New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 780 of 1243
- 1790 Broadway ManhattanHEREWITH FILING FOR ARCHITECTURE INTERIOR RENOVATIONS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.commercialBuilding· Buch Construction, Inc$25KJul 15
- 458 West 146 Street ManhattanFiling for in kind replacement of HVAC system and minor ductwork installation No change in use egress or occupancy.multifamilyHVAC / Mechanical· Mazgan Air Conditioning A$25KJul 15
- 52 East End Avenue ManhattanPROPOSED MECHANICAL WORK TO REMOVE EXISTING HVAC UNIT AND INSTALL NEW VRP HEAT PUMP, NO CHANGE IN USE, EGRESS AND OCCUPANCY.multifamilyHVAC / Mechanical· Lti Construction Corp$105KJul 15
- 254 West 98 Street ManhattanLIMITED FACADE REPAIRS. REPAIR OF DETERIORATED BRICKWORK AND MORTAR JOINTSmultifamilyBuilding· Tab Restorations Inc$29KJul 15
- 65 East 55 Street ManhattanFacade modifications to take place as per drawings filed herewith. No change in use, egress, or occupancy.commercialBuilding· Royal Concrete And Mason$330KJul 15
- 107 East 105 Street ManhattanFacade repairsmultifamilyBuilding· Roma Scaffolding Inc$819KJul 15
- 430 East 6 Street ManhattanFiling to waterproof the existing roof membrane as per plans. Also replacing existing perimeter railings. No change in use, egress, or occupancy under this application.multifamilyBuilding· Hayden BLDG. Maintenance$643KJul 15
- 400 East 57 Street ManhattanREPLACEMENT OF 13 TON SPLIT SYSTEM ON FLOOR 001 AND THE ROOF. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical, Plumbing· Compact Hvacr LLC$85.5KNov 25
- 1059 Third Avenue ManhattanINSTALLATION OF NEW PARTITIONS AND CEILING FOR NEW MEDICAL OFFICE ON THE 4TH AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding, Fire protection, HVAC / Mechanical· Dependable Mechanical Cor$873KJul 18
- 5 West 14 Street ManhattanGeneral Construction Modification of facade on ground floor as per plans filed herewith. No change in egress, use, or occupancy.multifamilyBuilding· Archstone Builders LLC$740KJul 15
- 60 Madison Avenue ManhattanAPPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· A.R. Equipment LLC$67.1KJul 15
- 2376 Broadway ManhattanInterior renovation for partitions, ceilings and doors for apartment combination of unit 303 & 303A (adjacent units) on 4C/3M floor. No change in use, egress or occupancy.multifamilyBuilding, HVAC / Mechanical, Plumbing· Building Code Partners In$294KNov 17
- 200 Park Avenue ManhattanFiling herewith interior renovation of existing 56th floor space, Magnitude Capital. No change in use, egress or occupancy.commercialBuilding· JRM Construction MGMT LLC$232KJul 15
- 902 Broadway ManhattanPLUMBING MODIFICATIONS TO THE 14TH AND 15TH FLOORS AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialPlumbing· Mac Felder Inc$172KJul 15
- 277 Park Avenue ManhattanRelocation of 4 sprinkler heads and addition of 1 sprinkler head to an existing sprinkler system on the 12th floor. Removal of pre-action valve and connection of existing…commercialFire protection· Sirina Fire Prot Corp$195KJul 15
- 430 East 29 Street ManhattanHerewith filing general construction modifications for Alexandria Center for Life Science - West Tower 1. No change in use, egress, or occupancy.commercialBuilding, HVAC / Mechanical· Empire General Contractin$600KJul 15
- 303 East 60 Street ManhattanExterior Facade repairs as per the plans: Removal/Replacement/Repairs of storefront window & wall flashing, cracked & spalled brick masonry, stone & concrete and stone panel.…multifamilyBuilding· Tribute Restoration Inc$185KJul 15
