Get ProEvery project in every city · from $79/mo
Get Procommercial project · Baltimore, MD
Commercial Mep work permitted December 26, 2024, declaring $25,000 of work.
Get new commercial permits in Baltimore, free weekly email
H490: INSTALL (14) # BRANCH CIRCUITS/FEEDERS AS PER CODE. PER PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 10 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 22 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (12 FT ABOVE NATURAL GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.
Baltimore’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
1 permit issued Dec 26 – Dec 26, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#COM2024-90876 MEP H490: INSTALL (14) # BRANCH CIRCUITS/FEEDERS AS PER CODE. PER PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 10 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 22 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (12 FT ABOVE NATURAL… | Not published | $25K |