New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 815 of 1243
- 8501 7 Avenue Brooklynherewith file alt-1 application for vertical enlargement of existing one story building ( NO CHANGE OF USE)commercialBuilding· Mksskr Consulting Service$89KJun 25
- 1500 Ralph Avenue BrooklynSUBSEQUENT APPLICATION FILED FOR PLUMBING WORK IN CONJUNCTION WITH NBcommercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· NYC Plumbing & Heating In—May 28
- 398 Henry Street BrooklynPropose installation of HVAC, mechanical modifications throughout all as per plans herewith filed.multifamilyFire protection, HVAC / Mechanical· Flint Mechanical Corp$119KNov 5
- 193 23 Street BrooklynFoundation work for proposed 3 story & penthouse 3 family dwellingmultifamilyBuilding· Zaim Contractor Corp—Jun 25
- 4170 Wilder Avenue Bronxinstallation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulkmultifamilySolar· Solar Pro Inc$57KJun 24
- 808 Adee Avenue BronxSUSPENDED SCAFFOLD OUTRIGGERSYSTEM AND MATERIALS HOISTSYSTEM FOR ROOF REPAIRS,REPLACEMENT, INSPECTIONS AND FACADE RESTORATION WORKSmultifamilyRoofing· SSD Interior Inc—Jun 24
- 1824 Anthony Avenue BronxApplication for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.multifamily· MC Superstructure Inc—Jun 24
- 22 Metropolitan Oval BronxInstallation of suspended scaffold for facade work or inspectionmultifamily· Pna Contracting Corp—Jun 24
- 1650 Metropolitan Avenue BronxInstallation of suspended scaffold for facade work or inspectionmultifamily· Pna Contracting Corp—Jun 24
- 2132 Chatterton Avenue Bronxremove partitions and doors to eliminate the two illegal apartments in the cellar in their entirety.multifamilyBuilding, Plumbing· Symmetrical Construc Corp$42.2KJul 14
- 1641 Melville Street BronxProposing interior renovations. No change in use, egress, or occupancy.multifamilyBuilding· MJH Construction Corp$216KJun 24
- 777 Mace Avenue BronxPROPOSED EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Apex Group NY Corp$238KJun 24
- 3872 Third Avenue BronxINSTALLATION OF NEW ROOFTOP UNITS AND ASSOCIATED REFRIGERANT PIPING, DUCTWORK, NEW DEDICATED VAV UNITS, NEW EXHAUST FANS AND ASSOCIATED DUCTWORK, LOUVERS, NEW WATER-COOLED FAN…commercialHVAC / Mechanical, Plumbing· HVAC Construction Inc$2.5MJul 13
- 3872 Third Avenue BronxINSTALLATION OF NEW ROOFTOP UNITS AND ASSOCIATED DUCTWORK, CONTROLS AND SPECIALTIES.2. INSTALLATION OF NEW EXHAUST FANS AND ASSOCIATED DUCTWORK, ETC.3. INSTALLATION OF NEW SMOKE…commercialFire protection, HVAC / Mechanical, Plumbing· Bedrock Mechanical Inc$2.2MJun 24
- 3176 Decatur Avenue BronxREPAIR OF DETERIORATED MASONRY CONDITIONS, INCLUDING: BRICK REPLACEMENT, REPOINTING, LINTEL REPLACEMENT, SILL REMOVAL, RESETTING, SEALANT REPLACEMENT LIMITED TO THE EXTERIOR OF…multifamilyBuilding· Apex Group NY Corp$771KJun 24
- 1595 Unionport Road BronxInstallation of suspended scaffold for facade work or inspection.multifamily· Pna Contracting Corp—Jun 24
- 34 Metropolitan Oval BronxInstallation of suspended scaffold for facade work or inspection. Amend #1, added hoistsmultifamily· Pna Contracting Corp—Jun 24
- 55 Westchester Square BronxREMOVAL AND INSTALLATION OF WALLS,DOORS, FLOOR FINISHES AND CEILINGS AS PER PLANS FILED HEREWITH. NO CHANGES TO EGRESS, USE OR OCCUPANCYcommercialBuilding· SJS Construction Co., Inc$140KJun 24
- 3805 Dyre Avenue BronxFILING PLUMBING WORKTYPE FOR OIL TO GAS CONVERSION. REPLACEMENT OF OIL FIRED BOILER WITH GAS FIRED BOILER 722,000 BTU/H AT CELLAR FL. GAS PIPING LINE TO BE UPGRADED AND PROPOSE…multifamilyPlumbing· Samuel & Sons P & H Inc$37.2KJun 24
- 3855 Orloff Avenue BronxFacade repair as shown on plans. No change in use, occupancy or egress.multifamilyBuilding· Abc Madison Builders Inc$334KJun 24
- 2512 Bronx Park East BronxProvide new plumbing, standpipe, and sprinkler system in conjunction with NB# X00916813.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Quality Piping, Inc—Mar 10
- 4329 Victory Boulevard Staten IslandINSTALLATIONS OF FOUNDATION AND STEEL FRAMINGS FOR AN ELECTRICAL CABINET AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY.commercialBuilding· Eberhart Construction Co$2.6MJun 24
- 2800k Victory Boulevard Staten Island2A Elev.: Modification of interior partitions and finishes to accommodate alteration to the existing elevator doors and lobbies as per plans. no change to use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Avid NYC Corp$705KAug 20
- 2800p Victory Boulevard Staten Island1A Elev.: Modification of interior partitions and finishes to accommodate alteration to the existing elevator doors and lobbies as per plans. no change to use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical· Avid NYC Corp$705KAug 20
- 89-03 57 Avenue QueensALL MECHANICAL WORK RELATED TO RENOVATION OF WHITE CASTLEcommercialHVAC / Mechanical· J. Petrocelli Contracting$133KJun 24
