Get Procommercial project · Charlotte, NC
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted August 4, 2026, with 80 permits through October 19, 2026, declaring $305,525 of work.
Building 2000 We are installing a Radon/vapor mitigation system sub slab and will be venting in through the roof to code.
Charlotte’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
80 permits issued Aug 4 – Oct 19, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#COM-MEC-26-005228 Mechanical · Construction Building 2000 We are installing a Radon/vapor mitigation system sub slab and will be venting in through the roof to code. |
Commercial and multifamily, biggest first.
Status: Inspection Phase
| Not published |
| $273K |
#COM-MEC-26-005231 Mechanical · Construction Building 3000 We are installing a Radon/vapor mitigation system sub slab and will be venting it through the roof to code. Status: Inspection Phase | Not published | $273K |
#COM-SITE-26-000362 Site Works · Construction Installation of water and sewer to Pool Clubhouse Status: Inspection Phase | Not published | — |
#COM-MEC-26-005149 Mechanical · Construction Radon vapor mitigations system before slabs are poured and will stack the vent risers through the roof to code. Status: Inspection Phase | Not published | $273K |
#COM-ELC-26-010066 Electrical · Construction Building 9000 electrical underground in slab installing electrical conduits for island receptacles Status: Inspection Phase | Not published | $1.5K |
#COM-ELC-26-010023 Electrical · Construction Building 2000 F/F installing electrical conduits for island receptacles and low voltage conduit for incoming telecom Status: Inspection Phase | Not published | $1.5K |
#COM-ELC-26-010062 Electrical · Construction Building 7000 electrical underground in slab installing electrical conduits for island receptacles Status: Inspection Phase | Not published | $1.5K |
#COM-ELC-26-010060 Electrical · Construction Building 5000 electrical underground in slab installing electrical conduits for island receptacles Status: Inspection Phase | Not published | $1.5K |
#COM-ELC-26-010059 Electrical · Construction Bldg 3000 Electrical underground in slab Installing electrical conduits for island receptacles Status: Inspection Phase | Not published | $1.5K |
#COM-PLM-26-002549 Plumbing · Construction Water and sewer service to building 7000. Status: Inspection Phase | Not published | $4K |
#COM-SITE-26-000374 Site Works · Construction Water and sewer service to building 7000. Status: Inspection Phase | Not published | — |
#COM-PLM-26-002509 Plumbing · Construction Installation of water and sewer to Pool Clubhouse Status: Inspection Phase | Not published | $3K |
#COM-SITE-26-000363 Site Works · Construction Install of sewer and water for Building 4000 Status: Inspection Phase | Not published | — |
#COM-PLM-26-002510 Plumbing · Construction Install of sewer and water for Building 4000 Status: Inspection Phase | Not published | $4K |
#COM-SITE-26-000371 Site Works · Construction Water and sewer service to Building 3000 Status: Inspection Phase | Not published | — |
#COM-PLM-26-002544 Plumbing · Construction Water service to dumpster enclosure Status: Inspection Phase | Not published | $1.5K |
#COM-SITE-26-000370 Site Works · Construction Water service to dumpster enclosure Status: Inspection Phase | Not published | — |
#COM-PLM-26-002543 Plumbing · Construction Water and sewer service to maintenance building Status: Inspection Phase | Not published | $3K |
#COM-SITE-26-000369 Site Works · Construction Water and sewer service to maintenance building Status: Inspection Phase | Not published | — |
#COM-PLM-26-002542 Plumbing · Construction Pool Pump House - Site Utility Status: Inspection Phase | Not published | $1.5K |
#COM-SITE-26-000368 Site Works · Construction Water service to pool area. Status: Inspection Phase | Not published | — |
#COM-PLM-26-002548 Plumbing · Construction Water and sewer service to Building 8000. Status: Inspection Phase | Not published | $5K |
#COM-PLM-26-002547 Plumbing · Construction Water and sewer service to B5000 Status: Inspection Phase | Not published | $3K |
#COM-SITE-26-000373 Site Works · Construction Water and sewer service to Building 8000. Status: Inspection Phase | Not published | — |
#COM-SITE-26-000372 Site Works · Construction Water and sewer service to B5000 Status: Inspection Phase | Not published | — |
#COM-PLM-26-002546 Plumbing · Construction Water and sewer service to Building 3000 Status: Inspection Phase | Not published | $10K |
#COM-PLM-26-002552 Plumbing · Construction Water and sewer service for building 9000. Status: Inspection Phase | Not published | $6K |
#COM-SITE-26-000377 Site Works · Construction Water and sewer service for building 9000. Status: Inspection Phase | Not published | — |
