Commercial General Building, Fire Protection work permitted December 18, 2024, with 7 permits through March 10, 2026, declaring $619,000 of work.
Get new commercial permits in Arlington, free weekly email
INFS TO INCLUDE M.E.P. 2021 iCodes/ 2020 NEC *The following will require separate permits: Signs, Menu Boards, Certificate of Occupancy, Fire Alarm, Fire Suppression, Access Control/Panic Hardware.
Arlington’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
7 permits issued Dec 18 – Mar 10, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jan 23 | #SI-26-005710 SI · New Per Building Official (Rick Ripley), CO renewal, change, or remodeling of Suite A and Suite B, numerical suite numbers will be given. Suite B will become Suite 100 and Suite A will become Suite 120. This follows the proper addressing scheme for City of Arlington. Please see attached site plan.… Status: Finaled | Not published |
| $6.5K |
| applied Jan 23 | #SI-26-005709 SI · New Per Building Official (Rick Ripley), CO renewal, change, or remodeling of Suite A and Suite B, numerical suite numbers will be given. Suite B will become Suite 100 and Suite A will become Suite 120. This follows the proper addressing scheme for City of Arlington. Please see attached site plan.… Status: Finaled | Not published | $9.5K |
| applied Dec 31 | #CP-25-109408 CP · Interior Finish Interior finish - to include MEPs (A-3) REV01 - Modifications to reception layout 2021 I Codes / 2020 NEC Fire alarms/sprinklers/locking systems, signage, racking, retaining walls, paint booths, generators, fences, pools, irrigation, and certificate of occupancy through separate permit. SUITE C… Status: Finaled | Not published | $45K |
| applied Mar 7 | #CP-25-019710 CP · Remodel/Alterations/Repairs RMDL-CREATING WHITE BOX/SPEC SUITE TO INCLUDE ELECTRICAL AND PLUMBING ONLY. 2021 iCodes/ 2020 NEC *The following will require separate permits: Fire Alarm, Access Control/Panic Hardware, Fire Sprinkler, Tenant Improvements/Interior Finish Out, Signs and Certificate of Occupancy.* Status: Finaled | Not published | $47K |
| applied Mar 26 | #SI-25-025148 SI · New Per Building Official (Rick Ripley), CO renewal, change, or remodeling of Suite A and Suite B, numerical suite numbers will be given. Suite B will become Suite 100 and Suite A will become Suite 120. This follows the proper addressing scheme for City of Arlington. Please see attached site plan.… Status: Finaled | Not published | $3K |
| applied Sep 11 | #CP-24-098309 CP · Remodel/Alterations/Repairs INFS TO INCLUDE M.E.P. 2021 iCodes/ 2020 NEC *The following will require separate permits: Signs, Menu Boards, Certificate of Occupancy, Fire Alarm, Fire Suppression, Access Control/Panic Hardware. Status: Finaled | Not published | $500K |
| applied Dec 11 | #SI-24-128278 SI · New Per Building Official (Rick Ripley), CO renewal, change, or remodeling of Suite A and Suite B, numerical suite numbers will be given. Suite B will become Suite 100 and Suite A will become Suite 120. This follows the proper addressing scheme for City of Arlington. Please see attached site plan.… Status: Finaled | Not published | $8K |