- 34-35 74 Street QueensSUSPENDED SCAFFOLD OUTRIGGER SYSTEM WITH MATERIAL HOIST AT 34-35 74TH STREET, QUEENS FOR FACADE RESTORATION WORK. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER…multifamily· J & GS Restoration,Inc—Jun 24
- 85-15 Rockaway Beach Boulevard QueensDIRECT REPLACEMENT OF (2) HVAC UNITS AT ROOF ON EXISTING DUNNAGE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.commercialHVAC / Mechanical· Complete Cooling And Heat$70KJun 24
- 157-48 Cross Bay Boulevard QueensJOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER, NEW FLOOR TILE AND NEW PAINT AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.commercialBuilding· We R Decor Corp$79.5KJun 24
- 31-25 Steinway Street QueensPatching existing EIFS, and providing new base coat and synthetic stucco finish, repair small attachment points from old tenant sign, as well as painting existing exterior doors…commercialBuilding· Phase III Builders Inc$79.6KJun 24
- 125-12 89 Avenue QueensAlteration of existing warehouse building. Construction of new interior partitions for accessory office space and restrooms. Relocation of entrance door and direct replacement of…commercialBuilding, Plumbing· PLBG P & H Inc$209KJul 18
- 4 Dartmouth Street QueensINTERIOR RENOVATIONS TO APARTMENT 412. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.multifamilyBuilding· Tuscana Renovation LLC$78KJun 24
- 177-15 Union Turnpike QueensMINOR INTERIOR RENOVATION. NEW COUNTER AND SOFFIT. NEW TRIM, FLOORING THROUGHOUT. PATCH AND REPAIR THROUGHOUT. ADDRESSING ECB VIOLATIONS 39145274H, 39145316R, 39145279R,…commercialBuilding, Plumbing· SJG Construction Corp$129KJul 25
- 119-49 Union Turnpike QueensDecommission of T-Mobile site on the roof. No change in use, egress or occupancy.multifamilyRoofing· Watch Hill Wireless Solu$50KJun 24
- 33-18 30 Avenue QueensINTERIOR RENOVATION OF PROPOSED FOOD ESTABLISHMENT AND INSTALLATION OF KITCHEN EXHAUST SYSTEM. INSTALLATION OF SPLIT SYSTEM AC UNITS, CHANGE TO STOREFRONT. NO CHANGE IN USE,…multifamilyBuilding, Plumbing· Shane Walters$169KJul 22
- 77-11 35 Avenue QueensExterior repairs. No change in use, occupancy, or egress.multifamilyBuilding· MNR Group Inc$185KJun 24
- 4727 Little Neck Parkway QueensLIMITED EXTERIOR REPAIRS AS INDICATED ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Gurnoor Construction Corp$109KJun 24
- 5 West 86 Street ManhattanIRA FOR ALPHA SECTOR LOCATION INSPECTIONmultifamily· PPM Telecom LLC—Jun 24
- 383 West 125 Street ManhattanINTERIOR RENOVATION OF EXISTING RESIDENTIAL UNIT #2 & UNIT #4. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· John Evan Contracting Cor$96KJun 24
- 52 West 132 Street ManhattanNew interior partitions, fixture replacements, and new ductless Mini-split HVAC systemcommercialBuilding, Plumbing· Farragut Builders II, Inc$280KJul 30
- 1050 Amsterdam Avenue ManhattanInstallation of suspended scaffold for facade inspection/Repair.multifamilyBuilding· Streamline Consultants NY—Jun 24
- 785 Park Avenue ManhattanPartition, finish and fixture work to renovate existing basement. No change to use, egress or occupancy. Filing to supersede previous approved application #M01087684-I1 due to…multifamilyBuilding· Keystone Builders Group$56.3KJun 24
- 305 East 85 Street ManhattanINTERIOR RENOVATION FOR AN EXISTING APARTMENT ,REMOVAL OF NON BEARING PARTITION WALLS .PLUMBING WORK WILL BE FILED UNDER AN LAA ,NO CHANGE OF USE, EGRESS OR OCCUPANCYmultifamilyBuilding, Fire protection· MBQ Contracting Corp$90KSep 17
- 216 East 117 Street ManhattanINSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilySolar· Brooklyn Solarworks LLC$42KJun 24
- 1325 Avenue Of The Americas ManhattanModifications to the existing HVAC system on the 19th and 20th floors (Cole Schotz) as per plans. No change to use, egress or occupancy.commercialHVAC / Mechanical· Gannon Contracting LLC$183KJun 24
- 145 2 Avenue ManhattanInterior renovations consisting of partitions and finishes as per plans filed herewith. No Change to use, egress or occupancymultifamilyBuilding, Plumbing· Andrew Construction Servi$164KJul 8
- 205 East 22 Street ManhattanFILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.multifamily· Maspeth Contracting Corp—Jun 24
- 900 Third Avenue ManhattanMinor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 10th and 14th floors (Carl Marks) as per plans. No change to use, egress or…commercialBuilding· Icon Interiors Inc$180KJun 24
- 810 Seventh Avenue ManhattanInstallation of a new sprinkler system on the 18th floor (Phillips Lytle) as per plans. No change to use, egress or occupancy.commercialFire protection· Full Capacity Fire Corp$45KJun 24
- 43 West 23 Street ManhattanProposed modification of mechanical duct work on the 8th floor, all as per plans. No change of use, occupancy, or use.commercialHVAC / Mechanical· Construction Management &$25KJun 24
- 43 West 23 Street ManhattanProposed minor interior alteration for the 8th floor, all as per plan. No change to egress or occupancy, or use.commercialBuilding, Plumbing· Construction Management &$103KJul 18