Get ProEvery project in every city · from $79/mo
Get Procommercial project · Baton Rouge, LA
Commercial General Building work permitted November 19, 2024, declaring $259,092 of work.
Completely remove existing roof system down to the existing structural concrete tees, lightweight insulating concrete (LWIC) over metal deck and wood deck. Install a new 2-ply SBS (Styrene-Butadiene-Styrene) roof system over insulation system to the existing wood deck and LWIC over metal deck areas. Install a 3 ply sbs system over the structural Concrete Tee roof section. Insulation shall be tapered where required to provide for roof drainage. 3/14/25 2:05 Heath Hebert w/Nu-works called to remove Plumber-The Second Line and Fowlkes Plumbing will be new plumber. MNGF16203, MP16065- Active w/…
Baton Rouge’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
1 permit issued Nov 19 – Nov 19, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 5 | #165321 Existing Bldg - Remodel Only (C) Completely remove existing roof system down to the existing structural concrete tees, lightweight insulating concrete (LWIC) over metal deck and wood deck. Install a new 2-ply SBS (Styrene-Butadiene-Styrene) roof system over insulation system to the existing wood deck and LWIC over metal deck… |
Commercial and multifamily, biggest first.
| Not published |
| $259K |