Commercial General Building, Hvac/Mechanical work permitted November 19, 2024, with 2 permits through December 8, 2025, declaring $151,680 of work. Contractor on record: Weaver Metal& Roofing (Abestos.
Removal of ancillary ACM per code rule 56. Remove existing roof to wood deck and install vapor retarder/temporary roof. Install tapered insulation, min. R-30, 1/8" per foot slope to drain with a 3/8" coverboard, all-in low-rise adhesive. Install a fully adhered 060 EPDM. Fabricate and install all associated sheet metal flashings. *** Clearance letter required prior to final inspection ***
Buffalo permit records name Weaver Metal& Roofing (Abestos and William Brown as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
2 permits issued Nov 19 – Dec 8, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#REP25-9664891
REPAIR · GENERAL CONTRACTOR
Removal of ancillary ACM per code rule 56. Remove existing roof to wood deck and install vapor retarder/temporary roof. Install tapered insulation, min. R-30, 1/8" per foot slope to drain with a 3/8" coverboard, all-in low-rise adhesive. Install a fully adhered 060 EPDM. Fabricate and install all…
| Weaver Metal& Roofing (Abestos |
| $130K |
#HEAT24-9625605 HEATING · HEATING CONTRACTOR Install (1) Lochinvar Boiler | William Brown | $21.7K |