New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 963 of 1243
- 43 West 24 Street ManhattanInterior renovation of existing eating and drinking establishment, demolition and erection of non-load bearing partition walls, painting, finishes, and flooring work. No change…commercialBuilding, Plumbing· Delux Construction USA Co$150KApr 3
- 149 East 36 Street ManhattanProposed Interior Demolition and Renovation of Existing Duplex Apartment# 1 with Minor Exterior Work.multifamilyBuilding, HVAC / Mechanical, Plumbing· Wise Aire Mechanical Inc$239KOct 14
- 979 3 Avenue ManhattanInterior renovations to the existing spacecommercialBuilding· G&A Contracting LLC$280KMar 31
- 115 West 73 Street ManhattanRENOVATION OF EXISITNG APARTMENT 5D. INTERIOR DEMO AND INSTALLATIOIN OF PARTITIONS WITH FLOOR, WALL AND FINISHES. NO CHANGE OF USE, EGRESS OR OCCPANCY UNDER THIS APPLICATIONmultifamilyBuilding· NY Best Painting Corp$118KMar 31
- 1000 3 Avenue ManhattanInterior remodel of an existing department store. This remodel does not affect the existing building structure, egress requirements or occupant loads.commercialBuilding· J. Phelan Construction Co$1.2MMar 31
- 1325 5 Avenue ManhattanObtain DOB approval for an interior renovation of an existing restaurant. The scope of work is general construction. No change in use, egress, or occupancy.multifamilyBuilding· Calibre Group Inc$159KMar 31
- 390 Riverside Drive ManhattanHerewith file plans to renovate Apt. 15FG. Minot removal and construction of partitions & finishes. No change to use egress of occupancy.multifamilyHVAC / Mechanical· Cortlandt Contracting Cor$102KMar 31
- 560 Lexington Avenue ManhattanINSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.commercial· New Roc Contracting Corp—Mar 31
- 20 Hudson Yards ManhattanStructural modifications as per plans filed herewith. No change to use, egress, or occupancy.commercialBuilding· JRM Construction MGMT LLC$56.4KMar 31
- 20 Hudson Yards ManhattanMechanical demolition and renovations / modifications to existing ductwork as per plans filed herewith. No change to use, egress, or occupancy.commercialHVAC / Mechanical· JRM Construction MGMT LLC$130KMar 31
- 20 Hudson Yards ManhattanDemolition and interior renovations / modifications as per plans filed herewith. No change to use, egress or occupancy.commercialBuilding· JRM Construction MGMT LLC$971KMar 31
- 1250 Broadway ManhattanAT 33RD FLOOR TENANT SPACE AND PUBLIC BATHROOMS, Remove and Replace Plumbing fixtures as per plans filed herewith. No change to use, occupancy, or egress.commercialPlumbing· A&A Plumbing Corp$50KMar 31
- 14 Elizabeth Street ManhattanFIT OUT OF AN OFFICE SPACE ON THE 2ND FLOOR. NO CHANGE OF USE, OCCUPANCY, EGRESS OR ZONING IN THIS APPLICATION.commercialBuilding, Fire protection, Plumbing· K & I Contracting LLC$265KJul 15
- 125 Park Avenue ManhattanStructural modification to provide new catwalk support to service existing heat exchanger at main Roof. No change in use, egress or occupancy.commercialBuilding· Crossland Mechanical Inc$80KMar 31
- 50 East 79 Street ManhattanGENERAL CONSTRUCTION WORK TO RENOVATE APARTMENT 21B ON THE PENTHOUSE LEVEL. CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical, Plumbing· Capital Craftsmen, Inc$698KAug 18
- 451 Broome Street ManhattanHEREBY FILING FOR THE INTERIOR RENOVATION OF APARTMENT 12E LOCATED ON THE BUILDINGS 13TH FLOOR . NO CHANGE TO USE OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· Procore Mechanical Corp$100KMar 31
