Commercial General Building, Electrical work permitted March 14, 2025, with 4 permits through July 20, 2026, declaring $771,661 of work.
Replacement of existing fume hood on the 6th floor of Eli Lilly. Work to include HVAC modifications and electrical work to support the system.
Boston’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
4 permits issued Mar 14 – Jul 20, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#ALT1863768 Long Form/Alteration Permit · FSTTRK Modifications to the existing Level 12 Conference Room (1267) to include demolition of existing ceilings, minor rework of OH MEPs and new finishes to convert space into 2 new offices (1267A & 1267B). Work includes modifications to the fire sprinkler to add an additional head to a phone and… Status: Closed | Not published | $186K |
Commercial and multifamily, biggest first.
#A1807788 Amendment to a Long Form · EXTREN Adding "exterior work” back from sheets D1.1b, A1.0b, A1.1b, A1.2b, A2.1b, A2.2b, A11.14, A12.1b, A12.3b, A12.3e for fencing, seating, heaters, lighting,. This work was originally omitted while determining an RDA was NOT needed by BOSCONCOM. The cost is reflected on ALT1750877 Status: Open | Not published | — |
#SF1701709 Short Form Bldg Permit · INTREN Replacement of existing fume hood on the 6th floor of Eli Lilly. Work to include HVAC modifications and electrical work to support the system. Status: Closed | Not published | $370K |
#ALT1696011 Long Form/Alteration Permit · FSTTRK Interior modification to a portion of the 8th floor , approximately 4300 sq ft to accommodate new layout of office space. Work to include, selective demo, drywall, MEP and fire alarm relocation as per plans. Status: Closed | Not published | $215K |