Get ProEvery project in every city · from $79/mo
Get Procommercial project · Buffalo, NY
Commercial General Building, Electrical work permitted July 8, 2025, with 3 permits through April 28, 2026, declaring $458,532 of work. Contractor on record: Deborah Scherer.
Remove existing roof to the deck, install new insulation (R 33), new cricket between drains, new .060 EPDM Membrane. Reuse existing stainless steel metal perimeter edge. Provide a 20 yr 90 MPH Warranty. *** ASBESTOS SURVEY ATTACHED ***
Buffalo permit records name Deborah Scherer and Thomas Neth as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
3 permits issued Jul 8 – Apr 28, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#REP26-9685481 REPAIR · LIGHT COMMERCIAL CONTRACTOR Remove existing roof to the deck, install new insulation (R 33), new cricket between drains, new .060 EPDM Membrane. Reuse existing stainless steel metal perimeter edge. Provide a 20 yr 90 MPH Warranty. *** ASBESTOS SURVEY ATTACHED *** |
Commercial and multifamily, biggest first.
| Thomas Neth |
| $439K |
#ELEC25-9656906 ELECTRICAL · MASTER ELECTRICIAN Install 15 amp and 40 amp 208 volt three phase circuit breaker in place of 20 amp and 35 amp 208 volt three phase circuit breaker in LPEM124A panel board. Replaced 15 amp circuit breaker Could not replace 35 amp circuit breaker due to 10 ga conductors on circuit breaker, 10 ga conductors are… | Deborah Scherer | $11.8K |
#ELEC25-9650976 ELECTRICAL · MASTER ELECTRICIAN Disconnect and remove equipment and cabling from existing equipment panel Install new NEMA 3R 20 inch by 20 inch by 6 inch weatherproof, gasketed hinged door and equipment mounting back plate, equipment panel on main satellite with new galvanized mounting hardware. Ground and bond panel. Excavate… | Deborah Scherer | $7.7K |
In Buffalo, biggest first.