- 14 East 75 Street ManhattanRenovation of apartment 2A on the 2nd Floor. General construction and plumbing work types. No change in use, egress, or occupancy.multifamilyBuilding, Plumbing· Doma Inc$129KApr 10
- 272 Manhattan Avenue ManhattanFacade repairs as per plans; no change to use, egress, or occupancy.multifamilyBuilding· Safetech Enterprises Corp$82.5KMar 31
- 955 Lexington Avenue ManhattanDEMOLITION AND CONSTRUCTION OF PARTITIONS, REPLACEMENT OF WINDOWS AND RENOVATION OF KITCHEN AND BATHROOMS IN EXISTING APARTMENT #8C. PLUMBING WORK IS FILED SEPARATELY UNDER A…multifamilyBuilding, Plumbing· Mccormack Contracting Inc$264KApr 7
- 344 West 72 Street ManhattanAPARTMENT RENOVATION ON THE 2ND FLOOR IN UNIT 203 AS PER PLANS FILED HEREWITH. WORK INCLUDES REMOVAL AND INSTALLTION OF INTERIOR PARTITIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· Mkon Construction Inc$31KMar 31
- 117 Bank Street ManhattanHEREBY FILING INTERIOR RENOVATION TO UNIT 2A ON THE 3RD FLOOR AS PER PLANS.multifamilyBuilding, Plumbing· New Bridge Contracting In$43.5KApr 21
- 55 Water Street ManhattanMinor structural repair and modification on 53rd floor (roof level framing) as indicated on attached plans.commercialBuilding· John Gallin & Son, Inc$100KMar 31
- 119 Fulton Street ManhattanPROPOSED FACADE REPAIR AS PER PLAN. NO CHANGE IN USE, EGREE AND OCCUPANCY.multifamilyBuilding· Pharaohs Restoration$250KApr 23
- 222 Avenue B ManhattanINSTALL KITCHEN HOOD EXHAUST FAN AND ASSOCIATED DUCTWORK; INSTALL KITCHEN HOOD MAKEUP AIR UNIT AND ASSOCIATED DUCTWORK; INSTALL SPLIT AC SYSTEM FOR BAR AREA AND DINING AREAmultifamilyHVAC / Mechanical· Envy NY II Corp$32KMar 31
- 318 Lafayette Street ManhattanFILING FOR FACADE REPAIR FOR FLOORS 001-005 AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.commercialBuilding· Viking Restoration Svce$600KMar 31
- 252 West 29 Street ManhattanMECHANICAL WORK FOR NEW HVAC SYSTEM TO INCLUDE BUT NOT LIMITED TO NEW CONDESING UNITS AND ASSOCIATED PIPING.commercialHVAC / Mechanical· Bradley Mechanical Corp$75KMar 31
- 315 East 65 Street ManhattanFiling for proposed facade repair work as shown on plans filed herewith. No changes to egress, occupancy or use as of right.multifamilyBuilding· SHR Group Inc$1MMar 31
- 714 Lexington Avenue ManhattanNON ILLUMINATED NON ADVERTISING DOUBLE FACED PROJECTING ACCESSORY SIGN - Pollo CAMPERO. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.commercialSigns· Five Town Neon Sign Co In—Mar 31
- 179 Henry Street ManhattanFiling herewith Alteration Type one to change the use on the 2nd floor as per plans.multifamilyBuilding· Qwest Contracting Corp$1.9MApr 3
- 3959 Broadway ManhattanCHNY CENTRAL SP: SPRINKLER MODIFICATIONS THROUGHOUT THE EXISTING BABIES HOSPITAL CENTRAL BUILDING AS INDICATED ON PLANS FILED HEREWITH.commercialFire protection· Rael Automatic SPR.Co Inc$1.2MMar 31
- 3975 Broadway ManhattanCHNY NORTH SP: SPRINKLER MODIFICATIONS THROUGOUT THE EXISTING CHNY NORTH BUILDING AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCYcommercialFire protection· Rael Automatic SPR.Co Inc$1.5MMar 31
- 232 East 84 Street ManhattanPROPOSE SPRINKLER WORKS AS PER PLAN IN CONJUNCTION WITH ARCHITECTURAL DESIGN UNDER A1 APPLICATION DOBNOW# M00735916-I1.multifamilyFire protection· RRP Plumbing Corp$76KMar 31