#COM-PLM-26-002551 Plumbing · Construction Water service for dog spa. Status: Inspection Phase | Not published | $1.5K |
#COM-SITE-26-000376 Site Works · Construction Water service for dog spa. Status: Inspection Phase | Not published | — |
#COM-PLM-26-002550 Plumbing · Construction Water and sewer service for building 6000 Status: Inspection Phase | Not published | $4K |
#COM-SITE-26-000375 Site Works · Construction Water and sewer service for building 6000 Status: Inspection Phase | Not published | — |
#COM-PLM-26-002500 Plumbing · Construction installation of underground sanitary sewer, domestic water, and storm drainage lines beneath the building slab for a 45,500 SF structure. Concrete Foundation portion covers 15,185 SF. All underground plumbing will be installed, pressure-tested, and inspected prior to placement of the vapor barrier… Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000606 Fire · Construction Trash Enclosure - Footing/Foundation Status: Inspection Phase | Not published | — |
#COM-FF-FDN-26-000052 FootingFoundation · Construction Trash Enclosure - Footing/Foundation Status: Inspection Phase | Not published | — |
#COM-PLM-26-002491 Plumbing · Construction Trash Enclosure - Footing/Foundation Status: Inspection Phase | Not published | — |
#COM-FF-FDN-26-000051 FootingFoundation · Construction foundation and underground plumbing phase for a 1,463 Maintenance/Carwash/Garage building. Work includes excavation, formwork, and installation of a post-tension reinforced concrete slab-on-grade, including PT cable placement, stressing, and grouting per approved structural plans. Prior to the… Status: Inspection Phase | Not published | — |
#COM-PLM-26-002490 Plumbing · Construction installation of underground sanitary sewer, domestic water, and storm drainage lines beneath the building slab for a 1,463 SF structure. Concrete Foundation portion covers 1,463 SF. All underground plumbing will be installed, pressure-tested, and inspected prior to placement of the vapor barrier… Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000605 Fire · Construction Maintenance/Carwash/Garage building Status: Inspection Phase | Not published | — |
#COM-FF-FDN-26-000054 FootingFoundation · Construction This permit covers the foundation phase for a 1,944 SF single-level Garage Building. Work includes excavation, formwork, and installation of a post-tension reinforced concrete slab-on-grade, including PT cable placement, stressing, and grouting per approved structural plans. All work will be… Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000608 Fire · Construction This permit covers the foundation phase for a 1,944 SF single-level Garage Building. Work includes excavation, formwork, and installation of a post-tension reinforced concrete slab-on-grade, including PT cable placement, stressing, and grouting per approved structural plans. All work will be… Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000609 Fire · Construction B5000 Footing/Foundation Status: Inspection Phase | Not published | — |
#COM-FF-FDN-26-000055 FootingFoundation · Construction underground plumbing phase for a 48,737 SF 3/4 split-level apartment building. Concrete Foundation portion covers 13,646 SF. Work includes excavation, formwork, and installation of a post-tension reinforced concrete slab-on-grade, including PT cable placement, stressing, and grouting per approved… Status: Inspection Phase | Not published | — |
#COM-PLM-26-002492 Plumbing · Construction installation of underground sanitary sewer, domestic water, and storm drainage lines beneath the building slab for a 48.737 SF structure. Concrete Foundation portion covers 13,646 SF. All underground plumbing will be installed, pressure-tested, and inspected prior to placement of the vapor barrier… Status: Inspection Phase | Not published | — |
#COM-FF-FDN-26-000056 FootingFoundation · Construction Foundation and underground plumbing phase for a 45,500 SF 3-level apartment building. Concrete Foundation portion covers 15,185 SF. Work includes excavation, formwork, and installation of a post-tension reinforced concrete slab-on-grade, including PT cable placement, stressing, and grouting per… Status: Inspection Phase | Not published | — |
#COM-PLM-26-002493 Plumbing · Construction installation of underground sanitary sewer, domestic water, and storm drainage lines beneath the building slab for a 45,500 SF structure. Concrete Foundation portion covers 15,185 SF. All underground plumbing will be installed, pressure-tested, and inspected prior to placement of the vapor barrier… Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000610 Fire · Construction B6000 Footing/Foundation Status: Inspection Phase | Not published | — |
