Get ProEvery project in every city · from $79/mo
Get Procommercial project · Austin, TX
Commercial Electrical, Hvac/Mechanical, Plumbing work permitted June 16, 2026, with 3 permits through June 17, 2026, declaring $950,000 of work. Contractor on record: 5F Mechanical Co..
Get new commercial permits near 78719 or Austin, free weekly email
Construction of structural towers attached to main terminal building stairwells and light poles to allow camera installation for Virtual Ramp Control System. Work proposed in electrical rooms IT rooms etc. with new conduits/circuits (power and signal) being run from those rooms. Mechanical work proposes installation of compressor systems that go with the camera houses. These are dedicated systems that SAAB maintains and do not connect to any HVAC or other airport mechanical systems. Infrastructure (electrical =mechanical) for powering and maintaining camera systems. [Airside Permits]
Austin permit records name 5F Mechanical Co. and Prism Electric Inc as the contractors on this project.
3 permits issued Jun 16 – Jun 17, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
| applied Mar 30 | #2026-066212 PP Plumbing Permit · Remodel Construction of structural towers attached to main terminal building stairwells and light poles to allow camera installation for Virtual Ramp Control System. Work proposed in electrical rooms IT rooms etc. with new conduits/circuits (power and signal) being run from those rooms. Mechanical work… Status: Final | 5F Mechanical Co. | — |
| applied Mar 30 | #2026-066212 MP Mechanical Permit · Remodel Construction of structural towers attached to main terminal building stairwells and light poles to allow camera installation for Virtual Ramp Control System. Work proposed in electrical rooms IT rooms etc. with new conduits/circuits (power and signal) being run from those rooms. Mechanical work… Status: Final | 5F Mechanical Co. | — |
| applied Mar 30 | #2026-066212 EP Electrical Permit · Remodel Construction of structural towers attached to main terminal building stairwells and light poles to allow camera installation for Virtual Ramp Control System. Work proposed in electrical rooms IT rooms etc. with new conduits/circuits (power and signal) being run from those rooms. Mechanical work… Status: Active | Prism Electric Inc | $950K |
In Austin, biggest first.