Multifamily General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted June 18, 2026, with 26 permits through September 25, 2026, declaring $3,593,960 of work.
The Amenity/Clubhouse is a 5,500SF Single-story; leasing/office, fitness, multi-purpose room, pool bath/restrooms, mechanical room, kitchen
Charlotte’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
26 permits issued Jun 18 – Sep 25, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#COM-NEW-26-000413 New · Construction Building 6 - 101, 102, 103, 104, 105, 106, 107, 108 Status: Inspection Phase |
Commercial and multifamily, biggest first.
| Not published |
| $710K |
#COM-MEC-26-004813 Mechanical · Construction Building 6 - 101, 102, 103, 104, 105, 106, 107, 108 Status: Inspection Phase | Not published | — |
#COM-PLM-26-002603 Plumbing · Construction Building 6 - 101, 102, 103, 104, 105, 106, 107, 108 Status: Inspection Phase | Not published | — |
#COM-ELC-26-009488 Electrical · Construction Building 6 - 101, 102, 103, 104, 105, 106, 107, 108 Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000713 Fire · Construction Building 6 - 101, 102, 103, 104, 105, 106, 107, 108 Status: Inspection Phase | Not published | — |
#COM-NEW-26-000412 New · Construction Building 5 - 101, 102, 103,104, 105, 106, 107 Status: Inspection Phase | Not published | $631K |
#COM-MEC-26-004807 Mechanical · Construction Building 5 - 101, 102, 103,104, 105, 106, 107 Status: Inspection Phase | Not published | — |
#COM-PLM-26-002601 Plumbing · Construction Building 5 - 101, 102, 103,104, 105, 106, 107 Status: Inspection Phase | Not published | — |
#COM-ELC-26-009482 Electrical · Construction Building 5 - 101, 102, 103,104, 105, 106, 107 Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000710 Fire · Construction Building 5 - 101, 102, 103,104, 105, 106, 107 Status: Inspection Phase | Not published | — |
#COM-NEW-26-000333 New · Construction The Amenity/Clubhouse is a 5,500SF Single-story; leasing/office, fitness, multi-purpose room, pool bath/restrooms, mechanical room, kitchen Status: Inspection Phase | Not published | $776K |
#COM-MEC-26-004342 Mechanical · Construction Rough-In Supply and return ductwork installation per Manual D duct design Refrigerant line set installation between condenser and air handler/coil locations Condensate drain piping with proper slope and secondary drain/pan per code Combustion air and venting rough-in for gas-fired equipment… Status: Inspection Phase | Not published | — |
#COM-PLM-26-002312 Plumbing · Construction Underground / Below-Slab Rough-In Underground sanitary sewer piping from building stub to fixture groups Underground domestic water piping from meter/stub to riser locations Under-slab gas piping (if applicable) with tracer wire and required sleeving Pressure/leak testing of underground piping… Status: Inspection Phase | Not published | — |
#COM-ELC-26-008567 Electrical · Construction Rough-In Underground/overhead electrical service coordination to each building (from utility point of connection or house panel) Panel and meter can rough-in per unit (individual metering assumed) Wire pull and box-in for all lighting, receptacles, switches, and dedicated appliance circuits… Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000453 Fire · Construction Design & Permitting Hydraulic calculations and shop drawings by licensed fire protection contractor/NICET designer Permit submittal and approval through local fire marshal / AHJ Water supply flow test coordination Underground & Rough-In Underground fire water main and lead-in connection from point… Status: Inspection Phase | Not published | — |
#COM-NEW-26-000342 New · Construction Building 3 Units - 101 102 103 Wood floor systems (or slab), exterior and interior wall framing Roof framing/trusses, sheathing, and structural connectors per engineered plans Stair framing for multi-story townhome units Temporary bracing and framing inspections coordination Building Envelope… Status: Inspection Phase | Not published | $728K |
#COM-NEW-26-000343 New · Construction Building 4 - 101,102, 103,104 Foundation systems: monolithic slab, stem wall, or crawlspace per structural plans Termite pre-treatment and vapor barrier installation Foundation waterproofing and perimeter drainage where applicable Framing & Structure Wood floor systems (or slab), exterior and… Status: Inspection Phase | Not published | $749K |
#COM-MEC-26-004440 Mechanical · Construction Building 3 Units - 101 102 103 Rough-In Supply and return ductwork installation per Manual D duct design Refrigerant line set installation between condenser and air handler/coil locations Condensate drain piping with proper slope and secondary drain/pan per code Combustion air and venting rough-in… Status: Inspection Phase | Not published | — |
#COM-MEC-26-004441 Mechanical · Construction Building 4 - Units 101,102,103, 104 Rough-In Supply and return ductwork installation per Manual D duct design Refrigerant line set installation between condenser and air handler/coil locations Condensate drain piping with proper slope and secondary drain/pan per code Combustion air and venting… Status: Inspection Phase | Not published | — |
#COM-PLM-26-002371 Plumbing · Construction Building 3 Units - 101 102 103 Underground / Below-Slab Rough-In Underground sanitary sewer piping from building stub to fixture groups Underground domestic water piping from meter/stub to riser locations Under-slab gas piping (if applicable) with tracer wire and required sleeving Pressure/leak… Status: Inspection Phase | Not published | — |
#COM-PLM-26-002372 Plumbing · Construction Building 4 101, 102, 103, 104 Underground / Below-Slab Rough-In Underground sanitary sewer piping from building stub to fixture groups Underground domestic water piping from meter/stub to riser locations Under-slab gas piping (if applicable) with tracer wire and required sleeving Pressure/leak… Status: Inspection Phase | Not published | — |
#COM-ELC-26-008748 Electrical · Construction Building 3 Units - 101 102 103 Rough-In Underground/overhead electrical service coordination to each building (from utility point of connection or house panel) Panel and meter can rough-in per unit (individual metering assumed) Wire pull and box-in for all lighting, receptacles, switches, and… Status: Inspection Phase | Not published | — |
#COM-ELC-26-008749 Electrical · Construction Rough-In Underground/overhead electrical service coordination to each building (from utility point of connection or house panel) Panel and meter can rough-in per unit (individual metering assumed) Wire pull and box-in for all lighting, receptacles, switches, and dedicated appliance circuits… Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000492 Fire · Construction Building 3 - Units 101,102,103 Design & Permitting Hydraulic calculations and shop drawings by licensed fire protection contractor/NICET designer Permit submittal and approval through local fire marshal / AHJ Water supply flow test coordination Underground & Rough-In Underground fire water main… Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000493 Fire · Construction Building 4 - 101 102 103 104 Design & Permitting Hydraulic calculations and shop drawings by licensed fire protection contractor/NICET designer Permit submittal and approval through local fire marshal / AHJ Water supply flow test coordination Underground & Rough-In Underground fire water main and… Status: Inspection Phase | Not published | — |
#COM-ELC-26-005803 Electrical · Construction This is only for a saw service Permit is separate from the electrical scope of work per the plan review. Status: Inspection Phase | Not published | $500 |