Get ProEvery project in every city · from $79/mo
Get Procommercial project · Baltimore, MD
Commercial General Building, Electrical, Hvac/Mechanical work permitted November 19, 2024, with 5 permits through December 23, 2024, declaring $42,950 of work.
Get new commercial permits in Baltimore, free weekly email
W 28TH: REPLACE 2 ENTRANCE DOORS (SAME SIZE LOCATION), REPLACE 8 WINDOWS (SAME SIZE & LOCATION), ADD FULL BATH, ADD 1/2 BATH, NEW CABINETS, NEW FLOORING PAINT THROUGHOUT. AS PER PLANS AND AS PER CODE.
Baltimore’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
5 permits issued Nov 19 – Dec 23, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#COM2024-93533 HVAC / Mechanical 28TH ST: INSTALL (1) 24 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 60 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. |
| $11.8K |
#COM2024-91443 Other 402 W 28TH ST. (ATE): INSTALL (46) # FIXTURES/DEVICES, (42) # BRANCH CIRCUITS/FEEDERS AS PER CODE. | Not published | $4.8K |
#COM2024-89605 Electrical 402 W 28TH ST. (!TE): INSTALL (1) 100 AMPS ELECTRIC SERVICE (<=600V) AS PER CODE. | Not published | $1.2K |
#COM2024-89665 Electrical JEFF W28TH STREET: INSTALL (1) # ELECTRIC WATER HEATER, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (7) # PLUMBING FIXTURES, (1) 75000 BTU FUEL-BURNING EQUIP, (1) 35000 BTU FUEL-BURNING EQUIP, (1) 100000 BTU GAS PIPEING, (1) 75000 BTU FUEL-BURNING EQUIP,… | Not published | $7.2K |
#COM2024-86169 Building W 28TH: REPLACE 2 ENTRANCE DOORS (SAME SIZE LOCATION), REPLACE 8 WINDOWS (SAME SIZE & LOCATION), ADD FULL BATH, ADD 1/2 BATH, NEW CABINETS, NEW FLOORING PAINT THROUGHOUT. AS PER PLANS AND AS PER CODE. | Not published | $18K |