Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Boston, MA
Multifamily General Building work permitted July 27, 2026, declaring $60,000 of work.
Install new concrete sidewalk with compacted gravel base and drainage slope, construct reinforced cast-in-place concrete steps, and pave rear yard area with asphalt for dumpster access and rolling path.Contracted to Install new chain-link fence with concrete footings, top rail, one double vehicle gate, two pedestrian gates, and required 2-foot steel railings/guards. Includes site preparation, grading, and compaction as needed.
Boston’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
1 permit issued Jul 27 – Jul 27, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#ALT1839901 Long Form/Alteration Permit · FENCE2 Install new concrete sidewalk with compacted gravel base and drainage slope, construct reinforced cast-in-place concrete steps, and pave rear yard area with asphalt for dumpster access and rolling path.Contracted to Install new chain-link fence with concrete footings, top rail, one double vehicle… Status: Closed |
Commercial and multifamily, biggest first.
| $60K |