62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 694 of 1243
- 474 West 238 Street BronxNew domestic water backflow preventer and booster pump installation per plans. No change in use, egress or occupancy.multifamilyPlumbing· G.Bassolino Plumbing LTD$80KSep 2
- 221 Forest Avenue Staten IslandSUSPENDED SCAFFOLDOUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AT 221 FOREST AVENUE, STATEN ISLAND, NY 10301commercial· Arti Restoration Inc—Sep 2
- 309 St Pauls Avenue Staten IslandExterior restorationcommercialBuilding· Preserv BLD Restor MGT In$273KSep 2
- 45-18 Court Square QueensIRA for work being done Alpha and Gamma sector locationscommercial· PPM Telecom LLC—Sep 2
- 5-34 47 Avenue QueensINSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilySolar· Brooklyn Solarworks LLC$42.5KSep 2
- 33-59 154 Street QueensINTERIOR RENOVATION OF EXISTING 3 FAMILY DWELLING ON CELLAR, 1ST, 2ND AND 3RD FLOOR AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.multifamilyBuilding, Plumbing· NY Building Associates In$186KSep 18
- 134-47 Springfield Boulevard QueensProposed interior renovation at partial 1st floor commercial space of existing 2 story mixed used building with minor partition and finish work as per plan. No change in use,…commercialBuilding· Aw Max Resale Group Inc$70KSep 2
- 22-63 36 Street QueensINSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCYmultifamilySolar· Tom Petersen Architect, LLC$36.4KSep 2
- 41-18 163 Street QueensINTERIOR RENOVATION OF 1ST FLOOR OF EXISTING 3 STORY BUILDING. CONSTRUCTION WORK AS PER PLAN. NEW PARTITION, CEILING, FLOORING AND PAINTING THROUGHOUT. NO CHANGE IN EGRESS, USE,…multifamilyBuilding· Cube Builders Group NY$25.2KSep 2
- 41-71 Bowne Street QueensRENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR WITH PLUMBING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.commercialPlumbing· Amc PLBG, HTG & CLNG, Inc$80KSep 2
- 41-71 Bowne Street QueensRENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR WITH GENERAL CONSTRUCTION: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. INSTALL NEW ADA TOILET AS PER PLAN. MECHANICAL WORK…commercialBuilding, HVAC / Mechanical· Kale Construction Inc$100KSep 2
- 41-05 46 Street QueensRENOVATION OF EXISTING STORE ON FIRST FLOOR: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES AND MECHANICAL SYSTEM INCLUDE RELATED VENTILATION DUCTWORK AND EXHAUST FAN AS PER PLAN.…multifamilyHVAC / Mechanical· Song Of Songs Constr Inc$28KSep 2
- 98-05 63 Road QueensIRA to assist with Condition Assessmentmultifamily· Skyline Access LLC—Sep 2
- 169-13 90 Avenue QueensInstallation of 13.2 kw solar energy system on roof. No change of occupancy, use or egress.multifamilySolar· Accord Power Inc$52.8KSep 2
- 177-11 109 Avenue QueensAPP. FOR PLUMBING WORKS FOR REMOVAL OF ALL EXISTING GAS EQUIPMENT INCLUDING FURNACE, HEATING BLOWER, HOT WATER TANK, DRYER AND ALL ACCESSORIES, PIPES, CONNECTIONS AND THE METER…commercialPlumbing· Ilg Mech Services, Inc$40KSep 2
- 32-34 60 Street QueensREMOVE ILLEGAL PARTITION WALL & DOORS AND RESTORE BACK TO PRIOR LEGAL CONDITION AS PER PLAN. REMOVE ILLEGAL KITCHEN AND 3-PC BATHROOM IN CELLAR.NO CHANGE IN USE, EGRESS OR…multifamilyPlumbing· John Fitzgerald PLBG &HTG$30KSep 2
- 60-90 67 Avenue QueensFILED THIS APPLICATION TO REMOVE THE VIOLATION #34282123J FOR 4 FAMILY BUILDING OF BASEMENT. REPLACE DOORS & INTERIOR WALL @ BASEMENT. REFURBISHING WALLS, CEILING & FLOOR @ 2ND…multifamilyBuilding· Right Choice Construction$61.2KSep 2
- 4521 Greenpoint Avenue QueensMinor interior renovation of existing commercial space at cellar and first floor. Remove all existing finishes as per plans, new commercial kitchen exhaust system, fire…commercialBuilding, HVAC / Mechanical· Rddny Design Build Corp$128KSep 2
- 42-62 Hunter Street QueensTO INSTALL PARTITION WALLS FOR EXISTING RETAIL SPACE WITH GENERAL CONSTRUCTION AND INSTALL COMMERICAL HOOD WITH MECHANICAL WORK TYPE AS PER PLAN FILED HEREWITH. NO CHANGE OF USE,…multifamilyBuilding· Kale Construction Inc$294KSep 2
- 34-41 48 Street QueensReplacement of roof mounted air conditioning unit. All existing ductwork to remain. No change in use egress and occupancy.commercialHVAC / Mechanical· Emcor Services NY/NJ Inc$40KSep 2
- 69-32 Austin Street QueensADD NEW PLUMBING FIXTURES AND GAS EQUIPMENT IN AN EXISTING RESTAURANT AT BASEMENT. PLUMBING WORK IS FILED IN CONJUNCTION WITH #Q01232905-I1commercialPlumbing· Dependable Mech Corp$106KSep 2
- 87-87 169 Street QueensFULL DEMOLITION OF A 2-STORY BUILDING WITH CELLARcommercialDemolition· Yafe Meod Corp$120KSep 2
- 162-21 Jamaica Avenue QueensInterior renovation as per planscommercialBuilding· H Building Management Inc$166KOct 3
