Get ProEvery project in every city · from $79/mo
Get Procommercial project · Austin, TX
Commercial Electrical work permitted March 19, 2026, declaring $50,000 of work. Contractor on record: Miller Electric Company.
Addition of a Manual Transfer Switch to the building after the main service disconnect to provide capabilities to connect a TEMPORARY towable generator when needed during outages. The Manual Transfer Switch is equipped with an interlock mechanism that prevent utility and/or generator power to back feed each other.
Austin permit records name Miller Electric Company as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
1 permit issued Mar 19 – Mar 19, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 25 | #2025-107463 EP Electrical Permit · Upgrade Addition of a Manual Transfer Switch to the building after the main service disconnect to provide capabilities to connect a TEMPORARY towable generator when needed during outages. The Manual Transfer Switch is equipped with an interlock mechanism that prevent utility and/or generator power to back… |
Commercial and multifamily, biggest first.
Status: Final
| Miller Electric Company |
| $50K |
In Austin, biggest first.