New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 716 of 1243
- 87-52a Parsons Boulevard QueensINSTALL THE PLUMBING FIXTURES, COOKING EQUIPMENT, AND MECH. FIRE SUPPRESSION SHUT OFF IN A RESTAURANT STORE AS SHOWN IN DRAWING. THERE IS NO CHANGE IN USE, OCCUPANCY OR EGRESS…commercialPlumbing· G.M.A. Plumbing & Heating$30KAug 19
- 158-15 Liberty Avenue QueensDirect replacement of two (2) existing hot water heating boilers with new at existing locations.commercialPlumbing· Ferko Plumbing & Heating$72KAug 19
- 94-23 40 Drive QueensMINOR INTERIOR RENOVATION IN CELLAR, 1ST TO 3RD FLOOR OF EXISTING 3 FAMILY HOUSE (LETTER OF NO OBJECTION# 2025-063), INCLUDING PARTITION WORK AS PER PLAN. NO CHANGE IN USE,…multifamilyBuilding, Plumbing· DW Plumbing Inc$249KNov 3
- 181-14 Hillside Avenue QueensInterior renovation of the existing store to convert it into a new restaurant, as per the plans. No change in use, occupancy, or egress is involved under this application.commercialBuilding, Plumbing· Arkenstone Builders Inc$313KSep 26
- 122-02 Roosevelt Avenue QueensInstallation of temporary standpipe system as per plans.commercial· Rael Automatic SPR.Co Inc$150KAug 19
- 179-03 Union Turnpike QueensPROPOSED TO DIVIDE EXISTING STORE INTO 2 STORES AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· Arkenstone Builders Inc$114KAug 19
- 66-26 Metropolitan Avenue QueensREPLACE EXISTING ILLUMINATED GROUND SIGN PREVIOUSLY FILED UNDER APPLICATION #401532819. EXISTING GROUND STRUCTURE #401532828 TO REMAIN (THE SHOPS AT RENTAR PLAZA)commercialSigns· North Shore Neon Sign LLC$38.8KAug 19
- 61-35 Junction Boulevard QueensPROPOSE TO RENOVATE THE BAKERY DEPARTMENT AT COSTCO AS PER THE PLANS SUBMITTED HEREWITH. PLUMBING AND MECHANICAL APPLICATIONS TO BE FILED SUBSEQUENTLY.multifamilyBuilding, HVAC / Mechanical, Plumbing· FDS Mechanical Inc$244KSep 4
- 68-15 Selfridge Street QueensRoof replacement down to existing wood deck as per plans; no change to use, egress, or occupancy.multifamilyBuilding· Futura Builders Group Inc$335KAug 19
- 57-22 Myrtle Avenue QueensINTERIOR RENOVATION IN CELLAR, 1ST TO 3RD FLOOR AND ROOF, CONVERSION OF 2ND AND 3RD FLOOR FROM COMMERCIAL TO RESIDENTIAL USE AS PER PLAN, OBTAIN NEW C OF O.commercialBuilding, Plumbing· Q&F Construction Inc$359KOct 8
- 79-15 37 Avenue QueensSUBSEQUENT APPLICATION FILED TO AMEND DRAWINGS INDICATING MODIFICATIONS.multifamilyBuilding· Oasis Plomo Corp$97KAug 19
- 30 East 31 Street ManhattanINITIAL INDUSTRIAL ROPE ACCESS CD5 FOR INSPECTIONmultifamily· Sato Construction Co. Inc—Aug 19
- 170 West 48 Street ManhattanInstallation of a directly illuminated changeable copy LED advertising projecting sign. (SIGN 12)commercialSigns· North Shore Neon Sign LLC$27.2KAug 19
- 40 West 137 Street ManhattanUse of temporary platform as per plans filed herewith. This application is filed in conjunction with NB-121207648.commercialHVAC / Mechanical· R & R Scaffolding LTD$100KAug 19
- 426 West 48 Street ManhattanInstallation of suspended scaffold for facade inspection/repair.multifamilyBuilding· GV Contracting Group Inc—Aug 19
- 71 Payson Avenue ManhattanINSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilySolar· Brooklyn Solarworks LLC$59.8KAug 19
