62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 944 of 1243
- 79-10 34 Avenue QueensInstallation of suspended scaffold for facade work or inspectionmultifamily· MNR Group Inc—Apr 9
- 101-16 Queens Boulevard QueensAPPLICATION FILED TO INSTALL SINGLE-PACKAGE ROOFTOP UNIT AND ASSOCIATED DUCTWORK. NOCHANGE IN FLOOR AREA, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.commercialHVAC / Mechanical· Dirno Corporation$25KApr 9
- 162-01 Sanford Avenue QueensRENOVATION OF EXISTING COMMERCIAL SPACE ON 1ST FLOOR. INSTALL NEW FLOOR & WALL FINISHES. INSTALL NEW CEILING AND LIGHTING FIXTURES. INSTALL NEW PLUMBING FIXTURES AND COOKING…commercialHVAC / Mechanical· NY Building Associates In$83.6KApr 9
- 142-05 Roosevelt Avenue QueensLEGALIZATION TO REFLECT RENOVATION OF AN EXISTING CLASS A APARTMENT PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.multifamilyBuilding· Germiniano Mendes Corp—Apr 9
- 72-10 41 Avenue QueensFACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· Millenium Restoration Cor$213KApr 21
- 31-63 30 Street QueensTO PROPOSE PLUMBING WORK FOR EX. 3 FAMILY DWELLING AT BAS, 001 & 002 FL IN CONJUNCTION WITH GC WORK TYPE Q01187037-I1 AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR…multifamilyPlumbing· XH&RC PLBG And HTG Inc$78KApr 9
- 29-01 216 Street QueensREGISTER BOILER AND OIL BURNER TO OBTAIN INSPECTIONS AND SIGN-OFF.commercialHVAC / Mechanical, Plumbing· Abilene, Inc$25KApr 9
- 12-16 43 Avenue QueensModifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.commercialHVAC / Mechanical· Il Gatto Morto Inc$1.1MApr 9
- 34-55 12 Street QueensInstallation of 41.42 kw solar energy system on roof. No change of occupancy, use or egressmultifamilySolar· Accord Power Inc$124KApr 9
- 12-21 35 Avenue QueensInstallation of 80.66 kw solar energy system on roof. No change of occupancy, use or egressmultifamilySolar· Accord Power Inc$242KApr 9
- 35-53 12 Street QueensInstallation of 40.875 kw solar energy system on roof. No change of occupancy, use or egressmultifamilySolar· Accord Power Inc$123KApr 9
- 12-15 36 Avenue QueensInstallation of 80.115 kw solar energy system on roof. No change of occupancy, use or egressmultifamilySolar· Accord Power Inc$240KApr 9
- 35-36 24 Street QueensInstallation of 80.66 kw solar energy system on roof. No change occupancy, use or egressmultifamilySolar· Accord Power Inc$242KApr 9
- 35-20 24 Street QueensInstallation of 45.235 kw solar energy system on roof. No change of occupancy, use or egressmultifamilySolar· Accord Power Inc$136KApr 9
- 35-06 24 Street QueensInstallation of 40.33 kw solar energy system on roof. No change of occupancy, use or egressmultifamilySolar· Accord Power Inc$121KApr 9
- 21-40 35 Avenue QueensInstallation of 39.785 kw solar energy system on roof. No change occupancy, use or egressmultifamilySolar· Accord Power Inc$119KApr 9
- 34-34 24 Street QueensInstallation of 81.75 kw solar energy system on roof. No change of occupancy, use or egressmultifamilySolar· Accord Power Inc$245KApr 9
- 34-04 24 Street QueensInstallation of 41.42 kw solar energy system on roof. No change of occupancy, use or egressmultifamilySolar· Accord Power Inc$124KApr 9
- 23-02 34 Avenue QueensInstallation of 83.385 kw solar energy system on roof. No change of occupancy, use or egress.multifamilySolar· Accord Power Inc$250KApr 9
- 21-20 34 Avenue QueensInstallation of 42.51 kw solar energy system on roof. No change of occupancy, use or egress.multifamilySolar· Accord Power Inc$128KApr 9
- 34-03 21 Street QueensInstallation of 70.85 kw solar energy system on roof. No change of occupancy, use or egress.multifamilySolar· Accord Power Inc$213KApr 9
- 28-90 Review Avenue QueensINSTALLTION OF 2 POINT SUSPENDED SCAFFOLD IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.commercialBuilding· Bunlin LLC—Apr 9
- 33-05 Broadway QueensEXISTING CELLAR LAYOUT FILED IN CONJUNCTION WITH AUDITED APPLICATION #402483291multifamilyBuilding· Aag Home Impr Inc—Apr 9
- 170-03 Jamaica Avenue QueensApplication is filed for interior renovation at existing restaurant as per plan. No change in use, egress or occupency.commercialBuilding· PLBG Mechanical And Pipin$145KApr 9
- 35-36 80 Street QueensAPPLICATION FILED TO COMPLY WITH TECHNICAL POLICY PROCEDURE AND NOTICE 3/97 TO COMBINE APARTMENTS 21 AND 31 NOT REQUIRING A NEW CERTIFICATE OF OCCUPANCY. INTERIOR RENOVATION WORK…multifamilyBuilding, Plumbing· Master Interiors Corp$40KMay 21
- 21-10 Newtown Avenue QueensPROPOSE TO LEGALIZE EXISTING COMMERCIAL SPACE ON THE FIRST FLOOR AS PER JOB NUMBER Q00585340multifamilyBuilding· Remax Construction LLC$100KApr 9
