New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 823 of 1243
- 307 Victory Boulevard Staten IslandHerewith filing for installation of HVAC system through out building.commercialHVAC / Mechanical· Sken Services Corp$605KJun 18
- 41 Seaver Way QueensInstall temp stage, platforms, trussing, tents.no alt to exist structures for CitiField 2025 Concert Series. TPA permit required each show. Producer responsible to monitor site…commercialBuilding· Winick Productions, LLC$75KJun 18
- 83-44 Lefferts Boulevard QueensOUTRIGGER FOR FACADE REPAIR.multifamilyBuilding· Sha Home Improvement Inc—Jun 18
- 34-15 31 Avenue QueensINSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.multifamily· Central Construction MGMT—Jun 18
- 61-17 Springfield Boulevard QueensProposed interior renovation for commercial space of existing commercial building with new partitions work and floor finishes as per plan. No change in use, egress, or occupancy.commercialBuilding, Plumbing· American Standard P&H Cor$75KJun 20
- 90-30 Metropolitan Avenue Queens8948- Herewith filing for interior renovation , replacement of lighting, & Dunnage as per plans for replacement refrigeration equipment. No change in egress use group or…commercialBuilding, Plumbing· Maccarone Plumbing Inc$1.5MJun 26
- 37-11 Main Street QueensFOOD COURT #1, MINOR PLUMBING WORK AT CELLAR, OT JOB FILED UNDER JOB#421376086, NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialPlumbing· Rockefeller Plmbg & HTG I$60KJun 18
- 65-50 Grand Avenue QueensJOB FILED EXIST. COMMERCIAL STORE INSTALL NEW COOKING EQUIPMENT AND PLUMBING FIXTURE PER PLAN. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.multifamilyBuilding, Plumbing· Mega Mechanical Inc$169KSep 17
- 95-27 Roosevelt Avenue QueensProposed New parttitions on 2nd floor office.commercialBuilding· Complex Development Inc$34KJun 18
- 111-18 Liberty Avenue QueensFACADE RESTORATION AND ROOF REPLACEMENT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.commercialBuilding· Vik XS Services Inc$470KJun 18
- 271-10 Grand Central Parkway QueensCombine two adjacent apartments into one., remove one kitchen, remove and construct non-bearing partitions, new finishes. Work to comply with TPPN 3/97 combining residential…multifamilyBuilding· New Yorker Contractors$180KJun 18
- 97-36 Brisbin Street Queensinstallation of mechanical system for the new proposed building.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· New Area Construction Inc—Aug 6
- 25-56 80 Street QueensPropose to install mechanical equipmemt as per plans filed herewith. No change in use egress or occupancy is proposed under this applicationcommercialHVAC / Mechanical· FPS Contracting Inc$75KJun 18
- 144-03 Northern Boulevard QueensREPLACEMENT OF ROOFTOP UNIT WITH TOTAL CAPACITY OF 7.5 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.commercialHVAC / Mechanical· Afgo Mechanical SVCS Inc$26.3KJun 18
- 218 East 104 Street ManhattanSUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR INSPECTIONmultifamily· D&N Const & Consultng Inc—Jun 18
- 1851 3 Avenue ManhattanSUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR INSPECTIONmultifamily· D&N Const & Consultng Inc—Jun 18
- 230 East 102 Street ManhattanSUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR INSPECTIONmultifamily· D&N Const & Consultng Inc—Jun 18
- 15 Central Park West ManhattanConstruction of a 458 sq. ft. suspended ceiling with 12 downlights at the Living Room. No change to use, egress or occupancy under this application.multifamilyBuilding· Nordic Custom Builders In$50.4KJun 18
- 900 10 Avenue ManhattanInstallation of suspended scaffold for facade work and/or inspection. Amend #1, added scaffold dropcommercial· B&A Restoration Contr.Inc—Jun 18
- 900 Third Avenue ManhattanModifications to the existing HVAC system on the 10th and 14th floors (Carl Marks) as per plans. No change to use, egress or occupancy.commercialHVAC / Mechanical· Icon Interiors Inc$87KJun 18
- 5 West 93 Street ManhattanHEREWITH FILING ARCHITECTURAL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCYcommercialBuilding· Bonaline Construction Co$375KJun 18
- 151 West 34 Street ManhattanNew steel framing elements to support new rolling gatescommercialBuilding· Variant Services Inc$65KJun 18
- 387 Park Avenue South ManhattanOFFICE RENOVATION WORK (CRITEO) WORK TO INCLUDE PARTION, CEILING AND DOOR MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCYcommercialBuilding, Fire protection, HVAC / Mechanical· Icon Interiors Inc$763KJul 1
- 149 East 73 Street ManhattanSuspended Scaffold for Facade Restoration as shown on plansmultifamily· Sky Rise Restoration Inc—Jun 18
- 1200 Amsterdam Avenue ManhattanFacade repairs (FISP)CYCLE 9 as per plans. No change to use, egress or occupancy.commercialBuilding· Henry Restoration LTD$286KJun 18
- 530 5 Avenue Manhattan6fl bathroom-- Mechanical duct and equipment modifications as per plans filed.commercialHVAC / Mechanical· Unity Construction Group$28KJun 18
- 1345 6 Avenue ManhattanGeneral Construction to take place on the first floor as per drawings filed herewith. No change in use, egress, or occupancy.commercialBuilding· James E Fitzgerald Inc$73.7KJun 18