- 181 East 90 Street ManhattanInstallation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.multifamilyBuilding· Prat Enterprises Corp—Aug 19
- 201 East 61 Street ManhattanFACADE REPAIR WHICH INCLUDES STUCCO REPAIR, GRINDING & POINTING, BRICK REPAIR & CRACK FILL @ EXPOSURE 1, EXPOSURE 2, EXPOSURE 3 AND EXPOSURE 4. SIDEWALK SHED FILED UNDER SEPARATE…multifamilyBuilding· Sardar Restoration Corp$32.6KAug 19
- 518 West 57 Street ManhattanInstallation of suspended scaffold for facade work or inspectioncommercial· Dna Contracting LLC—Aug 19
- 79 Mott Street ManhattanPROPOSED INTERIOR RENOVATION ON FIRST FLOOR TO AN EXISTING RETAIL SPACE IN AN EXISTING 5-STORY BUILDING.multifamilyBuilding· L&L Construction Develop$68.8KAug 19
- 199 Water Street ManhattanSprinkler work for restroom renovation on marketing floors 20 & 21 with tenant fitout and corridor work on marketing floor 21 (construction floors 19 & 20)commercialFire protection· Psi Partners, LLC$75KAug 19
- 199 Water Street ManhattanPlumbing work for restroom renovation on marketing floors 20 & 21 with tenant fitout and corridor work on marketing floor 21 (construction floors 19 & 20)commercialPlumbing· A&A Plumbing Corp$275KAug 19
- 8 West 40 Street ManhattanMechanical work during renovation on 11th floorcommercialHVAC / Mechanical· Nucor Construction Corp$110KAug 19
- 8 West 40 Street ManhattanGeneral construction on 11th floorcommercialBuilding· Nucor Construction Corp$130KAug 19
- 200 East 65 Street ManhattanREINFORCEMENT OF CONCRETE SLAB AROUND EXISTING OPENING WITH STEEL STRAP PLATES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE TO OCCUPANCY, USE, OR EGRESS.multifamilyBuilding· Sciame Construction LLC$27.5KAug 19
- 521 West 181 Street ManhattanHVAC work for the Direct replacement of RTU and split system condensers.commercialHVAC / Mechanical· Master Comfort LLC$25KAug 19
- 361 Broadway ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola.multifamily· Structual Presv System—Aug 19
- 100 West 93 Street ManhattanMODIFICATION AND INSTALLATION OF PLUMBING FIXTURES.multifamilyPlumbing· Orbit PLBG & HTG Inc$35KAug 19
- 1445 3 Avenue ManhattanInterior renovation of commercial spaces on the first floor and cellar. New finish materials on floor, walls, new drop ceiling, and new non bearing partitions. All asper…multifamilyBuilding, Plumbing· Aqueduct Mechanical Corp$474KAug 20
- 60 Madison Avenue ManhattanAPPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 12TH FL AND PENTHOUSE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS,…commercialBuilding· Dimar Services Corp$95.6KAug 19
- 241 Central Park West ManhattanFiling interior renovation to 11th floor apartment #11D as per plans. No change in use, egress, or occupancy under this application.multifamilyBuilding, Plumbing· The Puma Home Repair And$250KAug 20
- 1 Penn Plaza ManhattanSprinkler work on the 27th floor (Norstella) as indicated on drawings.commercialFire protection· KG Sprinkler Corp$29KAug 19
- 1 Penn Plaza ManhattanPlumbing work on the 27th floor (Norstella) as indicated on drawings.commercialPlumbing· Donato Plumbing, Inc$31.9KAug 19
- 440 East 77 Street ManhattanREPLACE BOILER AND GAS/OIL BURNER.multifamilyHVAC / Mechanical, Plumbing· Frank Moore$80KSep 15
