Get Procommercial project · Charlotte, NC
Commercial Electrical work permitted June 23, 2025, with 2 permits through October 9, 2025, declaring $138,900 of work.
Installation of raceways and low voltage cabling for 24 new AED device cabinets being installed throughout the Express Preferred Parking Deck. There are 6 devices per floor. These cabinets are being tied into existing iStar control panels in Comm Rooms with in the deck to monitor a pin switch and visual strobe at each.
Charlotte’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
2 permits issued Jun 23 – Oct 9, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#COM-ELC-25-005069 Electrical · Construction SUPPLY AND INSTALLATION OF LOW VOLTAGE WIRING AND TERMINATIONS OF LOW VOLTAGE WIRING INTO CONDUIT BY OTHERS FOR 20 AED CABINETS THROUGHOUT THE DAILIY DECK WEST. ALL CONDUITS ARE BY OTHER EC UNDER PERMIT#COM-ELC-25-002275. AED CABINETS WILL BE WIRED TO EXISTING I-STAR PANELS FOR MONITORING IF AED… Status: Closed - Coc Issued | Not published | $39.9K |
Commercial and multifamily, biggest first.
#COM-ELC-25-002275 Electrical · Construction Installation of raceways and low voltage cabling for 24 new AED device cabinets being installed throughout the Express Preferred Parking Deck. There are 6 devices per floor. These cabinets are being tied into existing iStar control panels in Comm Rooms with in the deck to monitor a pin switch and… Status: Coc Issued | Not published | $99K |