- 66 West 12 Street ManhattanRemoval and installation of interior nonbearing partitions and related finishes as per plans filed herewith. Scope includes installation of new rainscreen system on the south…commercialBuilding, HVAC / Mechanical, Plumbing· Yorke Construction Corp$2.8MAug 7
- 340 West 72 Street ManhattanINSTALLATION OF NEW SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. FILED IN CONJUNCTION WITH ALT 1 APPLICATION #121237018. NO CHANGE IN USE, EGRESS OR…multifamilyFire protection· Five Borough NYC LLC$100KJul 15
- 630 West 52 Street ManhattanREPLACE EXISTING NON-ILLUMINATED ACCESSORY BUSINESS SIGN ON EXTERIOR WALL. PREVIOUSLY FILED UNDER APPLICATION # 102077663 (DELIVERY ALLIANCE)commercialSigns· Fm95 NY LLC$51KJul 15
- 3857 9 Avenue Manhattanfiling to legalize completed work. Structural work includes a new north facade reinforced concrete masonry wall, connected to existing structure.commercialBuilding· Dinaco Contracting Corp—Jul 15
- 465 Park Avenue ManhattanINTERIOR RENOVATION OF EXISTING BATHROOM IN APARTMENT 2001/2002 ON THE 20TH FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· Moreland Construction GR$34.9KJul 17
- 60 East 93 Street ManhattanProposed demo sequence / methods and means for a single-family home. no change to use, occupancy or egress.commercialBuilding· Highline Construction GR$52KJul 15
- 310 West 153 Street ManhattanNEW PARAPET WALLS & FACADE REPAIRS WHERE IDENTIFIED ON PLANS TO ADDRESS MULTIPLE ECB VIOLATIONS, (35581635J, 35636084H, 35639951K, 35639952M,35639953Y,35644211L, 35643165P,…multifamilyBuilding· A&R Construction Group Of—Jul 15
- 740 8 Avenue ManhattanPlumbing work in conjunction with construction of a new building.commercialPlumbing· Donato Plumbing Group Inc$789KJul 15
- 322 5 Street BrooklynINSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilySolar· Brooklyn Solarworks LLC$52.4KJul 15
- 177 Hull Street BrooklynINSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilySolar· Brooklyn Solarworks LLC$55.8KJul 15
- 8222 18 Avenue BrooklynINTERIOR RENOVAITON OF AN EXISTINNG COMMERCIAL SPACE AT THE FIRST FLOOR. RELATED PLUMBING WORK TO BE FILED UNDER A SEPARATED APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding, Plumbing· New Land Construction NY$42KDec 11
- 129 26 Street BrooklynMINOR INTERIOR ALTERATION , PLUMBING & GAS FIXTURES (NO EXTERIOR WORK.)commercialPlumbing· Boris Mechanical Inc$172KJul 15
- 6314 23 Avenue BrooklynRepairs to fire damaged apartment located at first floor at left side of front entry. Plumbing work filed under DOBNOW job B01245003-I1. No change in use, egress or occupancy.multifamilyBuilding· M. Marin Restoration Inc$35KJul 15
- 7002 3 Avenue BrooklynRENOVATE EXISTING OFFICE SPACE (USE GROUP 6 AS PER C OF O # 211314) AND INSTTALL NEW COUNTERS, SHELVES AND CERAMIC TILES FLOORING FOR THE PROPOSED PHARMACY (USE GROUP 6 AS PER…multifamilyBuilding· Golden Saw Construction C$28KJul 15
- 840 East 8 Street BrooklynCONCRETE REPAIRS AND STEEL REINFORCING. NO CHANGE TO USE, EGRESS, OR OCCUPANCYmultifamilyBuilding· Eci Contracting Group Inc$67.5KJul 15
- 49 Crown Street BrooklynInstallation of suspended scaffold for facade work or inspection.multifamily· Skyline Restoration Inc—Jul 15
- 2927 Avenue U BrooklynModification to existing plumbing system as per plans filed herewith. No change in use, egress or occupancy under this applicationcommercialPlumbing· Miller PLBG & HTG Inc$239KJul 15
