Commercial General Building, Sign work permitted August 22, 2025, with 2 permits through October 27, 2025, declaring $53,500 of work.
Patterson Park-402 S Linwood Ave. EV Stations: Installation of new, furnished by BGE- 400A, 1PH, 120/240V, Milbank Station with internal 400AMCB,120/240V, 1PH, 14KAIC, (6) 2P60ACB's for (3) Dual Port, Level 2, 11.52KW, Charger Stations. Direct bore from BGE existing Utility transformer area to new Milbank, from Milbank to (3) Linwood Ave Sidewalk for (3) Furnished by BGE-Charger Stations. Install all grounding and bonding at Milbank per NEC. Install all new copper wiring from Milbank to new Dual Port Charger Stations. BGE WO#18588648
Baltimore’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
2 permits issued Aug 22 – Oct 27, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BCCM-25-002447 Building Patterson Park-402 S Linwood Ave. EV Stations: Installation of new, furnished by BGE- 400A, 1PH, 120/240V, Milbank Station with internal 400AMCB,120/240V, 1PH, 14KAIC, (6) 2P60ACB's for (3) Dual Port, Level 2, 11.52KW, Charger Stations. Direct bore from BGE existing Utility transformer area to new… |
| Not published |
| $46K |
#BCCM-25-000962 Signs Friends Of Patterson Park: Scope of Work: Exterior Alterations to include: Sign Installation, Install 8 non-illuminated wall signs: Sign A: 0'-5"x0'-7", Sign B & C: 0'-10"X0'-7", Sign D: 1'-8"X4'-3", Sign E: 3'-3"x8'-3 1/4", Sign F: 0'-8"x0-11 1/2", Sign G: 0'-3"x3'-7 1/2", Sign H: 0'-7"x0'-10",… | Not published | $7.5K |