#COM-FF-FDN-26-000057 FootingFoundation · Construction underground plumbing phase for a 48,737 SF 3/4 split-level apartment building. Concrete Foundation portion covers 13,646 SF. Work includes excavation, formwork, and installation of a post-tension reinforced concrete slab-on-grade, including PT cable placement, stressing, and grouting per approved… Status: Inspection Phase | Not published | — |
#COM-PLM-26-002494 Plumbing · Construction installation of underground sanitary sewer, domestic water, and storm drainage lines beneath the building slab for a 48.737 SF structure. Concrete Foundation portion covers 13,646 SF. All underground plumbing will be installed, pressure-tested, and inspected prior to placement of the vapor barrier… Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000611 Fire · Construction B7000 - Footing/Foundation Status: Inspection Phase | Not published | — |
#COM-FF-FDN-26-000058 FootingFoundation · Construction foundation and underground plumbing phase for a 299 SF Dog Spa/Wash structure. Work includes excavation, formwork, and installation of a post-tension reinforced concrete slab-on-grade, including PT cable placement, stressing, and grouting per approved structural plans. Prior to the slab pour,… Status: Inspection Phase | Not published | — |
#COM-PLM-26-002498 Plumbing · Construction installation of underground sanitary sewer, domestic water, and storm drainage lines beneath the building slab for a 299 SF structure. All underground plumbing will be installed, pressure-tested, and inspected prior to placement of the vapor barrier and post-tension concrete slab pour. Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000613 Fire · Construction Dog Spa - Footing/Foundation Status: Inspection Phase | Not published | — |
#COM-FF-FDN-26-000059 FootingFoundation · Construction foundation and underground plumbing phase for a 45,500 SF 3-level apartment building. Concrete Foundation portion covers 15,185 SF. Work includes excavation, formwork, and installation of a post-tension reinforced concrete slab-on-grade, including PT cable placement, stressing, and grouting per… Status: Inspection Phase | Not published | — |
#COM-ELC-26-009141 Electrical · Construction installation of underground conduit and associated pathways for telecommunications/fiber-optic service infrastructure. Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000615 Fire · Construction "6" DIP stub up in riser room foundation Status: Inspection Phase | Not published | — |
#COM-PLM-26-002504 Plumbing · Construction Installation of sewer lateral and 2" water service to building 2000 at 14111 Declan Ridge Road. Project Number 470532. Status: Inspection Phase | Not published | $3.5K |
#COM-FF-FDN-26-000061 FootingFoundation · Construction foundation phase for a 1,830 SF single-level Garage Building. Work includes excavation, formwork, and installation of a post-tension reinforced concrete slab-on-grade, including PT cable placement, stressing, and grouting per approved structural plans. All work will be performed in accordance with… Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000618 Fire · Construction Car Garage (G100) Footing/Foundation Status: Inspection Phase | Not published | — |
#COM-FF-FDN-26-000062 FootingFoundation · Construction foundation and underground plumbing phase for a 48,737 SF 3/4 split-level apartment building. Concrete Foundation portion covers 13,646 SF. Work includes excavation, formwork, and installation of a post-tension reinforced concrete slab-on-grade, including PT cable placement, stressing, and… Status: Inspection Phase | Not published | — |
#COM-PLM-26-002505 Plumbing · Construction installation of underground sanitary sewer, domestic water, and storm drainage lines beneath the building slab for a 48.737 SF structure. Concrete Foundation portion covers 13,646 SF. All underground plumbing will be installed, pressure-tested, and inspected prior to placement of the vapor barrier… Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000619 Fire · Construction B9000 - Footing/Foundation Status: Inspection Phase | Not published | — |
#COM-FF-FDN-26-000050 FootingFoundation · Construction foundation and underground plumbing phase for a 392 SF Pool Pump/Restroom Building. Work includes excavation, formwork, and installation of a post-tension reinforced concrete slab-on-grade, including PT cable placement, stressing, and grouting per approved structural plans. Prior to the slab pour,… Status: Inspection Phase | Not published | — |
