Get ProEvery project in every city · from $79/mo
Get Procommercial project · Baltimore, MD
Commercial Electrical work permitted January 2, 2025, with 3 permits through January 14, 2025, declaring $33,804 of work.
Get new commercial permits in Baltimore, free weekly email
SARRACINO-736 MCKEWIN: INSTALL (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 80000 BTU FUEL-BURNING EQUIP(FURNACE), (10) # PLUMBING FIXTURES, (1) # ELECTRIC WATER HEATER, (1) 40000 BTU FUEL-BURNING EQUIP, (1) 80000 BTU FUEL-BURNING EQUIP AS PER CODE.
Baltimore’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Jan 2 – Jan 14, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#COM2024-89059 Electrical MCKEWIN: REFINISH 2ND FLOOR BATH, NEW TUB, TOILET, 24" VANITY, SPACED TO CODE, DRYWALL FINISH, TILE TUB SURROUND. NEW CLOSET AND BEDROOM INTERIOR DOORS (6 TOTAL). PATCH AND REPAIR EXISTING DRYWALL. FRAME FRONT AND REAR EXTERIOR WALLS TO ADD INSULATION PER CODE ON ALL FLOORS, DRYWALL FINISH.… | Not published | $10K | |
#COM2024-94745 Electrical MCKEWIN AVE: INSTALL (22) # BRANCH CIRCUITS/FEEDERS , (1) 100 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (50) # FIXTURES/DEVICES AS PER CODE. |
| Not published |
| $10K |
#COM2024-94051 Electrical SARRACINO-736 MCKEWIN: INSTALL (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 80000 BTU FUEL-BURNING EQUIP(FURNACE), (10) # PLUMBING FIXTURES, (1) # ELECTRIC WATER HEATER, (1) 40000 BTU FUEL-BURNING EQUIP, (1) 80000 BTU FUEL-BURNING EQUIP AS PER CODE. | Not published | $23.8K |