Get Procommercial project · Buffalo, NY
Commercial General Building work permitted September 29, 2026, with 4 permits through October 22, 2026, declaring $336,000 of work. Contractor on record: Estimator Marty Beecroft.
Coordinate with general contractor who will tear off existing roof.Install two layers of 3" insulation. R-34 rating.Install Elevate TPO Invisiweld Roof SystemUnaEdge gravel stop edge metal. 20 yr/90 MPH manufacturers warranty *** ASBESTOS SURVEY ATTACHED ***
Buffalo permit records name Estimator Marty Beecroft as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 3 permits issued in the last 30 days is included with Pro.
See the contractor4 permits issued Sep 29 – Oct 22, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
#REP26-9711137 REPAIR · GENERAL CONTRACTOR Tear off existing ( UPPER ) level roof only no structural changes in preparation to expose ACM for abatement for future work to be done on separate permit. *** Attached Asbestos Survey *** *** All suspect and identified ACM must only be disturbed by a licensed NYS asbestos contractor and asbestos… | Contractor with Pro | $29K |
#TEAR26-9711136 TEAROUT · GENERAL CONTRACTOR Selective interior tear out no structural changes to expose ACM areas of the structure for abatement in preparation for future work to be done on a separate permit. *** Attached Asbestos Survey *** *** All suspect and identified ACM must only be disturbed by a licensed NYS asbestos contractor and… | Contractor with Pro | $30K |
#REP26-9709774 REPAIR · GENERAL CONTRACTOR Tear off existing ( lower ) level roof only no structural changes in preparation to expose ACM for abatement for future work to be done on separate permit. *** Attached Asbestos Survey *** *** The building inspector must be provided with asbestos clearance letter prior to final inspection. *** | Contractor with Pro | $100K |
#REP26-9706985 REPAIR · LIGHT COMMERCIAL CONTRACTOR Coordinate with general contractor who will tear off existing roof.Install two layers of 3" insulation. R-34 rating.Install Elevate TPO Invisiweld Roof SystemUnaEdge gravel stop edge metal. 20 yr/90 MPH manufacturers warranty *** ASBESTOS SURVEY ATTACHED *** | Estimator Marty Beecroft | $177K |