Get Procommercial project · Charlotte, NC
Commercial General Building, Electrical, Fire Protection work permitted August 14, 2026, with 7 permits through September 4, 2026, declaring $341,000 of work.
ADA hardware swap at elevator lobby, Added power and circuits at atrium tables, Added stair lights at monumental stair, New catering counter with lighting
Charlotte’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
7 permits issued Aug 14 – Sep 4, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#COM-ALT-26-001338 Alteration · Construction New door at elevator lobby to create restroom vestibule Status: Inspection Phase | Not published | $11K | |
Commercial and multifamily, biggest first.
#COM-FIRE-LIFE-26-000425 Fire · Construction (HR) Wells Fargo 47 Vestibule Status: Inspection Phase |
| Not published |
| — |
#COM-ALT-26-001339 Alteration · Construction Commercial Alteration Permit related records: Status: Inspection Phase | Not published | $11K |
#COM-FIRE-LIFE-26-000426 Fire · Construction (HR) Wells Fargo 48 Vestibule Barringer Construction, LLC Status: Inspection Phase | Not published | — |
#COM-ELC-26-008025 Electrical · Construction Added circuits at 46th floor atrium table. New lights at base of monumental stair. Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000330 Fire · Construction (HR) WF 550 South Tryon 46, 47, 48 Barringer Construction, LLC Status: Inspection Phase | Not published | — |
#COM-ALT-26-001273 Alteration · Construction ADA hardware swap at elevator lobby, Added power and circuits at atrium tables, Added stair lights at monumental stair, New catering counter with lighting Status: Inspection Phase | Not published | $330K |