Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted July 28, 2026, with 7 permits through September 17, 2026, declaring $1,719,110 of work.
Interior Fit out for new office space with Reception area, Conference Room, IT Room, Pantry, Open Workspace and Private Offices.
Charlotte’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
7 permits issued Jul 28 – Sep 17, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#COM-ELC-26-009338 Electrical · Construction LV- cat6 data cabling and security cabling as part of Goodrx build out. Status: Inspection Phase |
Commercial and multifamily, biggest first.
| Not published |
| — |
#COM-ELC-26-008366 Electrical · Construction LV/Control wiring. Status: Inspection Phase | Not published | $18.1K |
#COM-ALT-26-001150 Alteration · Construction Interior Fit out for new office space with Reception area, Conference Room, IT Room, Pantry, Open Workspace and Private Offices. Status: Inspection Phase | Not published | $1.7M |
#COM-ELC-26-007068 Electrical · Construction Removing shell lighting and replacing with front of house lighting. Providing normal power to feed new office space. New bus plug, transformer and panels required, fed from existing infrastructure. Additionally providing fire alarm detection and notification devices throughout. Status: Inspection Phase | Not published | — |
#COM-MEC-26-003476 Mechanical · Construction Providing new Fan Coil Units and VAV units to support the upfit of an existing shell space into an office space.ace. New bus plug, transformer and panels required, fed from existing infrastructure. Additionally providing fire alarm detection and notification devices throughout. Status: Inspection Phase | Not published | — |
#COM-PLM-26-001983 Plumbing · Construction Domestic water will extend from existing water riser, be provided with a tenant meter and extend to serve (2) break sinks, coffee makers, etc. within the office space. Domestic hot water will be created via (2) electric, point of use, heaters located beneath the counters at the two sink locations.… Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000146 Fire · Construction Fire Protection Scope includes an upfit of the existing sprinkler protection to align with the new office space. This involves removing existing upright sprinklers and providing new pendents in each room as necessary. The updated sprinkler system shall be designed to meet the requirements of NFPA… Status: Inspection Phase | Not published | — |