- 142-05 Roosevelt Avenue QueensExterior repairs. No change in use, occupancy, or egress.multifamilyBuilding· Xinos Construction Corp$359KApr 9
- 69-02 51 Avenue QueensPROPOSE A NEW 3 STORY MIX USED BUILDING RETAIL STORE AND 2 FAMILY DWELLING UNITS. OBTAIN NEW C OF O.commercialBuilding, HVAC / Mechanical· L&L Construction Develop—Dec 3
- 59-21 Roosevelt Avenue QueensAPPLICATION HEREWITH FILED TO REMOVE AND ADD PLUMBING FIXTURES. SUBSEQUENT FILING TO ALT 1 Q00908679-I1commercialPlumbing· Tri State PLBG & HTG Inc$197KApr 9
- 107-09 Northern Boulevard QueensUnderpinning work in conjunction with NB of Proposed a Seven (7) story Mixed-use Building under the filing of Q00893255-I1multifamilyBuilding, Fire protection, Plumbing· David Constructing NY, In—Jul 22
- 66-40 Kissena Boulevard Queenssprinkler work for Queens College Central Chiller Plant upgrade asper plans filed herewith. no change in use, egress or occupancycommercialFire protection· I.M.P. PLBG & HTG Corp$35KApr 9
- 525 East 68 Street ManhattanL-4 CARDIOLOGY Phase 3: HVAC MODIFICATIONS TO ACCOMMODATE THE PHASE 3, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS…commercialHVAC / Mechanical· Consigli Construction Co$291KApr 9
- 525 East 68 Street ManhattanL-4 CARDIOLOGY Phase 3: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE PHASE 3, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO…commercialBuilding· Consigli Construction Co$342KApr 9
- 5 Lispenard Street Manhattanapplication is being filed for the removal of interior partitions, per plans submitted herewith. No change in use, egress or occupancy in this application.multifamilyBuilding· Exclusive Carpentry Inc$25.5KApr 9
- 1414 6 Avenue ManhattanInstallation of suspended scaffold for facade work and/or inspection. Amend #2 added outrigger detailcommercial· Skyline Restoration Inc—Apr 9
- 2890 Fredrick Douglass Boulevard ManhattanOUTRIGGER FOR FACADE REPAIR.multifamilyBuilding· NY Landmarks Gen Contr Co—Apr 9
- 4 East 89 Street ManhattanRigging for Industrial Rope Access.multifamily· Cerina General Contr. Inc—Apr 9
- 417 Riverside Drive ManhattanRigging for Industrial Rope Accessmultifamily· Cerina General Contr. Inc—Apr 9
- 20 East 9 Street Manhattanrenovate apt 14F. partition, plumbing, electrical, minor fan coil work, no change to use, exits or occupancymultifamilyBuilding, Plumbing· BCNG Construction Inc$105KApr 17
- 272 West 107 Street ManhattanInterior renovation of apartment unit 7C. Removal of non structural partitions and replacement of kitchen millwork, finishes, and fixtures. No change to use, occupancy or egress.multifamilyBuilding· Vectra Construction Corp$60KApr 9
- 19 Union Square ManhattanMODIFICATION OF EXISTING SPRINKLER SYSTEM. NO CHANGE IN USE EGRESS OR OCCUPANCY PER PLANS FILED HEREIN.commercialFire protection· Anesis Services Corp$30KApr 9
- 19 Union Square ManhattanRENOVATION OF EXISTING COMMERCIAL RESTROOM 3RD FLOOR, WITH NEW PLUMBING FIXTURES. NO CHANGE IN USE EGRESS OR OCCUPANCY PER PLANS FILED HEREIN.commercialPlumbing· Anesis Mechanical Corp$40KApr 9
- 437 Madison Avenue ManhattanInterior renovation modifying office layout as shown in drawings filed herewith. No change in egress, occupancy or use.commercialBuilding, HVAC / Mechanical· Vericon Construction Co$255KApr 14
- 1325 5 Avenue ManhattanFILING HEREWITH APPLICATION FOR PLUMBING WORK TYPE FOR KITCHEN FIXTURE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyPlumbing· NYC Plumbing & Heating In$45KApr 9
- 4 West 40 Street ManhattanInstallation of 2 fire smoke dampers mechanically. No change to use, egress, or occupancycommercialHVAC / Mechanical· L&K Partners, Inc$25KApr 9
- 155 West 66 Street ManhattanDESIGN INCLUDES INSTALLATION OF (3) 5TON HEAT PUMP UNIT WITH THE (16) INDOOR UNIT, (1) GENERAL EXHAUST FAN AND (1) OUTSIDE AIR INTAKE FAN IN THE FIRST FLOOR COMMERCIAL SPACE. NO…commercialBuilding, HVAC / Mechanical, Plumbing· Am Group 2000 Crop$245KSep 2
- 716 10 Avenue ManhattanJOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, INSTALL KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS…multifamilyHVAC / Mechanical, Plumbing· Dyker Solutions Inc$89.2KJun 18
- 129 West 41 Street ManhattanModifications to the existing HVAC System: Extend flue exhaust pipes on the 3rd Floor/ Annex Roof as per plans (Sub-cellar Generator Exhaust Remediation.) No change to use,…commercialHVAC / Mechanical· Ama Design Build LLC$75KApr 9
- 243 West 116 Street ManhattanINSTALLATION OF NEW SHORING SYSTEM TO SATISFY EMERGENCY WORK ORDER, CONTROL NO. 341840.multifamilyBuilding· Alpha Scaffolding Inc$50.8KApr 9
- 382 3 Avenue ManhattanInstallation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.multifamilyBuilding· Am&G Waterproofing LLC—Apr 9