Get ProEvery project in every city · from $79/mo
Get Procommercial project · Charlotte, NC
Commercial General Building, Electrical, Fire Protection work permitted July 21, 2026, with 3 permits through July 21, 2026.
RTAP Structural Changes Medium Voltage transmission infrastructure from substation feeder through distribution to future building systems.
Charlotte’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Jul 21 – Jul 21, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#COM-ACC-26-000137 Accessory · Construction RTAP Structural Changes Medium Voltage transmission infrastructure from substation feeder through distribution to future building systems. Status: Inspection Phase | Not published | — |
Commercial and multifamily, biggest first.
#COM-ELC-26-007113 Electrical · Construction RTAP Structural Changes Medium Voltage transmission infrastructure from substation feeder through distribution to future building systems. Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000152 Fire · Construction RTAP Structural Changes Medium Voltage transmission infrastructure from substation feeder through distribution to future building systems. Status: Inspection Phase | Not published | — |