- 1133 6 Avenue ManhattanGeneral construction for office fitout on construction floors 33 & 34 (marketing floors 34 & 35)commercialBuilding· Clune Construction Co LP$660KJun 18
- 80 University Place ManhattanALTERATIONS TO EXISTING GROUND FLOOR COMMERCIAL SPACE TO INCLUDE PARTITION WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESScommercialBuilding, HVAC / Mechanical, Plumbing· 5 Points Rehab LLC$219KJul 21
- 50 Broad Street ManhattanRemove and install new interior partitions and finishes on partial 15th floor in the existing offices as per plans filed herewith only. No change to zoning, egress, use, occupancy.commercialBuilding· Sunrise Contracting Inc.,$142KJun 18
- 10 Rockefeller Plaza ManhattanHereby filing to install electric cooling towers and chillers in new mechanical room as shown on plans filed herewith. No change to use, occupancy or egress.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Structure Tone, LLC$10.3MJul 10
- 225 West 34 Street ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 16TH FLOOR (K-FORCE) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,…commercialBuilding, Fire protection, HVAC / Mechanical· Unisol Inc$340KSep 8
- 1115 5 Avenue ManhattanInstallation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.multifamilyBuilding· Canido Basonas Const. Cor—Jun 18
- 538 West 120 Street ManhattanFacade repairs (FISP)CYCLE 9 as per plans. No change to use, egress or occupancy.commercialBuilding· Hayden BLDG. Maintenance$335KJun 18
- 799 Broadway ManhattanConstruction modifications taking place on the 7th floor as indicated on the drawings.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Icon Interiors Inc$1MAug 25
- 420 5 Avenue ManhattanREPLACEMENT OF 3 WATER COOLED SELF CONTAINED UNITS ON FLOORS 016, 017, AND 018 WITH A TOTAL CAPACITY OF 150 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.commercialHVAC / Mechanical· Afgo Mechanical SVCS Inc$525KJun 18
- 1188 York Avenue ManhattanMODIFICATION TO EXISTING SPRINKLER SYSTEM ON 17TH FLOOR - WEISS BUILDING. NEW SPRINKLER HEADS / BRANCHES / MAIN CONNECTED TO EXISTING BUILDING SPRINKLER RISER AS PER DRAWINGS. NO…commercialFire protection· Devo Fire Protection Inc$58KJun 18
- 1290 6 Avenue ManhattanPROPOSED SPRINKLER MODIFICATIONS TO FIRST FLOOR. NO CHANGE IS USE, EGRESS OR OCCUPANCY.commercialPlumbing· RRP Plumbing Corp$25KJun 18
- 107 Greenwich Street ManhattanOFFICE IMPROVEMENT OF THE ENTIRE 13TH & 14TH FLOORS TO INCLUDES NON-BEARING INTERIOR PARTITIONS, OFFICE GLASS STOREFRONTS, DOORS, FLOOR/WALL FINISHES, CEILING TILES/GRID,…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Americon Construction Inc$2.4MJul 24
- 19 East 88 Street ManhattanREPLACEMENT OF (2) ROOFTOP EXHAUST FANS. NO CHANGE IN EGRESS OR OCCUPANCY.multifamilyBuilding· Ener-Con Technical Servic$38KJun 18
- 425 Park Avenue ManhattanMECHANICAL WORK TAKING PLACE ON THE 27TH CONSTRUCTION FLOOR (33RD MARKETING) AS PER PLANS FILED HEREIN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialHVAC / Mechanical· Sound Refrigeration & Air$330KJun 18
- 820 Park Avenue ManhattanRenovation of an existing apartment penthouse level. Work to include non-structural demolition, general construction and modify window opening as per plans filed herewith. no…multifamilyHVAC / Mechanical· Sohome Work Inc$73.6KJun 18
- 116 West 32 Street ManhattanInstallation of suspended scaffold for facade work or inspection.commercial· Lawrence Exterior Rest Co—Jun 18
- 435 Hudson Street ManhattanFiling for interior renovations in restaurant space on first floor and mezzanines. Work includes installation of interior non-load bearing partitions. No change to use, egress or…commercialBuilding· Certified Of N.Y. Inc$1.1MJun 18
- 136 Baxter Street ManhattanINTERIOR RENOVATION OF RESIDENTIAL UNIT PHA ON THE 6TH FLOOR. REMOVAL OF NON-LOAD BEARING PARTITIONS AND INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS AND INTERIOR DOORS. NO…multifamilyBuilding· Ivan DP Construction LLC$54.6KJun 18
- 477 Madison Avenue ManhattanInterior renovation of 1st floor commercial space. Minor modification to existing storefront. No change to use, egress or occupancycommercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Schimenti Construction Co$660KAug 7
- 65 East 55 Street ManhattanGeneral construction modifications taking place on the 27th floor per plans filed herewith. No change in use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical· Unity Construction Group$187KAug 6
- 1285 Avenue Of The Americas ManhattanPatching and repairing of existing ceilings, core walls and/or gypsum board partitions with firestopping, if required.commercialBuilding· Structure Tone, LLC$49KJun 18
- 356 West 18 Street ManhattanPLUMBING AND SPRINKLER MODIFICATIONS (PHASE 2B) AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPACNY.commercialFire protection, Plumbing· A&A Plumbing Corp$26.3KJul 1
- 343 East 74 Street ManhattanINTERIOR RENOVATION OF EXISTING UNIT# 10F & 10G AT 10TH FLOOR. REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITION WALL AND DOORS TO COMBINE UNIT 10F & 10G AS PER PLAN.multifamilyBuilding, Plumbing· RCGC, LLC$123KJul 16