Get ProEvery project in every city · from $79/mo
Get Procommercial project · Charlotte, NC
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted September 23, 2026, with 4 permits through October 2, 2026, declaring $235,680 of work.
Upgrade procedure rooms, sterile corridors, and restricted corridors for unoccupied setback control.
Charlotte’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
4 permits issued Sep 23 – Oct 2, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#COM-ELC-26-007912 Electrical · Construction LV - low voltage room pressure monitor and sensors in sterile corridor outside of surgery suite. Status: Inspection Phase | Not published | $17.5K |
Commercial and multifamily, biggest first.
#COM-ALT-26-001508 Alteration · Construction Upgrade procedure rooms, sterile corridors, and restricted corridors for unoccupied setback control. Status: Inspection Phase | Not published | $218K |
#COM-MEC-26-004802 Mechanical · Construction FSS is responsible for delivering a fully operational system that shall control, monitor, and optimize HVAC equipment in accordance with the project drawings, specifications, and sequences of operation. Status: Inspection Phase | Not published | — |
#COM-FIRE-LIFE-26-000709 Fire · Construction Firestop and seal all penetrations to maintain the required UL-rated assembly of the wall, partition, floor, or barrier Status: Inspection Phase | Not published | — |