Get ProEvery project in every city · from $79/mo
Get Procommercial project · Baltimore, MD
Commercial General Building, Hvac/Mechanical, Plumbing work permitted November 25, 2024, with 3 permits through November 26, 2024.
Get new commercial permits in Baltimore, free weekly email
Extend Original Permit.(original permit:COM2024-66510:SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INSTALL NEW DRYWALL. INSTALL FLOORING THROUGH OUT THE HOME. INSTALL NEW CABINETS AND VANITY CABINETS. INSTALL NEW COUNTERTOPS. INSTALL NEW BATHROOM ON 2ND FLOOR (TO CREATE NEW PARTITION WALLS AND FINISHES). RENOVATE HOUSE, ALL WORK WILL BE DONE PER SUBMITTED PLANS AND BALTIMORE CITY CODE. SEPARATES MEPS WILL BE PULLED.) Original Permit Description:(COM2024-66510) SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INSTALL NEW DRYWALL. INSTALL FLOORING THROUGH OUT THE HOME. INSTALL NEW CABINETS…
Baltimore’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Nov 25 – Nov 26, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#COM2024-90312 Building |
Extend Original Permit.(original permit:COM2024-66510:SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INSTALL NEW DRYWALL. INSTALL FLOORING THROUGH OUT THE HOME. INSTALL NEW CABINETS AND VANITY CABINETS. INSTALL NEW COUNTERTOPS. INSTALL NEW BATHROOM ON 2ND FLOOR (TO CREATE NEW PARTITION WALLS AND…
| Not published |
| — |
#COM2024-90324 HVAC / Mechanical Extend Original Permit.(original permit:COM2024-67634:INSTALL (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (4) CFM EXHAUST SYSTEMS , (1) 60000 BTU FUEL-BURNING EQUIP(FURNACE), (1) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 36000 BTU AIR-CON SYSTEM, HEAT PUMP AS PER CODE.) Original Permit… | Not published | — |
#COM2024-90331 Plumbing Extend Original Permit.(original permit:COM2024-68044:INSTALL (18) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # GAS TEST, (1) 35000 BTU FUEL-BURNING EQUIP, (1) 25000 BTU FUEL-BURNING EQUIP, (1) 50000 BTU FUEL-BURNING EQUIP, (1)… | Not published | — |