- 550 Gateway Drive BrooklynIT IS PROPOSED TO CHANGE THE EXISTING (M) MERCANTILE STORE TO AN (A3) ASSEMBLY WITH INTERIOR RENOVATION WITH FOOD SERVICES AND AN ADDITION OF 2389 SQFT MEZZANINE AS SHOWN ON PLANS.commercialBuilding, Fire protection, HVAC / Mechanical· Brennan Operating Inc$3.6MJun 15
- 32 Gem Street BrooklynGeneral Construction and structural work to repair Facade indicated on drawings filed herewith. No change in Use Egress or Occupancy under this applicationcommercialBuilding· Xuntos Construction Corp$48.8KJul 15
- 9 5 Street BrooklynFILING SUPPORT OF EXCAVATION WORK TYPE IN CONJUNCTION WITH NB APP B01138039multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· GM 88 Development Corp—Jun 8
- 15 Brevoort Place BrooklynINSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilySolar· Brooklyn Solarworks LLC$73KJul 15
- 536 Myrtle Avenue BrooklynInterior renovation of plan east of 3rd floor. New interior partitions and finishes. Minimal addition of plumbing fixtures and minimal structural work for operable partitions.…commercialBuilding· Talisen Construction Corp$934KJul 15
- 1229 Greene Avenue BrooklynRENOVATION OF 3-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: PROVIDE SUPPORT FOR NEW EXTERIOR BOILER ROOM POD; NO CHANGES TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Procida Construction Corp$216KJul 15
- 160 Himrod Street BrooklynRENOVATION OF 3-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: PROVIDE SUPPORT FOR NEW EXTERIOR BOILER ROOM POD; NO CHANGES TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Procida Construction Corp$216KJul 15
- 431 Evergreen Avenue BrooklynRENOVATION OF 3-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: PROVIDE SUPPORT FOR NEW EXTERIOR BOILER ROOM POD; NO CHANGES TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Procida Construction Corp$216KJul 15
- 375 Central Avenue BrooklynPROPOSED GENERAL SITE WORK FOR EXTERIOR ELEVATED UTILITY POD, INCLUDING SITE DEMOLITION/CLEARING, LAYOUT, EROSION & SEDIMENT CONTROL. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· Procida Construction Corp$68.2KJul 15
- 1240 Greene Avenue BrooklynRENOVATION OF 3-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: PROVIDE SUPPORT FOR NEW EXTERIOR BOILER ROOM POD; NO CHANGES TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Procida Construction Corp$216KJul 15
- 415 Evergreen Avenue BrooklynINSTALLATION OF NEW BOILERS AT THE BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.multifamilyHVAC / Mechanical· Miller PLBG & HTG Inc$700KJul 15
- 415 Evergreen Avenue BrooklynRENOVATION OF 3-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: PROVIDE SUPPORT FOR NEW EXTERIOR BOILER ROOM POD; NO CHANGES TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Procida Construction Corp$216KJul 15
- 143 Palmetto Street BrooklynRENOVATION OF 3-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: PROVIDE SUPPORT FOR NEW EXTERIOR BOILER ROOM POD; NO CHANGES TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Procida Construction Corp$166KJul 15
- 1251 Decatur Street BrooklynREFURBISH THE EXISTING BUILDING. NEW PARTITIONS AS INDICATED ON PLANS. CONVERT BUILDING FROM TWO FAMILY TO FOUR FAMILY RESIDENCE.multifamilyBuilding· Clarkes Empire Inc$416KJul 15
- 383 Knickerbocker Avenue BrooklynAPPLICATION FILED IN CONJUCNTION WITH ALT-CO APPLICATIONS B00688296,B00688300, B00688301, ADDING COMUNITY FACILITY SPACE ON GROUND FLOORmultifamilyBuilding· R & S Contracting NY Inc$30KJul 15
- 238 5 Avenue BrooklynSUBSEQUENT DOCUMENTS TO DO MECHANICAL IN CONJUNCTION TO ALT-1 FILINGmultifamilyHVAC / Mechanical· Merrick Real Estate GP In$40KJul 15