Get ProEvery project in every city · from $79/mo
Get Procommercial project · Boston, MA
Commercial Electrical, Fire Protection work permitted January 7, 2025, with 22 permits through October 6, 2026, declaring $3,481,500 of work.
Terminal E Baggage Claim upgrade 4 new IDF with new backbone fiber and copper cabling. Install 433 speakers for paging and new equipment Furnish and install 22 new patch panels Furnish and install 344 dual cat 6A locations. Security 50 exterior cameras for CBP Ceiling mount microphones Access control for MPA door doors for (2) doors linking new DIB and demo and relocation of 8 doors AV Mount (5) stainless steel structures (Type 1,2,3) with LG monitors
Boston’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
22 permits issued Jan 7 – Oct 6, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#ELV1907141 Electrical Low Voltage · LVOLT low voltage for new Dunkin. at Terminal E - Arrivals level - public side Status: Open | Not published | $9K |
Commercial and multifamily, biggest first.
#E1907140 Electrical Permit · ELECTRICAL Power, lighting, for new Dunkin. at Terminal E - Arrivals level - public side Status: Open | Not published | $45K |
#E1873335 Electrical Permit · ELECTRICAL E26062 MPA add 30 duplex receptacles and replace 632 light fixtures. Status: Open | Not published | $199K |
#E1860413 Electrical Permit · ELECTRICAL PILE GROUNDING, DUCT BANK CONDUIT ENTRY TO MANHOLE AND MISC CHANGE ORDER SCOPEFOR SITE ENABLING. Foundation Pile Grounding, DUCT BANK CONDUITS Status: Open | Not published | $25K |
#E1838194 Electrical Permit · ELECTRICAL Installation of power for relocated display cases and signage at Terminal E Departures Level by TSA Checkpoint Status: Closed | Not published | $65K |
#ELV1838199 Electrical Low Voltage · LVOLT Installation data for relocated display cases and signage @ Terminal E Departures Level by TSA Checkpoint Status: Closed | Not published | $10K |
#E1820517 Electrical Permit · ELECTRICAL E25113 MPA Boiler replacement. replace 12 motor starters/ conduit and wire, 2- VFD’s / conduit and wire, replace 50 light fixtures, add 1-100-amp panel and 1-15KVA transformer. Status: Open | Not published | $299K |
#E1807951 Electrical Permit · ELECTRICAL Installation of Power, lighting, for a food court restaurant @ Terminal E - Near Gate E8 Status: Open | Not published | $260K |
#ELV1807957 Electrical Low Voltage · LVOLT Installation Low Voltage wiring for a food court restaurant @ Terminal E - Near Gate E8 Status: Open | Not published | $22K |
#EFA1807953 Electrical Fire Alarms · FA Installation fire alarm wiring for a food court restaurant @ Terminal E - Near Gate E8 Status: Open | Not published | $23K |
#EFA1781733 Electrical Fire Alarms · FA FA - Relocate 3 nodes and add 7 devices @ Terminal E - 2nd floor - INS Corridor Status: Open | Not published | $75K |
#E1781732 Electrical Permit · ELECTRICAL Power and lighting for install of 3 moving walkways @ Terminal E - 2nd floor - INS Corridor Status: Open | Not published | $160K |
#ELV1781734 Electrical Low Voltage · LVOLT Low Voltage install 9 new cameras @ Terminal E - 2nd floor - INS Corridor Status: Open | Not published | $50K |
#E1746380 Electrical Permit · ELECTRICAL Make safe of 2 power poles so desks can be removed Status: Open | Not published | $2.5K |
#E1717039 Electrical Permit · ELECTRICAL E23018- disconnect and reconnect 100A feed and replace the disconnect. Status: Open | Not published | $5K |
#E1731254 Electrical Permit · ELECTRICAL Electrical make-safe for restaurant decommisioning @ Terminal E - Pre-security Departures level Status: Open | Not published | $2K |
#E1728021 Electrical Permit · ELECTRICAL Terminal E Jet Bridges E3 through E9. Heat Trace self regulating cable and controller for water line to water cabinet. Heat Trace Controllers and self regulating cable on water line. @ Terminal E - Jet Bridge E3 - E9 Status: Closed | Not published | $10K |
#E1688414 Electrical Permit · ELECTRICAL E25012 Air France Lounge electrically modify the AF lounge. Status: Closed | Not published | $310K |
#EFA1688415 Electrical Fire Alarms · FA E25012 Air France Lounge add FA devices to an existing FA system. Status: Open | Not published | $2K |
#E1686205 Electrical Permit · ELECTRICAL E19132 MPA Term E baggage line feeder, lighting, and heater. Status: Closed | Not published | $20K |
#E1686209 Electrical Permit · ELECTRICAL E19132 MPA Terminal E baggage fire protection. Status: Open | Not published | $5K |
#ELV1681786 Electrical Low Voltage · LVOLT Terminal E Baggage Claim upgrade 4 new IDF with new backbone fiber and copper cabling. Install 433 speakers for paging and new equipment Furnish and install 22 new patch panels Furnish and install 344 dual cat 6A locations. Security 50 exterior cameras for CBP Ceiling mount microphones Access… Status: Open | Not published | $1.9M |