Get ProEvery project in every city · from $79/mo
Get Procommercial project · Austin, TX
Commercial Electrical work permitted July 13, 2026. Contractor on record: Mid-West Electric.
Tesla proposing to add EV charging to existing parking. Includes the installation of 3 PSU which include 3 cabinets 24 charging posts 6 luminaires 1 Tesla site controller 1 switchboard assembly 1 utility transformer 1 meter 277/480v 4000amp service metered at the transformer.
Austin permit records name Mid-West Electric as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
1 permit issued Jul 13 – Jul 13, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Feb 24 | #2026-034912 EP Electrical Permit · New Tesla proposing to add EV charging to existing parking. Includes the installation of 3 PSU which include 3 cabinets 24 charging posts 6 luminaires 1 Tesla site controller 1 switchboard assembly 1 utility transformer 1 meter 277/480v 4000amp service metered at the transformer. |
Commercial and multifamily, biggest first.
Status: Final
| Mid-West Electric |
| — |