New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 802 of 1243
- 330 West 95 Street ManhattanProposed filing for replacement of boiler equipmentcommercialHVAC / Mechanical, Plumbing· Osso Plumbing & Heating$100KNov 5
- 440 East 23 Street ManhattanGeneral construction for interior renovation of Apartment 3G on the 4th floor as shown on drawings filed herewith. PL filed separately under M01238902-S1. No change in use,…multifamilyBuilding, Plumbing· Super G Construction Corp$100KJul 15
- 200 Park Avenue ManhattanInterior tenant fit-out and related finishes as per plans. There will be no change in use, egress, or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Clune Construction Co LP$7.3MSep 23
- 1325 Avenue Of The Americas ManhattanModifications to the existing sprinkler system on the 11th floor as per plans. No change to use, egress or occupancy.commercialFire protection· CMP Piping Inc$113KJul 1
- 1297 Lexington Avenue ManhattanILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - DIG INN. NO CHANGE OF USE, EGRESS OR OCCUPANCY.multifamilySigns· L.S. Sign Co., Inc—Jul 1
- 25 East 17 Street ManhattanERECT NON-ILLUMINATED ACCESSORY WALL SIGN-A, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCYcommercialSigns· City Signs Inc—Jul 1
- 250 Broadway Manhattanremoval non bearing partitions and related finishes. No change in use, egress or occupancy under this application.commercialBuilding· W5 Group LLC$30.2KJul 1
- 250 Broadway Manhattanremoval non bearing partitions and related finishes. No change in use, egress or occupancy under this application.commercialBuilding· W5 Group LLC$51.7KJul 1
- 15 West 15 Street ManhattanInstallation of suspended scaffold for facade work or inspectionmultifamily· Skyline Restoration Inc—Jul 1
- 202 West 58 Street ManhattanHands-on FISP inspection using industrial rope accesscommercial· Vertical Access LLC—Jul 1
- 141 Columbus Avenue ManhattanPartial demolition of west facade for hoist installation in preparation of full demolition of the building, filed under App# M01179112-I1commercialBuilding· Breeze National Inc$50KJul 1
- 180 West End Avenue ManhattanINTERIOR RENOVATION OF APARTMENT 15AB ON THE 15TH FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· Antar Group LLC$85.5KJul 18
- 98 St Marks Place ManhattanRemoval and relocation of existing interior non-load-bearing partitions, and replacement of floor, wall, and ceiling finishes, as well as bathroom and kitchen fixtures, in…multifamilyBuilding, Plumbing· Bodia Inc$90.4KJul 3
- 1931 Madison Avenue ManhattanRIGGING FOR INDUSTRIAL ROPE ACCESS.multifamily· Central Construction MGMT—Jul 1
- 390 Madison Avenue ManhattanGeneral construction modifications taking place on the 2nd floor as per plans filed herewith. No change in use, egress or occupancycommercialBuilding· Structure Tone, LLC$239KJul 1
- 130 5 Avenue ManhattanHVAC work as shown on plans submitted herewith. No change to egress, use or occupancy as of right.commercialHVAC / Mechanical· Structure Tone, LLC$31.7KJul 1
- 130 5 Avenue ManhattanINTERIOR DEMOLITION ONLY AND TENANT ALTERATIONS AT SPECIFIED FLOORS AS SHOWN IN THE CONTRACT DOCUMENTS. NO ALTERATIONS TO EXISTING BASE BUILDING ENVELOPE.commercialBuilding· Structure Tone, LLC$368KJul 1
- 25 Central Park West ManhattanRENOVATION OF EXISTING APARTMENT #3R WITH NEW PARTITIONS & FINISHES. NO CHANGE IN USE, EGRESS AND OCCUPANCY.multifamilyHVAC / Mechanical, Plumbing· Rony's Home Improvement$122KJul 2
- 201 East 66 Street ManhattanCOMBINATION OF APTS 20H AND 20K ON THE 19TH FLOOR UNDER TPPN 3/97 FILED IN CONJUNCTION WITH DOB NOW PL NO CHANGE TO USE, OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· Michael G O'mara$35KJul 1
- 10 Columbus Circle ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST FLOOR SPACE # 112 (DIPTYQUE) AS PER PLANS FILED HEREWITH. NO CHANGE IN…multifamilyBuilding, HVAC / Mechanical· Folor Inc$90.2KJul 8
- 767 5 Avenue ManhattanRemove and construct interior partitions, doors and ceiling as shown on drawings. No change in use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Structure Tone, LLC$1.1MJul 9
- 601 Lexington Avenue ManhattanStructural portion of interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate…commercialBuilding· JT Magen & Company Inc$300KJul 1
- 601 Lexington Avenue ManhattanInterior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.commercialBuilding· JT Magen & Company Inc$13MJul 1
- 110 Delancey Street ManhattanInterior renovation of existing retail space, including removal and installation of partitions for toilet relocation with ventilation. Installation of new lighting fixtures. No…commercialBuilding, Plumbing· Ips Plumbing Corp$37.5KNov 25
- 200 East 87 Street ManhattanFiling for renovations at the cellar, 1st, and 2nd floors. Work includes removal and installation of interior non load bearing partitions, doors, finish work. No change to use,…multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Archstone Builders LLC$850KJul 10
