Get Procommercial project · Baltimore, MD
Commercial Elevator work permitted October 8, 2025, declaring $210,000 of work.
GIC Elevator: Install a 3 stop elevator in existing shaft, underpin shaft pit to accommodate 5 ft pit depth below finish floor of 1st stop. Install hoist beam at top of the shaft 12’5” above finish floor. On the 3rd stop. Install sump pump pit with oil separator. Reconfigure door opening at each stop to accommodate elevator door openings
Baltimore’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
1 permit issued Oct 8 – Oct 8, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BCCM-25-000272 Elevator GIC Elevator: Install a 3 stop elevator in existing shaft, underpin shaft pit to accommodate 5 ft pit depth below finish floor of 1st stop. Install hoist beam at top of the shaft 12’5” above finish floor. On the 3rd stop. Install sump pump pit with oil separator. Reconfigure door opening at each… | Not published | $210K |
Source: building permit records from Baltimore's open-data portal, checked daily. Data through . How we count