Commercial General Building, Demolition, Electrical, Fire Protection work permitted November 20, 2024, with 9 permits through August 25, 2026, declaring $3,024,150 of work.
Fast Track-Boston Medical Center-Emergency Department Critical Expedited selective renovation to existing space as per plans. Modification to Layout, M/E/P's , FA, Sprinkler. All work in full compliance with MGL 780 CMR, 527 CMR, 521 CMR & MA DPH Regulation.
Boston’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
9 permits issued Nov 20 – Aug 25, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#SF1891786 Short Form Bldg Permit · OTHER Boston Medical Center -Moakley Building- Install PIXXIS OMNICELL Med Room External Return Bins at various Nurses Stations as needed. Status: Open |
Commercial and multifamily, biggest first.
| $950 |
#SF1805414 Short Form Bldg Permit · OTHER BMC Albany St Bridge Tower Connecting 830 Harrison w/ 740 Albany Street- Begin construction on pending ALT 1798350 addition to stair tower. Selective demolition, site work, scaffolding, rough framing, electrical and mechanical work. Approved by Boston Planning. All work in full compliance w/780 CMR Status: Open | Not published | $20K |
#SF1747509 Short Form Bldg Permit · INTREN Boston Medical-Assist Seamen's Medical with installation of new Radiology Equipment. Remove and reinstall door, ceiling, repair areas as needed. Relocate X 4 sprinkler head to work in accordance with NFPA 13 ,if needed around new X-Ray machine. All work in full compliance with 780 CMR, 521 CMR Status: Open | Not published | $2K |
#SF1706252 Short Form Bldg Permit · INTREN BMC-X-RAY MENINO ME1153 Assist with installation f new equipment , install unistrut, electrical connection, raise 6 sprinkler head and lower same after installation. All work in full compliance with 780 CMR, 527 CMR, 521 CMR. No changes to egress or Life safety Systems. Status: Open | Not published | $2K |
#SF1706261 Short Form Bldg Permit · INTREN BMC-EB- LAB - MENINO Assist with installation f new equipment , install unistrut, electrical connection, raise 8 sprinkler head and lower same after installation. Modify Med Gasses. All work in full compliance with 780 CMR, 527 CMR, 521 CMR. No changes to egress or Life safety Systems. Status: Open | Not published | $2K |
#ALT1696929 Long Form/Alteration Permit · FSTTRK Fast Track-Boston Medical Center-Emergency Department Critical Expedited selective renovation to existing space as per plans. Modification to Layout, M/E/P's , FA, Sprinkler. All work in full compliance with MGL 780 CMR, 527 CMR, 521 CMR & MA DPH Regulation. Status: Open | Not published | $3M |
#SF1686072 Short Form Bldg Permit · INTREN Boston Medical Center- Menino Building Floor 1 Pediatric Triage- Replace & Repairs to reception desk area- drywall, lighting,receptacles, supply return diffusers, replace 2 doors, relocated two sprinkler head. No changes Life Safety or egress All work in full compliance with 780 CMR,527 CMR,521 CM Status: Open | Not published | $2K |
#SF1672879 Short Form Bldg Permit · OTHER Boston Medical Center selective demolition & separation to grade . Physically cut ALL of existing building systems & structures for construction of new lobby Yawkey / Menino Lobby. Work and fees under ALT 1581808 & ALT 1581831. All work in compliance with 780 CMR, 527 CMR, 521 CMR Status: Open | Not published | $2K |
#SF1672041 Short Form Bldg Permit · INTREN Boston Medical Center- INTERIOR- selective demolition of 250SF of ACT ceiling and turn-up 2 sprinkler heads. All work associated with ALT 16661411 Menino / Yawkey Lobby. All work in full compliance with 780 CMR, 527 CMR, 521 CMR Status: Open | Not published | $1.2K |