- 85 Fourth Avenue ManhattanREPARATION OF THE RAMP FOR VEHICULAR ACCESS TO THE CELLAR GARAGE., ONLY, AND NOT FOR PEDESTRIAN ACCESS TO THE BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.multifamilyBuilding· Sato Construction Co.Inc$132KAug 19
- 1325 Avenue Of The Americas ManhattanModifications to the existing sprinkler system on the 17th floor as per plans. No change to use, egress or occupancy.commercialFire protection· Bedrock Mechanical Inc$73.5KAug 19
- 1325 Avenue Of The Americas ManhattanModifications to the existing plumbing system on the 17th floor as per plans. No change to use, egress or occupancy.commercialPlumbing· Bedrock PLBG. & HTG., Inc$52.5KAug 19
- 1325 Avenue Of The Americas ManhattanModifications to the existing HVAC system on the 17th floor as per plans. No change to use, egress or occupancy.commercialHVAC / Mechanical· Structure Tone, LLC$659KAug 19
- 1325 Avenue Of The Americas ManhattanMinor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 17th floor as per plans. No change to use, egress or occupancy.commercialBuilding· Structure Tone, LLC$1.6MAug 19
- 425 Park Avenue ManhattanPLUMBING WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialPlumbing· Geoffrey A. Lagas & Assoc$27.3KAug 19
- 41 West 23 Street ManhattanGENERAL CONSTRUCTION TO RENOVATE EXISTING 1ST FLOOR COMMERCIAL SPACE. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, NEW PLUMBING, AND NEW DROPPED CEILINGS. NO CHANGE IN USE,…multifamilyBuilding, HVAC / Mechanical, Plumbing· Redirecting Lic Inc$168KSep 19
- 550 West 34 Street ManhattanInterior Renovations to existing office spacecommercialBuilding, HVAC / Mechanical· Newgrange Construction Co$205KAug 21
- 485 Park Avenue ManhattanINTERIOR BUILD OUT WORK FOR RETAIL STORE AT THE FIRST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.multifamilyBuilding· TJ Everlasting Cont Corp$66.8KAug 19
- 33 East End Avenue ManhattanNO WORK - LEGALIZATION - SUPERSEDE. Minor plumbing work related to app 103616767, which was filed 2003 to combine units. The OT permit was issued and all work completed. The…multifamilyPlumbing· Marquis P & H Co., Inc—Aug 19
- 60 East 88 Street ManhattanInterior renovation of existing ground floor residential lobby. No change to Use, Egress, or Occupancy.multifamilyBuilding· Gala Designs Corp$120KAug 19
- 878 Madison Avenue ManhattanReplace two condensing units and three air handlers with three condensing units and three air handlers.multifamilyHVAC / Mechanical· Emcor Services NY/NJ Inc$75KAug 19
- 17 State Street ManhattanMODIFICATION OF EXISTING OFFICE. INSTALLATION OF WALLS, DOORS, FIXTURES, AND FLOOR FINISHES AS PER PLANS FOR THE 4TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Tri-Star Construction Cor$1.2MSep 5
- 237 First Avenue ManhattanPARAPET REPLACEMENT ALONG EAST 14TH STREET, LINTEL REPLACEMENT AND SPOT POINTING . NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Elbe Construction LLC$107KAug 19
- 20 East 9 Street ManhattanRENOVATION OF APT. 21F ON 21ST FLOOR WITH PARTITON WORK AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EXIT.multifamilyBuilding, Plumbing· Moonk Enterprise Inc$167KAug 20
- 940 Park Avenue ManhattanEXTERIOR RESTORATION: BRICK REPLACEMENT, LINTEL AND SILL REPLACEMENT, RAILING INSTALLATION, AND MSIC. FACADE REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Prat Enterprises Corp$206KAug 19