- 625 New York Avenue BrooklynSprinkler application filed subsequently with the NB application.multifamilyBuilding, Fire protection· A M B Mechanical Inc—Jul 15
- 1101 President Street BrooklynINDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONSmultifamily· Central Construction MGMT—Mar 31
- 250 Union Avenue BrooklynMINOR RENOVATION OF (8) APT UNITS AND COMMON HALLWAY FROM CELLAR TO ROOF, INCLUDE FINISH WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCYmultifamilyBuilding· Badger Management Inc$160KMar 31
- 423 Amber Street BrooklynInstallation of solar system on the roof as per plan. No change in use, egress or occupancymultifamilySolar· Trinity Solar LLC$36.1KMar 31
- 648 74 Street BrooklynRENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN…multifamilyPlumbing· Tri State PLBG & HTG Inc$60KMar 31
- 902 Drew Street BrooklynGeneral Construction for repair of Fire Damage to apartment #8 at 1st floor. No change in Use Egress or Occupancy under this applicationmultifamilyBuilding· Franchise Interior Develo$44KMar 31
- 466 Bergen Street BrooklynGENERAL CONSTRUCTION TO RENOVATE EXISTING TRIPLEX APT #2 ON THE CELLAR, 1ST-2ND FLOORS. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE,…multifamilyBuilding, Plumbing· Watson's PLBG, HTG, & BDG$105KMar 31
- 458 Bergen Street BrooklynGENERAL CONSTRUCTION TO RENOVATE APT 3 ON THE 3RD FLOOR. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS…multifamilyBuilding, Plumbing· Watson's PLBG, HTG, & BDG$55KMar 31
- 20 Jay Street BrooklynInstallation of temporary shoring at the garage interiorcommercialBuilding· Mid-State Construction C$25KMar 31
- 1016 East 13 Street BrooklynApplication hereby proposing new non bearing partitions new interior doors and modification of existing mechanical system in an existing Day Care Use Group 4 as per NB 302056343…multifamilyHVAC / Mechanical· Rmac Construction Corp$101KMar 31
- 75 Poplar Street BrooklynINTERIOR RENOVATION OF EXISTING APARTMENT 1H AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCYmultifamilyBuilding· Babo Construction Inc$144KMar 31
- 890 Erskine Street BrooklynInstallation of 97.555 kw solar energy system on roof. no change of occupancy, use or egress.multifamilySolar· Accord Power Inc$399KMar 31
- 186 Flushing Avenue BrooklynApplication is filed to document change in metes & bounds of property containing an existing building. Refer to subdivision application #322114207. No work to be performed under…commercialBuilding· marc agger—Mar 31
- 1492 Bedford Avenue BrooklynREPLACE GAS-FIRED DIRECT VENT BOILER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.multifamilyHVAC / Mechanical, Plumbing· Vigilante Contracting Co$32.9KApr 1
- 8506 Ditmas Avenue BrooklynReplacement of ceiling diffusers and return registers from 1st to 3rd floors as per plans. No change in use, egress, or occupancy.commercialHVAC / Mechanical· Vericon Construction Co$121KMar 31
- 151 North 7 Street BrooklynInterior renovation of existing retail space on the first floor.multifamilyBuilding, Plumbing· K&S Home Deco Inc$50KApr 4
- 11 Stanwix Street BrooklynAlteration of existing commercial space including installation of partitions, cooking equipment ,and mechanical systems.multifamilyHVAC / Mechanical, Plumbing· Blessed Hands Home Improv$243KApr 3
- 80 Winthrop Street BrooklynFull replacement of domestic gas piping for residential cooking appliances. No change in use, egress or occupancy.multifamilyBuilding, Plumbing· Go Pro Plumbing And Heati$462KMar 31