER, ONE (1) 32X8X2.5 MEDIA PLATFORM STRUCTURE, ONE (1) 20X16X3.5 ADA PLATFORM STRUCTURE.SETUP 6/15/2026, REMOVE 6/19/2026ASSEMBLY
Chicago permit records name Partytime-Hdo Operations LLC, Frost Lighting Co Of Il and Garett Buzil Csem as the contractors on this project, among 5 contractors in all.
The property owner is included with Pro.
7 permits issued Apr 22 – Sep 9, newest first.
| Issued | Permit | Contractor |
|---|
In Chicago, biggest first.
| Value |
|---|
| applied Sep 8 | #101088237 PERMIT - NEW CONSTRUCTION PERMIT EXPIRES ON 11/09/2026 ERECTION STARTS: 9/26/2026, ERECTION ENDS: 9/27/2026. CBC 2019. REINSTATEMENT OF 2025 PERMIT 101074048 FOR THE 2026 HYDE PARK JAZZ FEST STAGES AT THE MIDWAY PLAISANCE ON SEPT 26-27 2026. SAME 2-24X20 SL-100 MOBILE STAGES WITH WINGS. CSEM. Status: Active | Garett Buzil Csem | $5K |
| applied May 29 | #101084051 PERMIT - NEW CONSTRUCTION PERMIT EXPIRES ON 08/04/2026 ERECTION STARTS: 6/15/2026, ERECTION ENDS: 6/19/2026. C3 PRESENTS - OBAMA CENTER OPENING VIEWING PARTYSTRUCTURES- PEER REVIEW- ONE DAY EVENT 6/18/2026ERECT EIGHT (8) STRUCTURES, ONE (1) 88X44X60 VIDEO WALL BOX TRUSS STRUCTURE, ONE (1) 20X8X18 VIDEO PLATFORM RING LOCK… Status: Active | C3 Presents LLC | $52K |
| applied Jun 1 | #101084182 PERMIT - NEW CONSTRUCTION PERMIT EXPIRES ON 08/02/2026 ERECTION STARTS: 6/16/2023, ERECTION ENDS: 6/18/2023. PROEM - OBAMA CENTER OPENING VIEWING PARTYTENTS - PEER REVIEW- ONE DAY EVENT 6/18/2026ERECT TWO (2) 10X40 (3MX12M) ONE ADJACENT TO EACH PERMITTED (3MX36M) STRUCTURESSETUP 6/16/2026, REMOVE 6/18/2026ASSEMBLY Status: Active | Partytime-Hdo Operations LLC | $2.4K |
| applied May 27 | #101084052 PERMIT - NEW CONSTRUCTION PERMIT EXPIRES ON 07/28/2026 ERECTION STARTS: 6/18/2026, ERECTION ENDS: 6/18/2026. PROEM - OBAMA CENTER OPENING VIEWING PARTYTENTS - PEER REVIEW- ONE DAY EVENT 6/18/2026ERECT SIX (6) STRUCTURES, TWO (2) 10X120 (3MX36M) STRUCTURE, TWO (2) 20X40 FRAME, ONE (1) 30X60 (9MX18M) STRUCTURE GANGED W/… Status: Active | Partytime-Hdo Operations LLC | $18.6K |
| applied Apr 21 | #B200467277 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. INSTALL TEMPORARY 60 KW DIESEL GENERATOR. RECEPTACLE OUTLETS: 0 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: ASSEMBLY TENT AND SEATING IN ICE RINK. Status: Active | Frost Lighting Co Of Il | $2K |
| applied Sep 10 | #101074048 PERMIT - NEW CONSTRUCTION PERMIT EXPIRES ON 11/10/2025 ERECTION STARTS: 9/27/2025, ERECTION ENDS: 9/28/2025. SELF CERT. CBC 2019. 2025 HYDE PARK JAZZ FEST STAGES AT THE MIDWAY PLAISANCE ON SEPT 27-28, 2025. SET-UP IS SEPT 27 AND TAKEDOWN IS SEPT 28, 2025. 2-24X20 SL-100 MOBILE STAGES WITH WINGS. CSEM. Status: Suspended | Stephanie Bulandr Csem | $5K |
| applied Apr 17 | #B200421867 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. INSTALL TEMPORARY 60 KW DIESEL GENERATOR. RECEPTACLE OUTLETS: 0 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: BURTON JUDSON ICE RINK @ UNIVERSITY OF CHICAGO. Status: Suspended | Frost Lighting Co Of Il | $1.5K |