- 240 Greenwich Street ManhattanFiling for removal and installation of non-bearing partitions, doors, and finishes as per plans filed herewith. No change to use, egress, or occupancy.commercialBuilding· Structure Tone, LLC$1.6MJul 1
- 1414 York Avenue ManhattanRENOVATION OF EXISTING OFFICE AT 2ND FLOOR INCLUDING DEMOLITION OF AN EXISTING NON-BEARING INTERIOR PARTITION AND NEWPARTITION WORK TO ENCLOSE A CORRIDOR NICHE AS PART OF THE…multifamilyBuilding· Cook & Krupa LLC$40KJul 1
- 1251 6 Avenue ManhattanMECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OF OCCUPANCYcommercialHVAC / Mechanical· Turner Construction Compa$700KJul 1
- 225 East 36 Street ManhattanHEREBY FILING FOR THE RENOVATION OF UNIT #14OP. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· Hello Chapter LLC$99KJul 1
- 90 Church Street ManhattanALTERATIONS TO EXISTING MECHANICAL SYSTEMS AS PER PLANS FILED HEREWITHcommercialHVAC / Mechanical· Ama Design Build LLC$230KJul 1
- 112 West 72 Street ManhattanPropose interior renovation @ partial 7th floor Apt#7BC with partition and finish work as per plan. No change in use, egress, or occupancy.multifamilyBuilding, Plumbing· Stake Management LLC$73.8KJul 8
- 10 Rockefeller Plaza ManhattanRoof replacement on 6th floor as per plans. No change to use, egress or occupancy.commercialBuilding· Citiline Restoration LLC$933KJul 1
- 202 West 82 Street ManhattanExterior masonry wall repairs at street facade.multifamilyBuilding· Cerina General Contr Inc$122KJul 1
- 870 United Nations Plaza ManhattanMinor renovations to unit 37 and 38C. No change to use, egress or occupancy.commercialBuilding· JDM Contracting Services$154KJul 1
- 5 West 63 Street ManhattanFACADE RESTORATION TO ADDRESS CYCLE 9 LOCAL LAW FINDINGS AS PER PLANS FILED HEREWITH . NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· Kay Waterproofing Corp$307KJul 1
- 30 Carmine Street ManhattanAPPLICATION FILED TO INSTALL NEW EXHAUST DUCT TYPE II FOR NEW ELECTRIC OVEN PIZZA, NON-CHANGE OR EGRESS OCCUPANCY.multifamilyHVAC / Mechanical· J. Sibaja Kitchen And Ve$35KJul 1
- 406 West 14 Street ManhattanRenovation of an existing commercial space on the first floor. No change to use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Glynn Group LLC$352KMar 4
- 110 Waverly Place Manhattaninstallation of new HVAC rooftop equipment to replace existing on existing steel dunnagemultifamilyHVAC / Mechanical· Carefree Air & Water Mang$25KJul 1
- 1 Washington Square North ManhattanMechanical modifications to include fan units upgrade as per plans.commercialBuilding, HVAC / Mechanical· Interstate Mech SVCS Inc$2.9MJul 7
- 2 Penn Plaza ManhattanMechanical work on the 3rd floor (corridor) as indicated on drawings.commercialHVAC / Mechanical· Clune Construction Co LP$60KJul 1
- 200 East 57 Street ManhattanPROPOSE TO RENOVATE EXISTING APT 11 L ON THE 11TH FLOOR MINOR MODIFICATION OF INTERIOR NON BEARING PARTITIONS AND INSTALLATION OF NEW FINISHES ALL AS PER PLANS FILED HEREWITH. NO…multifamilyBuilding, Plumbing· Lempira Restoration Inc$200KJul 11
- 301 East 81 Street ManhattanInterior renovation of partitions and doors for apartment PH17. No change in use, egress or occupancy.multifamilyBuilding, Fire protection, HVAC / Mechanical· V. Disalvo Contracting Co$920KNov 14
- 1 Penn Plaza ManhattanMechanical work on the 31st floor (EyeBio) as indicated on drawings.commercialHVAC / Mechanical· Tri-Star Construction Cor$116KJul 1
- 1745 Broadway ManhattanOFFICE RENOVATION (PENGUIN RANDOM HOUSE) WORK TO INCLUDE MECHANICAL MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyFire protection, HVAC / Mechanical, Plumbing· Par Fire Protection LLC$120KJul 3
- 111 4 Avenue ManhattanModification to existing Mechanical Systems, as per plans. No change to use, egress or occupancy.multifamilyHVAC / Mechanical· J. And F. Refrigeration,$55KJul 1
- 712 West 176 Street ManhattanINSTALLATION OF INDUSTRIAL ROPE ACCESSmultifamily· Central Construction MGMT—Jul 1
- 36 Pell Street ManhattanFacade restorartion including lintel replacement, miscellaneous brick replacement & mortar joint re-pointing, miscellaneous window sill replacement at locations shown on…multifamilyBuilding· Aa & Za Construction Corp$90.6KJul 1
- 920 5 Avenue ManhattanInterior renovation of apt 8A to include window replacement and cut new through wall opening for a new unit ventilator.multifamilyBuilding, HVAC / Mechanical, Plumbing· Dsa Builders Inc$825KJul 11
- 211 Central Park West ManhattanInterior renovation of existing apt #14D on the 14h Floor. No change to use, egress or occupancy under this application. Plumbing and mechanical system works filed separately.multifamilyBuilding· Ari Group, Inc$405KJul 1
- 99 Park Avenue ManhattanAT 19TH Floor Tenant Space and Bathrooms, Remove and Replace Plumbing Lines and fixtures as per plans filed herewith. No change to use, occupancy, or egress.commercialPlumbing· Sean Coakley P & H Inc$87KJul 1