Get ProEvery project in every city · from $79/mo
Get Procommercial project · Charlotte, NCNew: first permit Oct 28
Commercial General Building, Fire Protection work permitted October 28, 2026, with 2 permits through October 28, 2026, declaring $300,000 of work.
RTAP - Revision 42 incorporates revisions to the fire walls between Buildings 1 and 3, Buildings 2 and 3, and Buildings 4 and 5 in accordance with NCSBC Section 706.6, Exception 3, to provide the required vertical continuity of the fire walls. In accordance with Exception 3, the fire walls terminate at the underside of the noncombustible roof structure. Application of this exception eliminates the need for certain previously rated structural elements within Buildings 1, 2, 4, and 5. The affected drawings have been revised accordingly.
Charlotte’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
2 permits issued Oct 28 – Oct 28, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#COM-NEW-26-000495 New · Construction RTAP - Revision 42 incorporates revisions to the fire walls between Buildings 1 and 3, Buildings 2 and 3, and Buildings 4 and 5 in accordance with NCSBC Section 706.6, Exception 3, to provide the required vertical continuity of the fire walls. In accordance with Exception 3, the fire walls… |
Commercial and multifamily, biggest first.
Status: Inspection Phase
| Not published |
| $300K |
#COM-FIRE-LIFE-26-001025 Fire · Construction RTAP - Revision 42 incorporates revisions to the fire walls between Buildings 1 and 3, Buildings 2 and 3, and Buildings 4 and 5 in accordance with NCSBC Section 706.6, Exception 3, to provide the required vertical continuity of the fire walls. In accordance with Exception 3, the fire walls… Status: Inspection Phase | Not published | — |