Commercial General Building work permitted November 26, 2024.
Get new commercial permits in Baltimore, free weekly email
Extend Original Permit.(original permit:COM2024-61291:FRAME OUT EXTERIOR NON STRUCTURAL WALLS ON 1ST FLOOR AND BASEMENT. INSTALL FLOOR JOISTS ON 1ST FLOOR DUE TO WATER DAMAGE, INSTALL NEW STEPS TO BASEMENT AND TO 2ND FLOOR (SEE DRAWINGS FOR FRAMING SPECS). INTALL 10 NEW DOORS SAME SIZE/LOCATION, INSTALL 12 WINDOWS SAME SIZE/LOCATION. INSTALL 2 EXTERIOR DOORS SAME SIZE/LOCATION. INSTALL R15 INSULATION ON PERIMETER WALLS AT BASEMENT. INSTALL EST. 210 SHEETS OF 1/2 INCH DRYWALL IN COMMAND AREAS AND 30 SHEETS OF 1/2 MOLD-MILDEW DRYWALL IN ALL WET AREAS. INSTALLED EST. 450 LINEAR FT OF BASEBOARD…
Baltimore’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
1 permit issued Nov 26 – Nov 26, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#COM2024-89742 Building Extend Original Permit.(original permit:COM2024-61291:FRAME OUT EXTERIOR NON STRUCTURAL WALLS ON 1ST FLOOR AND BASEMENT. INSTALL FLOOR JOISTS ON 1ST FLOOR DUE TO WATER DAMAGE, INSTALL NEW STEPS TO BASEMENT AND TO 2ND FLOOR (SEE DRAWINGS FOR FRAMING SPECS). INTALL 10 NEW DOORS SAME SIZE/LOCATION,… |
| Not published |
| — |