- 98-01 159 Avenue QueensRemove asphalt pavement, concrete stairs and handrails, play structures and safety tiles, iron fence and gates. Install asphalt pavement, concrete pavement, concrete ramps and…commercialBuilding, Plumbing· Rizco Contracting Corp$299KSep 3
- 25-64 Steinway Street QueensREM OLD ONE BOILER, INSTALL TWO NEW BOILER SmultifamilyHVAC / Mechanical· Nice Plumbing Corp$30KSep 2
- 183-02 Union Turnpike QueensT-Mobile: Installation and replacement of antennas with replacement and relocation of RRUs on the roof. All work is in compliance with TPPN 5/98. No change in use, egress or…commercialRoofing· Comcell Construction Corp$33.6KSep 2
- 401 West 79 Street ManhattanPROPOSED INSTALLATION AND REPLACEMENT OF SOME SPRINKLER HEADS.commercialFire protection· Sirina Fire Prot Corp$896KSep 2
- 29 11 Avenue ManhattanTemporary Installation in Auditorium at 3RD FL to be removed after eventcommercialBuilding· Good Sense & Co.Product S$150KSep 2
- 251 West 80 Street ManhattanFILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.commercial· Maspeth Contracting Corp—Sep 2
- 49 West 45 Street ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION WITH SLAB OPENINGS, FIRE RATED SHAFT WALLS FOR NEW ELEVATOR FROM THE CELLAR, TO THE 1ST FLOOR AND 1ST FLOOR MEZZANINE AS PER PLANS FILED…commercialBuilding· Acs Environmental & Const$158KSep 18
- 11 East 29 Street ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Sep 2
- 10 Vanderbilt Avenue ManhattanInterior demolition on Construction Floor 19 (Marketing Floor 26) as per plans filed herewith. No change in egress, use or occupancy.commercialBuilding· L&K Partners, Inc$178KSep 2
- 10 Vanderbilt Avenue ManhattanMechanical demolition on construction Floor 19 (Marketing Floor 26) as per plans filed herewith. No change to use, egress, or occupancycommercialHVAC / Mechanical· L&K Partners, Inc$78.5KSep 2
- 420 West 206 Street ManhattanInstallation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.multifamilyBuilding· KLG Contracting Inc—Sep 2
- 185 East 85 Street ManhattanFACADE INSPECTION Designated Primary Site supervisor: Jesus Decolamultifamily· Structural Preservation S—Sep 2
- 170 West 48 Street ManhattanInstallation of a directly illuminated changeable copy LED advertising projecting sign. (SIGN 15)commercialSigns· North Shore Neon Sign LLC—Sep 2
- 49 West 12 Street ManhattanInstallation of suspended scaffold for facade work and/or inspection. Amend #2, added outrigger beam detailmultifamily· Skyline Restoration Inc—Sep 2
- 201 East 17 Street ManhattanRENOVATE EXISTING APARTMENT; PARTITIONS, FLOORING, CABINETRY, COUNTERS, DOORS, CEILING, FIXTURES & FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Next Generation Restorati$44KSep 2
- 212 Warren Street ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Sep 2
- 201 West 75 Street ManhattanFILING OF FACADE REPOINTING AND PAINTING AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USEcommercialBuilding· Safetech Enterprises Corp$60KSep 2
- 6 East 39 Street ManhattanFacade repaircommercialBuilding· Bellet Construction Co.In$57.9KSep 2
- 210 East 63 Street ManhattanPENTHOUSE TERRACE DECK REHABILITATION WHICH INCLUDES MINOR FACADE REPAIR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED FILED UNDER…multifamilyBuilding· Az Group Contracting Inc$175KSep 2
- 555 Madison Avenue ManhattanArchitectural modifications taking place on the 1st floor as per plans filed herewith. No change in use, egress or occupancy.commercialBuilding· Icon Interiors Inc$100KSep 2
- 299 Park Avenue ManhattanGeneral Construction to take place on the 4th Floor as per drawings filed herewith. No change in use, egress, or occupancycommercialBuilding· James E Fitzgerald Inc$765KSep 2
- 50 Riverside Drive ManhattanInstallation of material hoist. Amend #1, change in tieback and anchor for masonry, added Ctwt and tie back to beam detail, and added concrete wall anchor detailmultifamily· Skyline Restoration Inc—Sep 2
- 1 Morningside Drive ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Sep 2
- 190 6 Avenue ManhattanINTERIOR RENOVATION WORKS AT EXISTING APTS 5FN AND 6F. NO CHANGE IN EGRESS, USE OR OCCUPANCY.multifamilyBuilding, Plumbing· T & T Plumbing Inc$83KNov 10
- 152 7 Avenue South ManhattanWORK TO COMMERCIAL SPACE AT THE 1ST FLOOR OF A 5 STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE INTERIOR PARTITION WORK AND THE INSTALLATION OF A NEW HVAC SYSTEM. NO…multifamilyBuilding, HVAC / Mechanical· Baba Construction Corp$75.4KMar 4
- 225 East 93 Street ManhattanInstallation of material hoistmultifamily· Skyline Restoration Inc—Sep 2
- 155 East 44 Street ManhattanGeneral construction modifications taking place on the 11th floor as per plans filed herewith. No change in use, egress or occupancy.commercialBuilding· Phase 3 Interiors LLC$195KSep 2