#COM-PLM-26-002482 Plumbing · Construction foundation and underground plumbing phase for a 392 SF Pool Pump/Restroom Building. Work includes excavation, formwork, and installation of a post-tension reinforced concrete slab-on-grade, including PT cable placement, stressing, and grouting per approved structural plans. Prior to the slab pour,… Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000598 Fire · Construction foundation and underground plumbing phase for a 392 SF Pool Pump/Restroom Building. Work includes excavation, formwork, and installation of a post-tension reinforced concrete slab-on-grade, including PT cable placement, stressing, and grouting per approved structural plans. Prior to the slab pour,… Status: Inspection Phase | Not published | — |
#COM-FF-FDN-26-000049 FootingFoundation · Construction This permit covers the foundation and underground plumbing phase for a 48,737 SF 3/4 split-level apartment building. Concrete Foundation portion covers 13,646 SF. Work includes excavation, formwork, and installation of a post-tension reinforced concrete slab-on-grade, including PT cable placement,… Status: Inspection Phase | Not published | — |
#COM-PLM-26-002471 Plumbing · Construction installation of underground sanitary sewer, domestic water, and storm drainage lines beneath the building slab for a 48.737 SF structure. Concrete Foundation portion covers 13,646 SF. All underground plumbing will be installed, pressure-tested, and inspected prior to placement of the vapor barrier… Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000587 Fire · Construction *6" DIP stub in at riser room foundation Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000353 Fire · Construction 6" DIP stub in at riser room foundation Status: Inspection Phase | Not published | — |
#COM-PLM-26-002208 Plumbing · Construction This permit covers the installation of underground sanitary sewer, domestic water, and storm drainage lines beneath the building slab for a 54,385 SF structure. Concrete Foundation portion covers 15,157 SF. All underground plumbing will be installed, pressure-tested, and inspected prior to… Status: Inspection Phase | Not published | — |
#COM-FF-FDN-26-000044 FootingFoundation · Construction This permit covers the foundation and underground plumbing phase for a 54,385 SF 3/4 split-level apartment building. Concrete Foundation portion covers 15,157 SF. Work includes excavation, formwork, and installation of a post-tension reinforced concrete slab-on-grade, including PT cable placement,… Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000251 Fire · Construction 6" DIP stub in at riser room foundation Status: Inspection Phase | Not published | — |
#COM-PLM-26-002095 Plumbing · Construction This permit covers the installation of underground sanitary sewer, domestic water, and storm drainage lines beneath the building slab for a 45,500 SF structure. Concrete Foundation portion covers 15,185 SF. All underground plumbing will be installed, pressure-tested, and inspected prior to… Status: Inspection Phase | Not published | — |
#COM-FF-FDN-26-000036 FootingFoundation · Construction his permit covers the foundation and underground plumbing phase of a building measuring approximately 15,185 SF. Work includes excavation, formwork, and installation of a post-tension reinforced concrete slab-on-grade, including PT cable placement, stressing, and grouting per approved structural… Status: Inspection Phase | Not published | — |
#COM-FF-FDN-26-000037 FootingFoundation · Construction This permit covers the foundation and underground plumbing and electrical phase for a one level 7,259 SF Commercial Clubhouse/Leasing building. Work includes excavation, formwork, and installation of a post-tension reinforced concrete slab-on-grade, including PT cable placement, stressing, and… Status: Inspection Phase | Not published | — |
#COM-ELC-26-007622 Electrical · Construction This permit covers the installation of underground electrical conduit and floor outlet rough-in for a one-level, 7,259 SF clubhouse/leasing building, prior to slab pour. Status: Inspection Phase | Not published | — |
#COM-PLM-26-002096 Plumbing · Construction This permit covers the installation of underground sanitary sewer, domestic water, and storm drainage lines for a one-level, 7,259 SF clubhouse/leasing building. All underground plumbing will be roughed-in beneath the slab area, including necessary connections to building fixtures and exterior… Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000252 Fire · Construction B1000 Footing/Foundation (Clubhouse) Status: Inspection Phase | Not published | — |
#COM-FF-FDN-26-000038 FootingFoundation · Construction his permit covers the excavation, formwork, and installation of footings and a post-tension reinforced concrete slab-on-grade foundation for a 7-car, 1,830 SF for-rent garage building. Work includes placement of the vapor barrier, PT cable tendons, and reinforcing steel per approved structural… Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000253 Fire · Construction Non-sprinkled, no fire alarm. Status: Inspection Phase | Not published | — |